Sie sind auf Seite 1von 71

TENDER SUMMARY

MPI Oman Date: 30-Dec-17

Tender Title MEP FOR INMA BUILDING AT GHUBRA


Tender Ref: T 165
OPTION -1 WITH SAMSUNG AC
Contract Period 1 Months Labour Hrs (Rates) 1.300
Gross Built Up Area 7,791 m2 Labour Hrs (Prelims) 68,296.000
Rate /m2 Err:509 RO/m2 Total Hrs 1.100
Avg No. of Men
Peak - .0
A. DIRECT COSTS % Total
1. Labour #REF! #REF!
2. Plant Err:509
3. Materials Electrical 116,342.000 Err:509
4. Materials External Err:509 Err:509
5. Materials Plumbing 38,976.250 Err:509
4. Materials HVAC 172,170.231 Err:509

Sub Total; Direct Work (Materials) Err:509 Err:509


7. Subcontractors Electrical 72,350.000 Err:509
8. Subcontractors Pluming Err:509 Err:509
9. Subcontractors HVAC 66,400.000 Err:509
10. Subcontract External 125,000.000 Err:509
11. Subcontractors Labour - Err:509
12. Subcontractors PC Sums Err:509
Sub Total; Direct Work (Subcontractors) Err:509 Err:509

A. TOTAL DIRECT COSTS Err:509 Err:509

B. INDIRECT COSTS
Staff & Attendant Labour 18,364.500 Err:509
Transport 1,557.900 Err:509
Offices and Stores Err:509
Additional Plant - .0 Err:509
Scaffolding Err:509
Miscellaneous Err:509
Bonds & Insurances Err:509
Designs and Detailing Err:509
Client's and RE Requirements Err:509
Camp Adjustment Err:509

B. TOTAL INDIRECT COSTS 19,922.400 Err:509

C. OTHER COSTS
1. Escalation Err:509
2. Finance Charges & Exchange Rate - warranty @ 0% Err:509 Err:509
3. Risk Analysis (Quantities @ 0.25%of Direct Costs) Err:509 Err:509
4. Contingency Err:509 Err:509
5. Other Fees, Taxes & Levies Err:509
6. Tender Costs Err:509

C. TOTAL OTHER COSTS Err:509 Err:509

SUBTOTAL DIRECT , INDIRECT AND OTHER COSTS Err:509 Err:509

D. CLIENT'S SUMS
1. Provisional Sums Err:509
2. Dayworks - .0 Err:509
3. Contingency Client - .0 Err:509

D. TOTAL CLIENT'S SUMS - .0 Err:509

E. OVERHEADS & PROFIT


1. On Direct Works Err:509 Err:509
2. On Sub Contractors Err:509 Err:509
4. On Indirect Costs - .0 Err:509
5. On Other Costs Err:509
6. On Provisional Sums Err:509
7. On Dayworks Err:509
8. On Client's Contingency Err:509

E. TOTAL OVERHEAD & PROFIT Err:509 Err:509

F. TOTAL OF TENDER Err:509


MPI Oman
PACKAGE TOTALS Date: Final
144,757.308

7,791.050
PACKAGE SUMMARY
Code Description RO/m2 Dry Cost Labour Labour Subcon Plant Material Subcon Discounts
considered
ELECTRICAL
SMBD 1.39 10,837.500 1,300.000 11,450.000 - 15%
Distribution board 0.37 2,897.500 350.000 2,700.000 - 5%
cable 5.05 39,330.000 5,100.000 36,300.000 - 5%
Equipment Connection 1.29 10,042.000 1,200.000 8,842.000 - 0%
small power 0.33 2,610.000 350.000 2,550.000 - 10%
Lighting Installation 4.41 34,385.000 4,600.000 48,300.000 35%
Fire alarm system 0.76 5,950.000 7,000.000 15%
PA system 0.91 7,110.000 7,900.000 10%
Structured Cabling 1.02 7,947.500 9,350.000 15%
TV system 0.14 1,100.000 1,100.000 0%
CCTV 1.64 12,750.000 15,000.000 15%
Lightning protection system 0.52 4,050.000 850.000 3,200.000 0%
Electrical Installation (Sundries) 0.37 2,894.000 394.000 2,500.000 0%
Lift 3.49 27,200.000 32,000.000 15%
Lift (Sundries) 0.22 1,693.000 1,193.000 500.000 0%
TOTAL - A 21.92 170,796.500 15,337.000 - 116,342.000 72,350.000

Plumbing
Plumbing & Drainage System 2.19 17,045.600 2,900.000 16,470.000 - 12%
Foul Drainage System (Sundries) 0.24 1,857.150 158.400 1,698.750 - 0%
Booster Pump , Tank & water Heater 0.97 7,520.000 1,200.000 8,200.000 - 20%
Booster Pump , Tank & water Heater (Sundries) 0.12 964.350 64.350 900.000 -
0%
Sanitary Wares 4.93 38,377.500 1,450.000 10,500.000 33,200.000 15%
Fire Extinguishing System 3.20 24,900.000 - - 33,200.000 25%
Fire Extinguishing System (Sundries) 0.18 1,389.000 181.500 1,207.500 - 0%
TOTAL - C 11.815 92,053.600 5,954.250 38,976.250 66,400.000

AIR CONDITIONING
AC Equipment & Installation (Chiller+ AHUs) 16.84 131,192.308 1,000.000 144,769.231 -
10%
Chilled Water Pump &n Accessories 10,197.000 1,030.000 10,300.000 10%
Chilled Water Piping & Valves 38,000.000 40,000.000 5%
PI & GI Ducting 23,750.000 25,000.000 5%
Grills, Diffusers, SA, FD & VCD 15,361.500 770.000 15,400.000 5%
BMS System 7.70 60,000.000 - 60,000.000 0%
AC & Ventilation system (Sundries) 0.24 1,860.570 366.300 1,701.000 - 10%
TOTAL - D 35.985 280,361.378 3,166.300 172,170.231 125,000.000

FINAL TOTAL #REF! #REF! #REF! #REF! #REF!


PROPOSED RESIDENTIAL APPARTMENTS BUILDING FOR

INMA ON PLOT NO 2078 AT AL GHUBRAH.

Item Qty. Unit

A Allow the PROVISIONAL Sum of R.O.58,000/=. For the following


works to be executed by the main contractor or by specialist Sub-
Contractors and to be expended as directed by the Engineer or
deducted in whole or in part if not required:-

a) Main Electrical supply upto Substation

b) Main Water supply service connection charges

c ) Main Telephone service connection charges

d) Landscaping & Irrigation Works (External)

e) Central Sewage Connection

f) Gas System

Total
B Allow for providing attendance, as described, for the above Item
C Allow for profit and overheads, etc, as described %

BILL NO. 3 PRIME COST & PROVISIONAL


SUMS
CARRIED TO GENERAL SUMMARY
3/1
1280.12.2017 - MAJAN ENGINEERING (QS)
BILL NO. 3

PRIME COST SUMS &


PROVISIONAL SUMS

Rate R.O. Bz.

4,000.000

5,000.000

5,000.000

15,000.000

5,000.000

24,000.000

58,000.000
RO.
PROPOSED RESIDENTIAL APPARTMENTS BUILDING FOR BILL NO. 4 Mark Up 1.000
INMA ON PLOT NO 2078 AT AL GHUBRAH. MAIN BUILDING
Item Qty. Unit Rate Amount
BUILDER'S WORK IN CONNECTION WITH SERVICES
R.O. BZ R.O. BZ

PLUMBING AND SANITARY INSTALLATIONS


Allow for making holes, chases and the like in floors and walls and making good
1 435.000

Allow for providing sleeves for ducts and pipes passing through walls and slabs and
making good 1

Allow for reinforced poured concrete plinths, supports, filling etc., for tanks,
fittings, pipe runs and the like including all necessary reinforcement and form work

Allow for internal trenching work for plumbing, sanitary drainage and fire fighting
installations including all builders work as required
Allow for all other incidental and/or builders work and ancillary items as required
for a complete installation of plumbing and sanitary installations. 1 160.000

AIR-CONDITIONING AND VENTILATION INSTALLATIONS


- .0

Allow for making holes, chases, mortises and the like in floors and walls including
for future connections and making good as specified 1 182.000

Allow for providing sleeves for ducts pipes and the like passing through walls and
slabs and making good 1 107.500

Allow for sealing gaps between sleeves, holes, openings and sleeves, ducts, pipes
and the like 1 160.000

Allow for fire sealing gaps between sleeves, holes, openings and sleeves, ducts
,pipes and the like - .0

Allow for reinforced poured concrete plinths, supports, etc., for tanks, pipe runs and
the like including all necessary reinforcement and formwork - .0

Allow for all other incidental and/or builders work and ancillary items as required
for a complete installation of air- conditioning and ventilation installations 1 635.000

COLLECTION
BUILDER'S WORK IN CONNECTION WITH
SERVICESE
Carried to Summary of Bill No. 4
PLUMBING INSTALLATION
FOUL DRAINAGE
Pipe Works & Gutter Works
UPVC pipes including fittings including all joints, connections, cleaning eye,
rodding eye and brackets
A 55 mm diameter 130 m 0.359 46.670
B 80 mm diameter 80 m 0.475 38.000
C 110 mm diameter 720 m 0.760 546.840
D 160 mm diameter 40 m 1.622 64.860
Vent cowl with weathering apron,
E 80mm diameter 5 No. 0.580 2.900
F 110mm diameter 20 No. 0.760 15.190
G 400 x 400mm gulley trap with 300x300mm DI cover and frame 11 No. 28.450 312.950

PLUMBING INSTALLATION..( Cont'd)


FOUL DRAINAGE (Cont’d.)
Air-conditioning condensate drain pipe as specified
Allow for supply and installation of condensate drain from air- conditioning units to
the nearest floor trap/gully trap including insulation with cora cloth and vapour
barrier for condensate drain above false ceiling and on roof as shown in the
drawings and as directed/approved by the Engineer

HPUPVC pipes & fitting to BS 3505 Class-E including all


joints connections and brackets
A 25 mm diameter 0 m 0.206 - .0
B 32 mm diameter 0 m 0.238 - .0
Pipework ancillaries
C 150x150mm uPVC open top trapped floor drain with best quality SS 316 grating, 170 No. 42.550 7,233.500
joints to pipe with cover

PLUMBING INSTALLATION..( Cont'd)


FOUL DRAINAGE (Cont’d.)
Sanitary fittings as per Specification & Drawings
Supply and installation of sanitary fitting including all
necessary, angle valves, fixable hose,outlets,traps, plugs,
chains, fixing bolts, brackets and the like and connecting to
pipework all as specified and shown on drawings

A Wash basins with pedestal, P trap, angle valves / connection rigid Cu pipes & 11 No. 67.600 743.600
mixer
B Wash basin with marble/granite counter 97 No. 72.850 7,066.450
C European floor mounted WC 108 No. 126.400 13,651.200
D Toilet paper roll holder 108 No. 9.500 1,026.000
E Ablution faucet 108 No. 13.700 1,479.600
F CP towel ring with CP bracket 90 No. 8.450 760.500
G CP surface mounted type Soap/sponge/ shampoo holder for Shower 98 No. 8.450 828.100

H 600mm long CP towel rail with CP bracket 98 No. 10.550 1,033.900


J Soap Dish 98 No. 6.350 622.300
K Mirror 108 No. 14.800 1,598.400
L Janitor Sink ,angle valves / connection rigid Cu pipes & mixer 6 No. 175.450 1,052.700

PLUMBING INSTALLATION..( Cont'd)


FOUL DRAINAGE (Cont’d.)
Sanitary fittings as per Specification & Drawings
A Shower curtain with SS tube hanger 98 No. 31.160 3,053.680
B Shower Mixer, shower head and Telephone shower 98 No. 11.000 1,078.000
C SS Kitchen sink with mixer & all accessories 52 No. 66.550 3,460.600
D Allow for "P" trap for washing machine, dish wash & air- condition 52 No. 2.650 137.800

E Allow for acoustic insulation, lagging to drainage pipes above false ceiling 1 Item 422.500 422.500

F Allow for connecting drainage & water supply pipes to sink including 1 Item 354.750 354.750
necessary fittings, joints, sealant etc.
Total for Foul Drainage system

PLUMBING INSTALLATION..( Cont'd)


FOUL DRAINAGE (Cont’d.)
Sundries
A Allow for document, 'As Installed' drawings, operation & maintenance 1 Item 227.500 227.500
manuals for sanitary, water services
B Allow for supplying Manufacturer’s recommended tools and spare parts of all 200.000 200.000
items, as specified for sanitary, water services 1 Item

C Allow for training employer’s operating and maintenance staff 1 Item 150.000 150.000
D Allow for any builders work in relation to drainage works like opening, ducts etc. 1 Item 255.000 255.000

E Allow for trial usage of all installations included in this section 1 Item 272.000 272.000
F Allow for providing warranties for plumbing, sanitary installations, 1 Item 100.000 100.000
equipment specified
Total for Foul Drainage system (Sundries)

PLUMBING INSTALLATION..( Cont'd)


HOT AND COLD WATER INSTALLATIONS (Cont'd)
Thermal insulated copper pipes and fittings to EN-1057, R-250
including fittings, valves, connections and brackets as per
specification, in running length
A 15 mm diameter 900 m 1.633 1,469.385
B 22 mm diameter 250 m 4.000 1,000.000
C 28 mm diameter 230 m 5.806 1,335.288
D 35 mm diameter 100 m 9.278 927.755
E 40 mm diameter 170 m 13.908 2,364.301
F 54 mm diameter 80 m 17.000 1,359.960
G 100 mm diameter 0 m 29.505 - .0
Pipework Ancillaries
Isolating valves to BS 5154 series 'B', bronze, wedge gate pattern, as per specified
at approved drawings & specification
H 22 mm diameter 50 No. 10.393 519.625
J 35 mm diameter 30 No. 14.225 426.750
K 40 mm diameter 5 No. 20.575 102.875
L 50 mm diameter 15 No. 38.950 584.250
M 100 mm diameter 0 No. 117.700 - .0
Non-return valves, bronze, spring operated type PN20
N 54 mm diameter (Provisional) 5 No. 26.080 130.400
Lever type tap
P 15 mm diameter bib tap for washing machine 5 No. 5.300 26.500
Insulation for cold water piping
13mm thick flexible closed cell insulation wrapped with canvas
cloth and treated with two coats of anti-fungus approved
moisture barrier for pipes on the roof/ airwell including
hammered aluminium sheet covering as specified, in running length

C 22 mm diameter 270 m 0.810 218.565


D 28 mm diameter 75 m 1.072 80.400
E 35 mm diameter 69 m 1.282 88.458
F 40 mm diameter 30 m 1.608 48.240
G 54 mm diameter 51 m 2.133 108.783
H 100 mm diameter 0 m 4.244 - .0

PLUMBING INSTALLATION..( Cont'd)


HOT AND COLD WATER INSTALLATIONS (Cont'd)
Pipework Ancillaries
Equipment and accessories as specified, including all connections and fittings

A 6000 x 5000 x 2000 mm high GRP panel type insulated water storage tank with 4,647.000 4,647.000
float valve chamber, valves and S.S. nuts & bolts to approval including epoxy
coated base frame on civil pedestals/ foundation
1 No.
B Duplex type (duty andstandby) cold water booster pumpset each delivering 2,018.000 2,018.000
3.1 l/s @ 1.8 bar with RCC pedestal and approved aluminum enclosure,
control panel, timer, valves, shaded roof to cover pump, etc. all complete to the
approval of the Engineer & Employer

1 Set
C Submersible Seweage pump with delivering 1.0 l/s @ 15M head with RCC 1,598.000 1,598.000
pedestal and control panel, timer, valves etc. all complete to the approval of 1 Set
the Engineer & Employer
PAEW approved Water meter
D 35mm diameter 0 No. 154.400 - .0
E Bulk water meter 0 No. 354.400 - .0
F Fire tank water meter 0 No. 204.400 - .0

PLUMBING INSTALLATION..( Cont'd)


HOT AND COLD WATER INSTALLATIONS (Cont'd)
Pipework Ancillaries
MHEW approved Lock-shield Valves
A 35mm diameter 0 No. 39.400 - .0
Strainer for Water Meter
B 54mm diameter 0 No. 54.400 - .0
MHEW approved Isolating Valve
C 35mm diameter 0 No. 22.200 - .0
Equipment and accessories as specified, including all
connections, valves and fittings
D 50 liters capacity electrical water heater 8 Set 65.600 524.800
E 100 liters capacity electrical water heater 8 Set 65.600 524.800
Insulation for hot water piping
19mm thick flexible closed cell insulation wrapped with canvas
cloth and treated with two coats of anti-fungus approved
moisture barrier for pipes above false ceiling as specified, in running length

G 15 mm diameter 200 m 0.821 164.100


H 22 mm diameter 150 m 1.083 162.450
Total for Hot & cold Water system

PLUMBING INSTALLATION..( Cont'd)


HOT AND COLD WATER INSTALLATIONS (Cont'd)
Sundries
A Allow for document, 'As Installed' drawings, operation & maintenance manuals for 1 Item
sanitary, water services
B Allow for supplying Manufacturer’s recommended tools and spare parts of all 1
items, as specified for sanitary, water services Item

C Allow for training employer’s operating and maintenance staff 1 Item


D Allow for protection of entire hot and cold water installation against any form of 1
back siphonage in accordance with BS 6700 1987 Item

E Allow for trial usage of all installations included in this section 1 Item
F Allow for providing warranties for plumbing, sanitary installations, equipment 1 Item
specified
Total for Hot & cold Water system (Sundries)

PLUMBING INSTALLATION..( Cont'd)


RAIN WATER/STORM WATER DRAINAGE
UPVC pipes including all fittings/Valve to BS 4514/1983
including all joints, connections and brackets, in running length
A 110mm diameter pipe m 0.845 - .0
B 160mm diameter pipe (Provisional) m 1.688 - .0
Pipework Ancillaries
C 110 mm diameter roof drain water outlet - Type A No. 6.350 - .0
D 110 mm diameter roof drain water outlet - Type B No. 6.350 - .0
E 110 mm diameter RWFD including accessories for airwell & staircase area No. 13.700 - .0

F 55 dia. Class ‘E’ HDPE pipes& fittings to BS 3505 for storm water discharge m 1.590 - .0
system
G 160mm diameter rain water outlet No. 16.300 - .0
H 1000x150x100mm DI Grating No 70.450 - .0
J 1300x150x100mm DI Grating No 86.200 - .0
K 150x300mm storm water DI Grating m 21.550 - .0
Total for Rain/Strom water drainage system
- .0 - .0
PLUMBING INSTALLATION..( Cont'd) 1 - .0 - .0
RAIN WATER/STORM WATER DRAINAGE - .0 - .0
Manholes - .0 - .0
A Sump Pit, sizes 600 x 600 x 600 mm deep internally in 100mm thick RCC walls - .0 - .0
and floor, 50mm PCC at bottom with 600 x 600 mm heavy double seal ductile iron
cover and frame, etc.., valve, joints to pipe as shown in the in the Drawings & No.
specified.

Sundries - .0 - .0
B Allow for document, 'As Installed' drawings, operation & maintenance Item 237.500 237.500
manuals for sanitary, water services 1
C Allow for supplying Manufacturer’s recommended tools and spare parts of all 52.500 52.500
items, as specified for sanitary, water services Item
1
D Allow for training employer’s operating and maintenance staff 1 Item 52.500 52.500
E Allow for builders works related to rain water outlets like boring, ducts etc. Item 290.000 290.000
1
F Allow for trial usage of all installations included in this section 1 Item 121.500 121.500
G Allow for providing warranties for plumbing, sanitary installations, Item 105.000 105.000
equipment specified 1
Total for Rain/Strom water drainage system(Sundries)

PLUMBING INSTALLATION..( Cont'd)


FIRE EXTINGUISHING SYSTEM
Class 'C' G.I. pipework to BS 1387 and fittings to BS 143
including all joints, fittings, connections and brackets, in running length

A 20 mm dia. pipe complete with fittings m 2.653 - .0


B 25 mm dia. pipe complete with fittings m 3.173 - .0
C 32 mm dia. pipe complete with fittings m 4.091 - .0
D 40 mm dia. pipe complete with fittings m 4.600 - .0
E 50 mm dia. pipe complete with fittings m 6.667 - .0
F 65 mm dia. pipe complete with fittings m 8.413 - .0
G 100 mm dia. pipe complete with fittings m 12.073 - .0
H 150 mm dia. pipe complete with fittings m 14.440 - .0
Valves
J Isolation valves, Zone control valve, Installation valve, Automatic air eliminator, 2,408.083 - .0
sprinkler PRV station, flow switches etc as required, accessories & ancillaries for Item
complete installation
Strainer as shown in the drawing including joints, fittings,
connections, brackets etc.
K 2-way breaching inlet including all (SS 316) stainless steel accessories in 226.667 - .0
approved cabinet with stainless steel door and architrave for wet risers, FHR & No.
Sprinkler system
Sprinkler Head
L Pipe mounted Pendant sprinkler, brass finish No. 3.551 - .0
M 65mm diameter dry riser landing valve No. 52.067 - .0
N Zone control valve (with IV & DV, 200mm diameter) No. 547.333 - .0
P 1500 mm long flexible hose for sprinkler No. 7.545 - .0
Q 25mm automatic air vent No. 9.667 - .0

PLUMBING INSTALLATION..( Cont'd)


FIRE EXTINGUISHING SYSTEM..( Cont'd)
Equipment and accessories
A 19mm dia. x 45m long fire hosereel and (SS 316) cabinet complete with IV & PRV 218.667 - .0
and all accessories, connections and fittings No.

Fire extinguishers and fire blankets including all accessories as specified

B 6kg AFFF Foam spray extinguisher No. 12.500 - .0


C 5 kg carbon dioxide extinguisher No. 15.233 - .0
D Fire blanket No. 5.700 - .0
E Allow for other necessary valves alarm gong, other accessories and expenses which 324.467 - .0
are not specifically included above. But required for proper functioning of the
sprinkler system including warranty Item

F UL listed/ FM approved: Fully Automatic Fire pumpset complete with electrically 19,800.000 - .0
driven duty pump and diesel engine driven stand by pump 28LPS @ 7.5 bar and
jockey pump capacity 1.2LPS @ 8.5 bar complete with pressure vessel 90l, control
panel, angels, interconnecting pipes, interconnecting cables, cable tray, valve etc. Set
all as per Civil Defence requirement

Total for Fire Exitngushing system.

PLUMBING INSTALLATION..( Cont'd)


FIRE EXTINGUISHING SYSTEM..( Cont'd)
Sundries
A Allow for documents, working drawings, ‘As Installed’ drawings, Operation and 1
maintenance manuals for sanitaryware services and fire fighting system Item

B Allow for preparation and approval of co ordinated services layout in co 1 Item


ordination with other agency.
C Allow for unloading and safe storage area at site 1 Item
D Allow for training employer’s operating and maintenance staff 1 Item
E Allow for supplying manufacture’s recommended tools and spare parts of all items, 1
as specified for sanitary, water services and fire fighting system Item

F Allow for trial usage of all installations included in this section 1 Item
G Allow for providing warranties for fire fighting equipment etc as specified 1 Item

H Allow for builders works in connection with fire fighting system including holes, 1 Item
chases, sleeves, pipe brackets, painted casing to exposed pipes, access panels,
weatherproof flashing to vent pipes passing through roof etc.

Total for Fire Exitngushing system (Sundries)

COLLECTION
4/32
4/33
4/34
4/35
4/36
4/37
4/38
4/39
4/40
4/41
4/42
4/43
4/44
4/45
4/46
PLUMBING INSTALLATION
Carried to Summary of Bill No. 4
AIR CONDITIONING AND VENTILATION
Variable Refrigerant Flow (VRF) System
Wall Mounted Unit
Supply, installation, testing and commissioning of VRV type
Wall mounted Split units fixing in position including
refrigerant piping, vibration isolators, insulation, outdoor
condensing units installed on roof. Condensate drain, controls,
thermostat in same finish as the adjacent electrical accessories,
sensors, control wiring, connections from nearest isolators/DP
switches, cable tray, aluminum cladding for exposed
refrigerant pipes etc. all complete as per specifications
schedule and as per shown in the drawings

A Indoor Unit – 2.0 KW No. 245.000 - .0


B Indoor Unit – 4.0 KW No. 291.000 - .0
C Indoor Unit – 5.0 KW No. 299.000 - .0
D Indoor Unit – 7.0 KW No. 332.000 - .0
G VRV Outdoor Unit 10.0 KW No. 1,146.000 - .0
H VRV Outdoor Unit 14.0 KW No. 1,223.000 - .0
J VRV Outdoor Unit 18.0 KW No. 1,375.000 - .0
K VRV Outdoor Unit 16.0 KW No. 1,375.000 - .0
CONDENSATE DRAIN PIPEWORK
uPVC pipes to BS 3505 Class E with insulation
L Allow for all necessary condensate pipework from split AC units to nearest drain Item 292.500 - .0

Total for Air Conditioning Equipment & Installation


AIR CONDITIONING AND VENTILATION …..(Cont'd)
Ductwork Installation for Ventilation/ Extract
Supply and installation of GI ductwork for basement ventilation, toilets extract and
pantry extract including necessary connections, angle, frame stiffeners, insulations
(if required), supports, brackets, plenum boxes, all complete as specified and shown
in the drawing and as approved by Engineer/Client

A 24 gauge sheet in rectangular ductwork m


2 12.400 - .0
B 22 gauge sheet in rectangular ductwork m
2 13.970 - .0
EQUIPMENT
Supply and fixing of extract fans as per Specifications and as per shown in the
Drawing including louvers, electrical connection, controls, supports, brackets,
fixing and flashing etc. all complete
C Wall mounted extract fan 40 Lps, @ 25 Pa No. 15.250 - .0
D Wall mounted extract fan 25 Lps, @ 50 Pa No. 15.260 - .0
E Wall mounted extract fan 30lps @ 25Pa No. 15.260 - .0
F Ceiling mounted fan 25 Lps @ 50 Pa No. 34.920 - .0
G Ducted extract fan@ 80 Lps @ 120 Pa No. 34.920 - .0
H Window mounted extract fan 30lps @ 25Pa No. 15.520 - .0
J Window mounted extract fan 40lps @ 25Pa No. 19.400 - .0
Diffuser
K Extract air diffuser – 150x150mm No. 4.700 - .0
Total for Ventilation ( Material & labour)

AIR CONDITIONING AND VENTILATION …..(Cont'd)


Sundries
A Allow for protective covering and painting to all exposed drainage, water supply, 1 243.000 243.000
fire fighting, pipework and ventilation works Item

B Allow for identification labels, colour coding etc. for complete HVAC works 1 Item 121.500 121.500

C Allow for testing and commissioning of air-conditioning & ventilation system 1 Item 833.000 833.000

D Allow for sealing of all openings through floor & walls for penetration of MEP 1 279.000 279.000
Services, AC ducts etc. with fire rated boards & foam sealants etc. to approval Item

E Allow for document, 'As Installed' drawings, operation & maintenance manuals for 1 Item 226.500 226.500
fire fighting system
F Allow for supplying Manufacturer’s recommended tools and spare parts of all 1 105.000 105.000
items, as specified for fire fighting system Item

G Allow for training employer’s operating and maintenance staff 1 Item 157.500 157.500
H Allow for trial usage of all installations included in this section 1 Item 121.500 121.500
J Allow for providing warranties for HVAC system as specified 1 Item 210.000 210.000
Total for AC &Ventilation ( Sundries) 71,422.175

COLLECTION
4/48
4/49
4/50
AIR CONDITIONING AND VENTILATION
Carried to Summary of Bill No. 4 Collection R.O.
PROPOSED RESIDENTIAL APPARTMENTS BUILDING FOR BILL NO. 4
INMA ON PLOT NO 2078 AT AL GHUBRAH. MAIN BUILDING
Item Qty.
ELECTRICAL INSTALLATION
SUB MAIN INSTALLATIONS
Supply, Install and connect Equipments, control gears, relays,
meters,
Note incoming
- All and outshall
energy meters goingbecircuit
digitalbreakers
type andand all other for prepaid meter
compatible
A necessary
SMDB GFaccessories as per drawings & specifications 1
B SMDB 1F 1 T
o
C SMDB 2F 1
D SMDB 3F 1
E SMDB 4F 1 C
F SMDB PH 1 o
l
G SMDB SF 1 l
Total SMDB e
c
ELECTRICAL INSTALLATION..( Cont'd) t
SUB MAIN INSTALLATIONS ...( Cont'd) i
o
Distribution boards including isolator, ELCB, MCB, n
A MCBELCB
DB SF LL as specified alongwith necessary supports, 1
earthing, cable glands, internal wiring, interconnections and labels R
B DB GF A,B,C,D,E,F,G,H,I 9
C DB GF LL 1 .
O
D DB 1F A,B,C,D,E,F,G,H,I 9 .
E DB 1F LL 1
F DB 2F A,B,C,D,E,F,G,H,I 9
G DB 2F LL 1
H DB 3F A,B,C,D,E,F,G,H,I 9
J DB 3F LL 1
K DB 4F A,B,C,D,E,F,G,H,I 9
L DB 4F LL 1
M DB PH A,B,C,D,E,F 6
N DB 5F LL 1 T
o
P Booster Pump Panel 1
Q Lift Control Panel 1 & 2 1
R Pool Control Panel 1 & 2 2 C
S Transfer Pump Panel (Provisional) 1 o
l
T Lighting Control Panel with timer control (Provisional) 1 l
Total Distribution board e
c
ELECTRICAL INSTALLATION..( Cont'd) t
SMDB - Feeder Cable i
o
XLPE/SWA/PVC/Copper cable with earth continuity n
A conductor including
4 core x 240 mm² + necessary conduits,
120 mm² ECC ,fromcable
FP-01traytoand
SMDB/GF 1
terminations, as per the schematic diagram R
B 4 core x 240 mm² + 120 mm² ECC ,from FP-01 to SMDB/FF 1
C 4 core x 240 mm² + 120 mm² ECC ,from FP-01 to SMDB/2F 1 .
O
.
D 4 core x 240 mm² + 120 mm² ECC ,from FP-01 to SMDB/3F 1
E 4 core x 240 mm² + 120 mm² ECC ,from FP-01 to SMDB/4F 1
F 4 core x 240 mm² + 120 mm² ECC ,from FP-01 to SMDB/PH 1
T
o
G 4 core x 240 mm² + 120 mm² ECC ,from FP-01 to SMDB/SF 1
DB - Feeder Cable
H 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/A 1 C
J 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/B 1 o
l
K 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/C 1
l
L 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/D 1 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
DB - Feeder Cable …(Cont'd) i
A 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/E 1 o
n
B 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/F 1
C 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/G 1 R
D 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/H 1 .
E 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/GF/I 1 O
.
F 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/A 1
G 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/B 1 T
o
H 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/C 1
J 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/D 1
K 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/E 1 C
L 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/F 1 o
l
M 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/G 1
l
M 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/1F/H 1 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
DB - Feeder Cable …(Cont'd) i
o
A 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/A 1 n
B 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/B 1
C 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/C 1 R
D 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/D 1 .
O
E 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/E 1
.
F 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/F 1
G 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/G 1 T
o
H 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/H 1
J 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/2F/I 1
K 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/A 1 C
L 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/B 1 o
l
M 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/C 1
l
N 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/D 1 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
DB - Feeder Cable …(Cont'd) i
o
A 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/F 1 n

R
.
O
.
B 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/G 1
C 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/H 1
D 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/3F/I 1
E 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/A 1
F 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/B 1
G 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/C 1 T
o
H 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/D 1
J 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/E 1
K 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/F 1 C
L 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/G 1 o
l
M 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/H 1
l
N 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/4F/I 1 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
DB - Feeder Cable …(Cont'd) i
A 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/PH/A 1 o
n
B 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/PH/B 1
C 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/PH/C 1 R
D 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/PH/D 1 .
E 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/PH/E 1 O
.
F 2 core x 35 mm² + 35 mm² ECC, from SMDB/GF to DB/PH/F 1
G 4 core X 10mm2 + 35 mm2 ECC , from SMDB/SF to MCC/GF/1 1
H 4 core X 10mm2 + 35 mm2 ECC , from SMDB/SF to MCC/RF/1 1 T
o
J 4 core X 10mm2 + 35 mm2 ECC , from SMDB/SF to POOL Control Panel-1 1
K 4 core X 10mm2 + 35 mm2 ECC , from SMDB/SF to POOL Control Panel-1 1
L 4 core X 25mm2 + 35 mm2 ECC , from SMDB/SF to MCC/G/2 1 C
M 4 core X 25mm2 + 35 mm2 ECC , from SMDB/SF to LIFT Control Panel 1 o
l
N 2 core x 35 mm² + 35 mm² ECC, from SMDB/SF to DB/SF/LL 1
l
P 2 core x 35 mm² + 35 mm² ECC, from SMDB/SF to DB/GF/LL 1 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
DB - Feeder Cable …(Cont'd) i
o
A 2 core x 35 mm² + 35 mm² ECC, from SMDB/SF to DB/1F/LL 1
n
B 2 core x 35 mm² + 35 mm² ECC, from SMDB/SF to DB/2F/LL 1
C 2 core x 35 mm² + 35 mm² ECC, from SMDB/SF to DB/3F/LL 1 R
D 2 core x 35 mm² + 35 mm² ECC, from SMDB/SF to DB/4F/LL 1 .
E 2 core x 35 mm² + 35 mm² ECC, from SMDB/SF to DB/PH/LL 1 O
.
Total for Cabling
Equipment Connection
Connect only to the equipment from nearest DP switch/cord outlet/ spur unit/
F isolator/control
Water heater panel as shown in drawings 150
G A/C VRV outdoor unit 54
H A/C VRV indoor unit 195
J Exhaust fan 159
K Ceiling fan with light 1300 mm 168
Total for Equipment Connection
C
o
l
l
e
c
ELECTRICAL INSTALLATION..( Cont'd) t
SMALL POWER INSTALLATIONS i
o
Cable and conduit to power points in concealed installations, as specified n
A 13A double pole single switched socket outlet 382
B 13A double pole twin switched socket outlet 495 R
C 13A double pole weatherproof single switched socket outlet 60 T
.
oO
D 13A double pole weatherproof double switched socket outlet 4
.
E 13A unswitched fused spur unit with neon indicator for fire alarm panel 1
F 20A DP switch with neon indicator for A/C and water heater 348 C
G 20A cord outlet for water heater 0 o
l
H 2A fused flex outlet for extract fan 0
l
J 45A Cooker outlet 52 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
SMALL POWER INSTALLATIONS …(Cont'd) i
o
Cable and conduit to power points in concealed installations…( Cont'd) n
A Fused flex outlet for gas detector sensor panel 52
B Weatherproof socket outlet for wall mounted camera 59 R
C 16A TPN weatherproof isolator 25 .
O
D 32A TPN weatherproof isolator 31 .T
E 40A TPN weatherproof isolator 1
o
F 1400mm sweep ceiling fan 168
G Ceiling fan regulator 168
H 100A TPN Isolator 1 C
J 30A SPN Isolator for sump pump 1 o
l
K 6A Fused spur unit 48
l
L Flex outlet for the AC/WH and cooker 400 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
SMALL POWER INSTALLATIONS …(Cont'd) i
o
Accessories as specified n
A 13A double pole single switched socket outlet 200
B 13A double pole twin switched socket outlet 300 R
C 13A double pole weatherproof Double switched socket outlet 20 .
13A double pole weatherproof single switched socket outlet 0 O
.
D 13A unswitched fused spur unit with neon indicator for fire alarm panel 1
E 20A DP switch with neon indicator for A/C & Water heater 240
G 20A cord outlet for water heater 16
H 2A fused flex outlet for extract fan 180
J 45A Cooker outlet
A Fused flex outlet for gas detector sensor panel
B Weatherproof socket outlet for wall mounted camera 68
C 16A TPN weatherproof isolator
D 32A TPN weatherproof isolator
T
o
E 40A TPN weatherproof isolator 10
F 1400mm sweep ceiling fan
G Ceiling fan regulator C
H 100A TPN Isolator o
l
J 30A SPN Isolator for sump pump l
Total for Small power e
c
ELECTRICAL INSTALLATION..( Cont'd) t
LIGHTING INSTALLATIONS i
o
Cable and conduit to light switching and ancillary points in n
A concealed installations, as specified
Lighting point 1390
B Lighting switch one way one gang 135 R
C One gang one way 174 .
O
D Di to WP 7 .
E Ditto - one way two gang 42
F Two gang one way 96
G Ditto - one way three gang 197
H Three gang one way 251
J Ditto - two way two gang 115
K Ditto - two way one gang 30 T
o
L Ditto - two way three gang 5
M Lighting switch one way one gang w/p 7
N 16Gang Switch Board 1 C
P Lighting Control Panel 1 o
l
Q Door Bell 52
l
R AC thermostat switch 195 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
LIGHTING INSTALLATIONS..(Cont'd) i
o
Equipment and Accessories, as specified and connected to n
A power source;
Lighting switchallone
as detailed
way one and
gangshown on drawings 174
A Lighting switch one way one gang (W/P) 4 R
B Ditto - one way two gang 42 .
O
C Ditto - one way three gang 197 .
` Ditto - Two gange one way 96
D Ditto - two way two gang 115 T
o
E Ditto - two way one gang (Provisional ) 30
F Ditto - two way three gang 0
G Lighting switch one way one gang w/p 0 C
H 16Gang Switch Board 1 o
l
J Lighting Control Panel 1
l
K Door Bell 52 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
LIGHTING INSTALLATIONS..(Cont'd) i
o
n

R
.
O
Supply and install light fittings, as specified and detailed
A shown– on
Type A1drawings, position including all fixing accessories, 114
B supports
Type - A1and
E connect to power supply all approval to the Engineer 2
C Type – A2 79
D Type – A2E 21
E Type – A3 5
F Type – A3E 3
G Type BH 53
H Type – BH1 16
J Type – BH2 31
K Type – C2 114
L Type – C3 116
M Type – C4E 39 T
o
N Type – C5 123
P Type – C5E 45
Q Type – C6 362 C
R Type – C6E 51 o
l
S Type – W1 0
l
R Type – BH3 72 e
c
ELECTRICAL INSTALLATION..( Cont'd) t
LIGHTING INSTALLATIONS..(Cont'd) i
o
T
Supply and install light fittings, as specified and detailed
shown– on on
A Type M1drawings, position including all fixing accessories, 108
…(Cont'd) R
B Type – P1 3
C Type – UL 11 .
C
O
o
D EXIT Light 12 .l
E Type – SL 10 l
Total for lighting e
c
ELECTRICAL INSTALLATION..( Cont'd) t
FIRE ALARM SYSTEM INSTALLATIONS i
o
Cable and conduit to fire alarm points in concealed installations, as specified n
A Smoke detector point 56
B Heat detector point 60 R
C Break glass unit point 15 .
D Alarm Bell point 26 O
.
Equipment and Accessories, as specified and connected to
E power
Smokesource;
detectorall as detailed and shown on drawings 56
F Heat detector 60
G Break glass unit 15
H Alarm Bell 26
J Six loop fire alarm panel as specified (1 no. for Commercial, 1 no. for Residential & all 1
four
Totaltofor
be Fire
interfaced
alarmwith repeater panel)
system
LPG Gas Detection System
K Gas Detector 52
T
o
L Emergency Push Button 52
M Gas detection System Controller 52
Sundry C
N Allow for cable pulling boxes/trunking etc. 1 o
l
P Allow for interfacing cable between fire alarm panel to AHUs/fire pump 1
l
Total for LPG Detection System e
c
ELECTRICAL INSTALLATION..( Cont'd) t
Telephone and Computer Installation i
o
A Cable and conduit to telephone outlets in concealed installation 134
n
B Patch panel 5
C Telphone Junction Box 54 R
Accessories .
D Single way telephone outlets 134 T
O
o.
E Telphone Junction Box 54
F Telephone DP 6
G 100 ´ 100 GI trunking for telephone distribution cable & ELV system 1 C
H Patch panel 5 o
l
J Telephone MDF 1 l
Total for Telephone & computer Installation e
c
ELECTRICAL INSTALLATION..( Cont'd) t
TV Installation i
o
Supply and installation of SMATV including conduiting, n
A wiring, dish,
Conduit LNB,to
and cable switches, antennas
TV points including
in concealed foundation as per schematic
installation 132
B Flush mounted TV outlet 132 R
C Cable and conduit upto junction boxes including splitter in the junction box 54 T
.
oO
D Allow for pull box 1
.
Sundries
E Concealed conduit and foundation for dish antennas 4 C
F 4 ft. dish antennas suitable for channels as per client requirement 4 o
l
G Head end equipment & switches 1 l
Total For TV Installation e
c
ELECTRICAL INSTALLATION..( Cont'd) t
CCTV System (IP/IR) i
o
A Cable and conduit in concealed installation to CCTV monitor 2 nT
B Cable & conduit in concealed installation to ceiling mounted dome camera with 59
movement o
Accessoriessensor
as specified R
C 32" CCTV monitor 2 .
O
C
D Wall mounted fixed camera with vary focal lens (W/P) 59
.o
E Digital Disk Recorder with 4TB capacity and as per specification ( 7 Nos) 7
l
F Junction box for CCTV monitor 6 l
Total for CCTV system e
c
ELECTRICAL INSTALLATION..( Cont'd) t
i
o
n

R
LIGHTNING PROTECTION SYSTEM INSTALLATIONS
Supply and install complete lightning protection system in
A accordance
25 with high
x 3mm thick drawing and Specification
conductivity annealed copper conductor fixed on roof complete with 250
B barxsaddles
25 3mm PVC coated down conductor laid in PVC duct 260
C Test clamps on down conductor 13
D Concrete test inspection pit with removable cover complete with driven rod clamp 13
E connections,
Air terminal all in accordance with the Specification 2 T
o
F 50mm diameter PVC pipe embedded in concrete 200
G 2000mm high air termination rod with base and multipoint 2
H Earth cable include conduit, fix to wall and laid in trench from earth pits to test clamp 1 C
Earthing Installation o
l
J Earthing system for complete electrical installation equipments as per specification and 13 l
drawings
Total for including
Lightningearth wires, 300
protection x 300 x 500mm
& Earthing system deep earth pits comprising 16 mm e
dia. high conductivity pure copper rod electrodes with drive head assemblies, earthing
c
clamps and 300 x 300mm medium duty ductile iron cover and frame
ELECTRICAL INSTALLATION..( Cont'd) t
Sundries i
o
A Allow for identification labels, plates, charts, colour coding and identification of 1
n
B plant,
Allowequipment, Pipework,
for expansion controls
coupler and the
expansion like for complete
sleeves/joints electrical
etc. for completeservices
electrical 1
C servicesfor excess opening in MEP raisers to be covered with 4mm thick chequred
Allow 1 R
D plate
Allowwith
for necessary supports
closing the excess opening above false ceiling by fireproof board/ seal 1 .
O
E Allow for testing & commissioning of complete installation 1
.T
F Allow for documents, “As-Built” Drawings, operation and Maintenance Manuals 1
o
G Allow for incidental works such as approval and co-ordination with other Engineering and 1
H with
AllowRAECO
for any & Omantel
other etc.practically mentioned in this BOQ, but require for
item not 1
completion of Finishes as per drawings, specification, regulations of statutory authorities.
a) …………………………………………………… C
specify items o
b) ……………………………………………………
l
c) ……………………………………………………
l
Total for Electrical Installation ( Sundries) e
c
COLLECTION t
4/52 i
o
4/53 n
4/54
4/55 R
4/56 .
O
4/57 .
4/58
4/59
4/60
4/61
4/62
4/63
4/64
4/65
4/66
T
o
4/67
4/68
4/69 C
4/70 o
l
4/71
l
4/72 e
c
SUPPLY, INSTALLATION AND COMMISSIONING OF LIFTS t
Design, supply, delivery to site install, test and commission the i
following o
A Fully fittedlift as described;
passenger lift fully equipped as particular 2
specification including but not n
Allow for supply and fixing of limited
all steeltowork
machines,
within equipment,
the lift
machine arrangement, lift shaft equipment, frames, lift cabins, T
B shaft/plantlift
Passenger room including but not limited to guide rails, 2
all doors, controls, safetytoand protective devices, indicators, oR
beams,
Allow forframing required
providing adapt
all conduits, the shaft
junction to the size
boxes, of lift
control boxes .
lighting,
provided, ventilating,
anchors, interconnecting,
brackets, bolts, wiring
etc., etc.,
including as required
protective
C between the
Passenger lift/lift shaft and motor/plant room for the installation of:-
lift 2 O
for
andadecorative
complete installation
painting to allfor:-
surfaces, for the installation of:-
D Interior of the lifts to be considered with wooden panel and mirror finish materials to the 1 .
C
approval of the Engineer/Client (Not for Service lift)
WARRANTY o
l
E Allow for the provision of full, part and labour warranty for routine and emergency 1
l
maintenance
Total for Liftservicing and repairs for 12 months and two years maintenance from the date e
of handing over of the whole project all as required and specified in the particular
c
specification
SUPPLY, INSTALLATION AND COMMISSIONING OF t
LIFTS …(Cont'd)
SUNDRIES i
o
A Allow for co-ordinating with all other engineering installations 1
n
B Allow for setting out the work and marking positions of all holes, mortices, chases and the 1
C like
Allow for necessary supports, separator beams, brackets, lifting beams, scaffolding, fixing 1 R
D and thefor
Allow like
protective and decorative painting including removing, protective coating or 1 .
E wrapping, cleaning
Allow for all or polishing
other incidental of exposed
work surfacesitems as required for complete
and/or ancillary 1 O
installation of lift installations .
F Allow for earthing and bonding all as detailed in the Specifications 1
G Allow for identification labels, plates, charts as required 1
H Allow for providing documents, As-built drawings towards Civil & M&E works 1
J excluding lift installation
Allow for providing angle mounting for weatherproof isolator switches 1
K Allow for unloading and storage facilities of the lift installation 1 T
o
L Allow for power supply for erection, testing and commissioning the lift installation 1
J Allow for any other item not practically mentioned in this BOQ, but require for
completion of Finishes as per drawings, specification, regulations of statutory authorities.
a) …………………………………………………… C
specify items o
b) ……………………………………………………
l
c) ……………………………………………………
l
e
c
COLLECTION t
4/74 i
o
4/75 n
SUPPLY, INSTALLATION AND COMMISSIONING OF
LIFTS
Carried to Summary of Bill No. 4 R
.
SWIMMING POOL EQUIPMENT O
.
Supply, Installation Testing and Commissioning of Swimming
Pool equipment with all necessary accessories, pipes, valves,
control system, , service connections, warrantees, associated
civil works etc. complete in all respect.
T
Main Pool & Kids Pool
o
Swimming pool filtration system
A Filter shall be designed to deliver a flow rate of 6.0m3/hr 2
Sand filter shall
Swimming Poolbe polyester reinforced
Filteration Pump with resin impregnated fiber glass. Oval man hole C
B on
The pump shall be manufactured by a knob
top, 400 x 300 mm. Lid with threaded and bridge
specialist made pool
swimming of polypropilene
pump and o
2
fiberglass.
manufacturer Internal filtration
and shallSystem system Standard equipped with laterals
be CE certified with European origin. Equipments of l
T
Under Water Lighting
Chinese origin are not acceptable.The pump set shall consist ol
by aof 1duty andswimming
1 Standby
C The Underwater Lighting System shall be manufactured specialist 1 e
and shall have automatic duty rotation which will be controlled via standalone PLC
pool underwater lighting equipments manufacturer with European origin. c
device. Each pump to be designed to deliver a min. flow rate of 6 m3/hr..
Chemical Treatment System t
C
A Chemical Free disinfection system shall be manufactured by with European origin. 1 oi
100% Chlorine freePump
waterfortreatment lo
Chemical Dosing Ph: with full automatic management of multi ln
B functions of pool. It allows
Holding Tank shall be manufactured you toinenjoy exceptionally clean water, kind for both
polyethene. 1
health and environment with low energy consumption and without using oxidants. It e
is integrated automated management system optimizes multi functions of the pool and cR
SWIMMING
allow you to see POOL
the actEQUIPMENT CONT..,
on the parameters of the pool water in real time and remotely t.
cloud base through
Mechanical its application on IOS device.
installation iO
o.
A Co-ordinating with Builders works, including setting out the works, marking of 1
nT
B sleeves,
Allow for marking
supplyofandpipes, markingofofnecessary
installation box outs, marking
sleeves, of levels,
pipes, checking before
containments, cutouts, 1
concreting.
during for
the Supply
plant room concreting. of necessary sleeves, E class pipes, containments, o
C Allow and installation 1 R
D cutouts,forduring
Allow Supplythe andcasting of swimming
installation pool
of necessary floor slab
sleeves, . pipes, containments,
E class 1 .
cutouts, during the casting of swimming pool wall . O
C
E Allow for supply and installation of puddle flanges in water holding areas like in 1
.o
F Swimming pool .
Allow for co-ordinating with Builders works, for compaction, backfilling with selected 1
materials l
G Allow foraround
supply the
andpool up to plant
installation roominprior
of pipes UPVC toclass
interconnecting
E and fittingspipe
highworks
pressure from 1
between pool and plant rooms. lT
H the pool
Allow fordrain,
supplyreturn
and inlet, vacuum
installation of point
pipes and overflow
in UPVC channel
class drain out
E and fittings the pressure
high overflowfrom 1 eo
water
the to the
pool drain balancing
to the planttankroom.
to the plant room.
c
SWIMMING POOL EQUIPMENT CONT.., t
Mechanical installation Cont.., iC
oo
A Hydrostatic pressure test for all pipe works. 1
nl
B Allow for Co-ordinating with Builders works, including setting out the equipments and 1
l
C making of mechanical
Allow for concrete foundations inside
installation of allthe plantequipments
plant room priorand
to civil finishing works.
interconnecting pipe works 1 R
e
with necessary accessories. .c
SWIMMING POOL EQUIPMENT CONT.., tO
Electrical Installation i.
o
A Allow for supply and installation of necessary sleeves, pipes, containments, cutouts and 1
n
B laying of LV
Allow for cables
supply andfrom plant room
installation to identification
of all each lights prior to the
labels, casting
arrow of swimming
marking, pool
valve tags 1
deck slab
identification of plant equipments, identification of cabling
C Allow for electrical installation of all plant equipments and and identification
interconnecting in control
cabling works 1 R
panels.
from control panel to each equipments via heavy duty cable trays, trunking, GI Conduits .
D Allow for supply and installation of all glands, shrouds, connectors, lugs and flexible 1
with necessary supports and accessories.
conduits. O
E Allow for providing dry run protection to all plant equipments via flow switch installed 1
.
F within the the
Allow for system.
supply and installation of earthing & bonding to all electrical equipments 1
G and containments
Allow for complying as required.
all HSE norms and regulation as per contractors requirement. 1
H Allow for conducting Pre-commissioning checks, Pre- commissioning activities, 1
J Commissioning
Allow for any otheractivities andpractically
item not preparationmentioned
of necessary testing
in this BOQ, and
butcommissioning
require for reports. 1
completion of Finishes as per drawings, specification, regulations
a)Reticulation fitings (Drain, inlet,vacuum, water level controler & End of statutory
Fitting)authorities. 1
specify items
b)Pool ladder 2
c) Control & safety Panel for main & Kids pool 1
d) Maintanance Tools & Equipments 1
C
o
l
d) Stabilisation of Swimming Pool 1
l
e
c
COLLECTION t
4/77 i
o
4/78 n
4/79
4/80 R
4/81 .
O
SWIMMING POOL EQUIPMENT .
Carried to Summary of Bill No. 4
SUMMARY
1 FOUNDATIONS INCLUDING GROUND FLOOR SLAB (PROVISIONAL)
2 CONCRETE WORK
3 MASONRY WORKS
4 METAL WORKS
5 CARPENTRY AND JOINERY
6 THERMAL AND MOISTURE PROTECTION
7 FINISHES
8 PAINTING AND DECORATIONS
9 BUILDER'S WORK IN CONNECTION WITH SERVICESE
10 PLUMBING INSTALLATION
11 AIRCONDITIONING & VENTILATION INSTALLATION
12 ELECTRICAL INSTALLATION
13 PASSENGER LIFT INSTALLATION
14 SWIMMING POOL EQUIPMENT
BILL NO 4 - MAIN CLINIC BUILDING
Carried to General Summary
BILL NO. 4 Mark Up 1.000
MAIN BUILDING
Rate Amount
Unit
R.O. BZ R.O. BZ

No. 743.200 743.200


No. 733.200 733.200
No. 733.200 733.200
No. 733.200 733.200
No. 733.200 733.200
No. 593.200 593.200
No. 658.200 658.200

No. 130.000 130.000


No. 150.000 1,350.000
No. 130.000 130.000
No. 150.000 1,350.000
No. 130.000 130.000
No. 150.000 1,350.000
No. 130.000 130.000
No. 150.000 1,350.000
No. 130.000 130.000
No. 150.000 1,350.000
No. 130.000 130.000
No. 150.000 900.000
No. 130.000 130.000
No. included
No. included
No. included
No. included
No. 372.000 372.000

Item 1,055.000 1,055.000


Item 2,416.900 2,416.900
Item 2,416.900 2,416.900
Item 2,416.900 2,416.900
Item 2,416.900 2,416.900
Item 2,416.900 2,416.900
Item 2,416.900 2,416.900

Item 64.020 64.020


Item 193.700 193.700
Item 212.750 212.750
Item 269.900 269.900

Item 231.800 231.800


Item 193.700 193.700
Item 174.650 174.650
Item 142.980 142.980
Item 155.600 155.600
Item 155.600 155.600
Item 432.950 432.950
Item 473.450 473.450
Item 416.300 416.300
Item 389.630 389.630
Item 303.430 303.430
Item 282.950 282.950
Item 237.470 237.470

Item 181.430 181.430


Item 420.950 420.950
Item 479.290 479.290
Item 420.950 420.950
Item 398.090 398.090
Item 343.560 343.560
Item 313.080 313.080
Item 239.150 239.150
Item 204.860 204.860
Item 231.530 231.530
Item 440.000 440.000
Item 455.240 455.240
Item 443.810 443.810

Item 362.610 362.610


Item 312.730 312.730
Item 258.200 258.200
Item 223.910 223.910
Item 258.200 258.200
Item 459.050 459.050
Item 516.200 516.200
Item 459.050 459.050
Item 381.660 381.660
Item 361.420 361.420
Item 277.250 277.250
Item 254.390 254.390
Item 357.610 357.610

Item 258.200 258.200


Item 478.100 478.100
Item 440.000 440.000
Item 372.850 372.850
Item 334.750 334.750
Item 239.150 239.150
Item 391.900 391.900
Item 315.700 315.700
Item 422.380 422.380
Item 338.560 338.560
Item 391.900 391.900
Item 420.950 420.950
Item 338.560 338.560
Item 201.050 201.050

Item 239.150 239.150


Item 277.250 277.250
Item 310.700 310.700
Item 329.750 329.750
Item 405.950 405.950

No. 20.488 3,073.273


No. 27.127 1,464.852
No. 20.488 3,995.255
No. 12.917 2,053.875
No. 6.048 1,015.993
No. 12.917 4,934.467
No. 14.209 7,033.553
No. 12.917 775.047
No. 14.209 56.837
No. 19.819 19.819
No. 20.488 7,129.993
No. 8.195 - .0
No. 3.875 - .0
No. 27.127 1,410.598

No. 4.501 234.027


No. 6.048 356.807
No. 20.488 512.212
No. 20.488 635.143
No. 20.488 20.488
No. 6.048 1,015.993
No. 4.501 756.087
No. 20.488 20.488
No. 20.488 20.488
No. 6.048 290.284
No. 8.195 3,278.158

No. 2.498 499.500


No. 2.235 670.500
No. 3.128 62.550
No. 3.128 - .0
No. 2.498 2.498
No. 2.498 599.400
No. 1.920 30.720
No. 2.498 449.550
No. 6.240 - .0
No. 2.498 - .0
No. 2.820 191.760
No. 4.395 - .0
No. 4.395 - .0
No. 5.445 54.450
No. 15.090 - .0
No. 7.065 - .0
No. 8.595 - .0
No. 4.395 - .0

No. 6.048 8,406.131


No. 4.501 607.570
No. 4.501 783.090
No. 4.726 33.079
No. 4.726 198.473
No. 4.501 432.050
No. 4.501 886.602
No. 4.501 1,129.630
No. 4.501 517.560
No. 4.501 135.016
No. 4.501 22.503
No. 4.501 31.504
No. 5.626 5.626
No. 6.751 6.751
No. 5.401 280.832
No. 5.401 1,053.121

No. 3.475 604.566


No. 4.501 18.002
No. 4.501 189.022
No. 4.501 886.602
No. 0.053 5.112
No. 4.501 517.560
No. 4.501 135.016
No. 4.501 - .0
No. 4.501 - .0
No. 5.626 5.626
No. 6.751 6.751
No. 5.401 280.832
No. 19.860 2,264.040
No. 41.340 82.680
No. 26.160 2,066.640
No. 47.640 1,000.440
No. 26.160 130.800
No. 47.640 142.920
No. 14.610 774.330
No. 14.610 233.760
No. 14.610 452.910
No. 14.610 1,665.540
No. 14.610 1,694.760
No. 27.690 1,079.910
No. 14.610 1,797.030
No. 27.210 1,224.450
No. 14.610 5,288.820
No. 27.690 1,412.190
No. 14.610 - .0
No. 11.460 825.120

No. 106.320 11,482.560


No. 1.440 4.320
No. 13.350 146.850
No. 18.600 223.200
No. 12.300 123.000

No. 18.167 1,017.333


No. 18.167 1,090.000
No. 20.167 302.500
No. 17.833 463.667

No. 25.045 1,402.539


No. 23.093 1,385.600
No. 29.307 439.600
No. 15.083 392.149
No. 1,868.187 1,868.187

No. 22.718 1,181.353


No. 20.580 1,070.160
No. 38.500 2,002.000

Item 112.500 112.500


Item 108.750 108.750

No. 20.981 2,811.441


Item 200.650 1,003.250
No. 5.022 271.170

No. 2.680 359.075


No. 8.701 469.872
No. 27.403 164.416
Item 1,506.500 1,506.500
Item 167.317 836.583
No. 150.650 150.650

No. 24.430 3,224.804


No. 3.351 442.288
No. 24.805 1,339.488
Item 100.433

No. 25.108 100.433


No. 31.818 127.273
Item 4,526.000 4,526.000

No. 253.897 507.793


No. 25.461 1,502.209

No. 109.514 219.027


No. 76.635 4,521.436
Item 194.330 1,360.310
No. 20.108 120.650
m 6.075 1,518.750
m 7.440 1,934.400
No. 8.325 108.225
No. 17.625 229.125
No. 49.650 99.300
m 1.035 207.000
No. 93.400 186.800
Item 906.375 906.375

No. 243.375 3,163.875

Item 280.000 280.000


Item 224.000 224.000
Item 536.000 536.000
Item 660.000 660.000
Item 1,668.000 1,668.000
Item 620.000 620.000
Item 500.000 500.000
- .0
No. 17,150.000 34,300.000

No. included

No. included
Item included

Item included

Item 430.000 430.000


Item 180.000 180.000
Item 710.000 710.000
Item 580.000 580.000
Item 320.000 320.000
Item 240.000 240.000
Item 190.000 190.000
Item 260.000 260.000
Item 31.000 31.000
Item 250.000 250.000
Item 260.000 260.000
Item 623.500 1,247.000

Item 382.250 764.500

Item 2,098.000 2,098.000

Item 3,399.000 3,399.000

Item included

Item 274.000 274.000


Item 210.000 210.000
Item 198.000 198.000
Item - .0 - .0
Item 310.000 310.000
Item 110.000 110.000
Item 234.000 234.000
Item 160.000 160.000

Item 294.000 294.000


Item 70.000 70.000
Item 304.000 304.000

Item 110.000 110.000


Item 105.000 105.000
Item 340.000 340.000
Item 83.000 83.000
Item 138.000 138.000
Item 78.000 78.000
Item 105.000 105.000
Item 111.000 111.000

Item 1,228.000 1,228.000


Item 160.000 320.000
Item 1,350.000 1,350.000
Item 425.000 425.000
Item 200.000 200.000
PROPO
SED
RESIDE
NTIAL
APPART
MENTS
INMA ON PLOT NO 2078 AT AL GHUBRAH.
BUILDI
NG
Item
FOR

A
B

B
C

D
A

D
E
F
G
H
J

B
C

A
B

E
F
G

B
C
D

E
F

A
B

C
D

F
PROPOSED RESIDENTIAL APPARTMENTS BUILDING FOR
INMA ON PLOT NO 2078 AT AL GHUBRAH.
GENERAL SUMMARY
INMA ON PLOT NO 2078 AT AL GHUBRAH.

CIVIL WORKS
Boundary wall
2200 mm high, external boundary wall constructed in 200 mm reinforced block wall including foundation, all as all
completeExtra
as specified in for
over cost Drawing and to thetoapproval
stone cladding boundry of the Engineer (ref Drawing A-910)
wall
Gates
Supply & fixing 4.5m wide Remote operate Arm gate including 60 Nos Remote units in accordance with specification
and to the approval of the Engineer (Entry only)

Supply & fixing of 4.5m wide Sensor operated Automatic Arm gate (Exit only)
Garbage Block -( Drawing ref A-GB-100 )
Construction of Garbage Block, size 4000 x 2500 x 3250, all complete as specified in Drawing and to the approval of
the Engineer

Under Ground Water Tank & Pump Room - (Drawing ref. A-PR-100, A-PR-101)
Construction of Under Ground Water Tank, size 30000 x 4500 x 2750 mm deep, including Pump Room. all complete as
specified in Drawing and to the approval of the Engineer.
Paver Tiles
60 mm thick heavy duty paving paving tile including to laid on 50 mm thick sand bed as shown on Drawing and to the
approval of the Engineer.

To Collection R.O.
CIVIL WORKS..( Cont'd)
KERBS
Hydraulically pressed pre-cast concrete kerbs with plain poured concrete footing including,
formwork, excavation,
150 x 350 mm disposal
high non- of excavated
mountable kerb material, necessary painting all as specified and
shown on
ROAD drawings - ref drawing A-100
MARKINGS
Prepare and apply thermoplastic road marking paint on asphalt concrete in accordance with "Highway Design"
100 mm wide line to parking bays
Arrows
Sundry
Allow for any other item not practically mentioned in this BOQ, but require for completion of civil works as per
drawings,
a) specification, regulations of statutory authorities. specify items
b)
c)
d)
Total for Civil work
To Collection R.O.
AIRCONDITIONING INSTALLATION
Wall Mounted Split Air-conditioners
Supply, installation, testing and commissioning of Wall mounted split air-conditioners including
fixing in position, refrigerant piping, insulation, outdoor condensing units, condensate drain,
controls, cable tray, aluminium cladding for exposed refrigerant pipes etc. all complete as per
Specifications and drawings

Indoor Unit - 2.0KW - ( Provisional)


Supply and fixing of wall mounted extract fan with integral auto shutter and flymesh as shown in the drawings
40L/S @25Pa (Provisional)
Total for AC & Ventilation (provisional)
To Collection R.O.
FIRE FIGHTING SYSTEM
Supply and install a complete fire fighting system to the approval of the civil defense
authorities andfirefighting
Underground complete with
pipeall-HDPE,
accessories
PN16andoffittings as shown
the following on drawings or specified and to
sizes:
the approval
160 of the Engineer:
mm diameter
Supply and fixing of Isolation valves at valve chambers all complete as per detailed drawings
and as
110 mmspecified
diameter(Including Civil Works for Valve chambers)
Supply and fixing of Fire Hydrant and barriers all complete as per detailed drawings and as specified
2way Fire hydrant
Total for EXT -Fire fighting system
Irrigation System
22mm dia pipe
35mm dia pipe
22mm dia isolation valve
35mm dia isolation valve
35mm dia Irrigation valve
Irrigation Controller
Total for Irrigation system
To Collection R.O.
SANITARY INSTALLATION
Soil, waste and vent pipe installation
UPVC pipes including fittings to BS 4514/1983, and BS 4660/1973 including all joints,
connections, cleaning eye, rodding eye and brackets
160 mm diameter
Manholes
600 x 600 mm deep sewage water manhole in 200mm thick RCC construction as shown in the Specification and
as
300indicated
x 300 mm in the Drawings
gully trap of including excavation,
approx. 300 mm depthrendering, epoxy grade
set in concrete paint,30
heavy
N/mmduty
2 DI covers
, joints with frame
to drain pipes and
etc.
completePipework
with 300 x 300 mm
Sewage ancillaries
medium duty ductile iron
Provision for Connection to cover and frame
Central Sewage System
Water line services and Installation including fittings as per specified and as per drawing
50 mm diameter HDPE PN16 main water supply as per specified in drawings
Total for EXT-Sanitary Installation
To Collection R.O.
Sundries
Allow for document, 'As Installed' drawings, operation & maintenance manuals for sanitary, water services
Allow for supplying Manufacturer’s recommended tools and spare parts of all items, as specified for
sanitary, water services
Allow for training employer’s operating and maintenance staff

Allow for protection of entire hot and cold water installation against any form of back siphonage in accordance with
BS 6700 1987
Allow for trial usage of all installations included in this section

Allow for providing warranties for plumbing, sanitary installations, equipment specified

Total for EXT-Sanitary Installation (Sundries)

To Collection R.O.
ELECTRICAL INSTALLATION
11KV Switchgear
Equipment and control gear, as specified, complete with volt selection switch, voltmeter,
ammeter
1600A Feeder selection switch, ammeter, indicator lamps etc., all as detailed and shown on drawing and specification
Pillar-1
Transformers complete as specified and detailed on Drawing
1000KVA Transformer
RMU
Refer. 11KV OIL TYPE RMU comprising with cable termination boxes, HV circuit breakers as detailed in specification
HT Cabling
Supply and install HT cable in trench or duct including, excavation, backfilling, bed and
4surrounds with
core x 240 mm²sand+ filling,
120 mm² draw
ECCropes, marker tape, polyethylene tiles, cable route markers
,terminations, looping,
11KV 3CX70 HT Cable etc and connection to power supply all as detailed on drawings and specifications
11KV 3CX240 HT Cable
Manholes
Electrical manhole 2.0 x 2.0 mts. & 2.0 mts. deep with 150 mm thick RCC walls and floors, 50mm PCC at bottom
with 2 nos. 1000 x 1000 mm heavy duty ductile iron cover and frame including reinforcement,
To Collection R.O.
shuttering, fibre reinforced bitumen coating with necessary CI steps and as shown in the Drawings
Main & Sub Main Installation
Cable Protection
Cable caution tape marked in Arabic and English for LV cables
Cable Ducts
UPVC supply and laying of cable duct with socket joint, laid in trench, in running length with
8100mm concrete
x 160 mm encasement all-around
diameter
2 x 50 mm diameter
Excavate trench in any materials, minimum 700 mm deep, bedding, backfilling with excavated materials and
disposal
Excavate of surplus
trench in anymaterials forminimum
materials, external 700mm
pole lights
deep, & security
bedding, room power
backfilling with supply cable including
necessary
8excavated
x 160 mm protection
materials tile etc.
diameterand disposal of surplus materials for PVC cable duct of
2 x 50 mm diameter
Total for Sub station
To Collection R.O.
Telephone and Fire Alarm Installation
Excavation in any material
Excavate cable trench minimum 600 mm deep and including bedding, backfilling with selected excavated material
and disposal of surplus material for extra low voltage cables
Draw Pits
600 x 600 x 800 mm deep internal size telephone draw pit, 100 mm thick RCC walls and floor, 50mm PCC at
bottom with 450 x 450 mm heavy duty ductile iron cover and frame including reinforcement,
Cable Ducts
shuttering
UPVC cable andduct
fibre reinforced
with bitumen
socket joints, laidcoating as in
in trench specified
running and as shown in the drawings
length
1 x 100 mm diameter
2 x 100 mm diameter
Earthing Installation
Earthing system for complete electrical installation equipments as per specification and drawings
including earth telephone
Total for EXT- wires, 300 ´ 300
& fire ´ 500mm
alarm systemdeep earth pits comprising 16mm dia. high conductivity pure
copper rod electrodes with drive head assemblies, earthing clamps and 300 ´ 300mm medium duty ductile iron cover
To Collection R.O.
and frame.
Sundries
Allow for rerouting of any existing services found during the excavation etc. to the approval of the Engineer

Allow for builders works in connection with external services including holes, chases, sleeves, ducts, brackets,
supports, cover plates etc.

Allow for incidental works such as co-ordination with other engineering installations

Allow for identification labels, charts etc.

Allow for covering excess opening in the cable duct/manhole & wall opening by fireproof foam (or) materials

Allow for any other item not practically mentioned in this BOQ, but required for successful
completion of the work (Tenderer shall provide/attach detailed break-up for the item, if quoted)

a)
b)
c)
d)
Total for EXT- telephone & fire alarm system(Sundries)
To Collection R.O.
COLLECTION
5/1
5/2
5/3
5/4
5/5
5/6
5/7
5/8
5/9
5/10
BILL NO 5 - EXTERNAL WORKS
Carried to General Summary
PROPOSED RESIDENTIAL APPARTMENTS BUILDING FOR
INMA ON PLOT NO 2078 AT AL GHUBRAH.
GENERAL SUMMARY
BILL NO. 4 Mark Up 0.825
MAIN BUILDING
Qty. Unit Rate Amount
R.O. BZ R.O. BZ

176 m - .0 - .0
800 m
2 - .0 - .0

1,726.509 1,726.509
1 No

1 No 1,057.678 1,057.678

- .0 - .0
1 No

- .0 - .0
1 No

- .0 - .0
1600 m2

120 m - .0 - .0

255 m - .0 - .0
7 No - .0 - .0
1 No. 119.582 119.582

1 No. 40.410 40.410

50 m 140.529 7,026.444

2 No. 334.828 669.656

2 No. 484.924 969.847

20 m 2.062 41.235
85 m 3.134 266.378
2 No. 30.514 61.028
5 No. 39.586 197.928
5 No. 56.080 280.398
1 No. 1,727.747 1,727.747

30 m 1.099 32.955

2 No. - .0 - .0
2 No. - .0 - .0

1 Item

50 m 2.606 130.303

1 255.657 255.657
Item
1 173.187 173.187
Item
1 Item 115.458 115.458

1 395.856 395.856
Item
1 Item 130.303 130.303

1 Item 338.127 338.127

1 No. 2,675.327 2,675.327

1 No. 4,287.615 4,287.615

1 No. 1,987.115 1,987.115

10 m 28.404 284.039
10 m 9.225 92.251
60 m 23.281 1,396.877

2 No. - .0 - .0

1 Item

15 m 3.497 52.451
80 m 0.396 31.668
100 m - .0 - .0

15 m - .0 - .0
80 m - .0 - .0

100 m - .0 - .0
4 No. - .0 - .0

60 m 0.378 22.663
100 m 0.755 75.543

1 Item

1 255.657 255.657
Item

1 107.211 107.211
Item

1 Item 194.629 194.629

Item 51.131 51.131


1

1 71.749 71.749
Item

1 - .0 - .0

Item
Item
Item
Item

R.O
Breakdown of Tools
Sl
Description Qty UF Unit Price
No.
1 Hilti Dril Machine 0.15 1 200.00

2 Ordinary Drill Machine (dewalt 16mm) 3 0.3 80.000

3 Cutting Machine - 7" & 4" - 1 each 1 0.3 80.000

4 Set of tool boxes for Elect. 1 0.2 50.000

5 Mobile Scaffold - Al 2 0.2 700.000

6 Al Ladders - 7, 4, A-type - 1 each 5 0.2 60.000

7 Pipe Bending machine 2 0 400.000

8 Cable Crimping tool, Heat Gun 1 0 300.000

9 Continuety Tester 0.1 10 5.000

10 Helmets, Goggles, Gloves 50 1 3.000

11 Safety Shoes 50 1 6.000

12 Safety Harness Belt 1 5 10.000

13 Crane - 25T, 200T crane 0.5 0 450.000

14 Leads & Socket 1 0.5 500.000

15 Winch 1 0 200.000

16 Cable Jack 0.5 2 0.000

17 Pick Up 1 0 400.000

18 Engineer's Car 1 0 400.000

19 Hi Up with driver (Own) 1 0 0.000

20 Minibus with driver 1 0 0.000

21 Safety Barriers, Cones, Warning tapes 1 0 400.000

22 Consumables 1 1 1,000.000

Total (Plant) 1 0 0.000


Amount

30.000

72.000

24.000

10.000

280.000

60.000

5.000

150.000

300.000

50.000

250.000

500.000

1,557.900
Prelims: (T165) INMA Residential Bldg at Al Ghubrah
Sl. No.of
Description UF Unit Rate
No Months
1 Divisional Head 0.05 0 2,840.00

2 Sr Engineer 1 0 800.000

3 Site Engineer 2 7 550.000

3 HVAC Supervisor 1 7 400.000

4 Testing Engineer 1 1 800.000

5 Accounts & Admin 0.6 350.000

6 Supervisor - Electrical, PL & FF 1 8 400.000

7 Foreman - Electrical, PL & FF, AC 2 6 250.000

8 QS - Junior 0.2 6 400.000

9 QA/QC 0 20 0.000

10 PRO 0.01 20 0.000

11 HSE Officer 0 20 0.000

12 Draughtsman 2 3 300.000

13 Store Keeper 0.5 10 125.000

14 DC-cum-Accountant 1 0 200.000

15 Computer 0.5 0 200.000

16 Printer 1 0 400.000

17 Container Store, Portacabin Office 1 0.5 400.000

18 Portacabin Office 1 0 0.000

19 Workers Rest Room 1 0 0.000

20 Office Furnitures 1 0 150.000

21 Engineer's acco 0 14 0.000

22 Villa for workers 1 0 0.000

23 Electricity & Water 0 14 0.000

24 Stationaries & Phones 1 1 400.000


25 Refreshments & Entertainment 1 14 20.000

26 Plant 1 1 0.000

27 As built Dwgs 1 1 100.000

Total - RO

Project Duration: 13Months

Erection: 11 Months
Total Amount

7,700.000

2,800.000

800.000

3,200.000

3,000.000

480.000

1,800.000

625.000

200.000

400.000
280.000

100.000

21,385.000
POINT W

RESIDENTIAL/ BUILD
SI.NO DESCRIPTION
QTY UNIT RATE (RO)

1 Light Point Wiring


20mm PVC Conduit 9 m 0.093
2.5mm2 single core wire 30 m 0.092
Ceiling rose 1 No 0.400
Junction BOX 1 No 0.150
Insulation tape 0.5 Roll 0.090
Wire connector 0.3 No 0.200
Screw 5 Nos 0.018
Fisher Plug 3 Nos 0.004
Ferrule 3 Nos 0.020
Additional Screw 2 Nos 0.018
Chasing and chipping 1 LS
Total
2 Switch Point
20mm PVC Conduit 8 m 0.093
2.5mm2 single core wire 20 m 0.092
Junction BOX 1 No 0.150
Back Box 1 No 0.090
Adaptor 3 No 0.067
Insulation tape 0.5 Roll 0.090
Chasing and chipping 1 LS
Total
3 Socket Outlet
25mm PVC Conduit 15 m 0.127
4mm2 single core wire 54 m 0.130
Back Box 1 No 0.090
Adaptor 3 No 0.067
Insulation tape 0.5 Roll 0.090
Chasing and chipping 1 LS
Total
4 Isolator ( For AC Unit ) SPN
25mm PVC Conduit 30 m 0.127
Copex conduit 3 m 0.074
6mm2 single core wire 60 m 0.196
Back Box 2 No 0.090
Adaptor 3 No 0.067
Insulation tape 0.5 Roll 0.090
Lugs 2 Nos 0.020
Chasing and chipping 1 LS
Total
5 Isolator ( For AC Unit ) TPN
25mm PVC Conduit 30 m 0.127
Copex conduit 4 m 0.074
6mm2 single core wire 90 m 0.196
Back Box 2 No 0.090
Adaptor 2 No 0.067
Insulation tape 0.5 Roll 0.090
Lugs 2 Nos 0.020
Chasing and chipping 1 LS
Total
6 Fire Alarm
25mm PVC Conduit 12 m 0.127
2cx2.5mm2 fire rated cable 20 m 0.720
Junction BOX 1 No 0.150
Insulation tape 0.5 No 0.090
Chasing and chipping 1 LS
Total
POINT WIRING BREAKDOWN

RESIDENTIAL/ BUILDING COMMERCIAL BUILDING


T.LABOUR
AMOUNT (RO) LABOUR HOUR QTY UNIT RATE (RO)
HOUR

0.840 0.044 0.400 18 m 0.093


2.772 0.013 0.400 45 m 0.092
0.400 0.010 0.010 1 No 0.400
0.150 0.010 0.010 2 Nos 0.150
0.045 0.010 0.005 0.5 Roll 0.090
0.060 0.010 0.003 1 Stril 0.200
0.090 0.010 0.050 5 Nos 0.018
0.012 0.010 0.030 3 Nos 0.004
0.060 0.005 0.015 3 Nos 0.020
0.036 0.005 0.010 2 Nos 0.018
- .0 0.400 0.200 1 LS
4.465 1.133

0.747 0.050 0.400 15 m 0.093


1.848 0.020 0.400 35 m 0.092
0.150 0.010 0.010 1 No 0.150
0.090 0.010 0.010 1 No 0.090
0.201 0.010 0.030 3 No 0.067
0.045 0.010 0.005 0.5 Roll 0.090
- .0 0.400 0.200 1 LS
3.080 1.055

1.900 0.027 0.400 18 m 0.127


7.043 0.037 2.000 60 m 0.130
0.090 0.010 0.010 1 No 0.090
0.201 0.010 0.030 3 No 0.067
0.045 0.010 0.005 0.5 Roll 0.090
- .0 0.400 0.200 1 LS
9.279 2.645

3.800 0.013 0.400 35 m 0.127


0.222 0.067 0.200 3 m 0.074
11.739 0.033 2.000 70 m 0.196
0.180 0.010 0.020 2 No 0.090
0.201 0.010 0.030 3 No 0.067
0.045 0.010 0.005 0.5 Roll 0.090
0.040 0.010 0.020 2 Nos 0.020
- .0 0.400 0.200 1 LS
16.227 2.875

3.800 0.013 0.400 35 m 0.127


0.296 0.050 0.200 4 m 0.074
17.609 0.027 2.400 105 m 0.196
0.180 0.010 0.020 2 No 0.090
0.134 0.010 0.020 3 No 0.067
0.045 0.010 0.005 0.5 Roll 0.090
0.040 0.010 0.020 2 Nos 0.020
- .0 0.400 0.200 1 LS
22.104 3.265

1.520 0.083 1.000 18 m 0.127


14.400 0.050 1.000 25 m 0.720
0.150 0.010 0.010 1 No 0.150
0.045 0.010 0.005 0.5 No 0.090
- .0 0.400 0.400 1 LS
16.115 2.415
COMMERCIAL BUILDING
T.LABOUR
AMOUNT (RO) LABOUR HOUR
HOUR

1.680 0.020 0.360


4.158 0.013 0.600
0.400 0.010 0.010
0.300 0.010 0.020
0.045 0.010 0.005
0.200 0.010 0.010
0.090 0.010 0.050
0.012 0.010 0.030
0.060 0.005 0.015
0.036 0.005 0.010
- .0 0.400 0.400
6.981 1.510

1.400 - .0
3.234 - .0
0.150 0.010 0.010
0.090 0.010 0.010
0.201 0.010 0.030
0.045 0.010 0.005
- .0 0.400 0.400
5.120 0.455

2.280 0.022 0.400


7.826 0.033 2.000
0.090 0.010 0.010
0.201 0.010 0.030
0.045 0.010 0.005
- .0 0.400
10.442 2.445

4.433 0.011 0.400


0.222 0.067 0.200
13.696 0.029 2.000
0.180 0.010 0.020
0.201 0.010 0.030
0.045 0.010 0.005
0.040 0.010 0.020
- .0 0.400 0.400
18.817 3.075

4.433 0.011 0.400


0.296 0.050 0.200
20.543 0.023 2.400
0.180 0.010 0.020
0.201 0.010 0.030
0.045 0.010 0.005
0.040 0.010 0.020
- .0 0.400 0.400
25.739 3.475

2.280 0.056 1.000


18.000 0.040 1.000
0.150 0.010 0.010
0.045 0.010 0.005
- .0 0.400 0.400
20.475 2.415
Labour hour will be carried to Bill and multiplies by labour rate
considered for the particular project
ESTIMATION SHEET
Sl. Qty MATERIAL
ITEMS
No. U. Rate Total
Materials
11 KV 3cx50-120 Sqmm ID termination 1 No 46.000 46.000
Cable lugs 3 No 1.000 3.000
Cable gland 1 No 3.000 3.000
Total (Materials) 52.000
Sl. Qty MATERIAL
ITEMS
No. U. Rate Total
Materials
11KV 3cx185-300Sqmm ID termination 1 No 46.000 46.000
Cable lugs 3 No 1.200 3.600
Cable gland 1 No 3.000 3.000
Total (Materials) 52.600
Sl. Qty MATERIAL
ITEMS
No. U. Rate Total
Materials
11KV 3cx185-300Sqmm St joint with ferrules 1 No 70.000 70.000
Total (Materials) 70.000
HEET
LABOUR M+L Selling Remarks
U. Rate Total Cost Price

35.000 35.000
0.000 -
0.000 -
35.000 - -
LABOUR M+L Selling Remarks
U. Rate Total Cost Price

45.000 45.000
0.000 -
0.000 -
45.000 - -
LABOUR M+L Selling Remarks
U. Rate Total Cost Price

75.000 75.000
75.000 - -
ESTIMATION SHEET
Project : MOD/2013/297 - ELECTRICAL CONNECTIONS FOR SHAROOQ PROJECT - SAF SIGNAL RAO MAM
Qtn. / Job No: Q 317
Sl. Qty MATERIAL
ITEMS
No. U. Rate
Materials

1 Laying of 11kv 3cx240Sqmm cable 1500 M 32.500


2 caution tape 1500 M 0.026
3 Cable tiles 1500 M 0.700
4 Sand Supply & bedding 1500 M 1.220
6 200mm dia HDPE Pipe duct 1500 M 2.100
7 Cable route markers 15 No 14.000
Total (Materials)

4
6
7
10
14
18
22
30
30
30
60
60
60
560
1100
590
276
71
ESTIMATION SHEET
IGNAL RAO MAM

MATERIAL LABOUR M+L Selling


Total U. Rate Total Cost Price

48,750.000 0.614 921.600 49,671.600


38.700 0.001 1.500 40.200
1,050.000 0.050 75.000 1,125.000
1,830.000 0.200 300.000 2,130.000
3,150.000 0.250 375.000 3,525.000
210.000 - 210.000
55,028.700 1,673.100 56,701.800
36.686 1.115 37.801

28 112
9 54
13.2 92.4
9 90
9 126
9 162
9 198
9 270
9 270
9 270
28 1680
28 1680
28 1680
32 17920
7 7700
4 2360
5 1380
3 213
36257.4
Remarks

total q Drum lth No of Drums


380 500 0.76 192 307.2 0.614
PROPOSED RESIDENTIAL APPARTMENTS BUILDING FOR

INMA ON PLOT NO 2078 AT AL GHUBRAH.

GENERAL SUMMARY

Bill No.

1 PRELIMINARIES

2 DAYWORKS

3 PROVISIONAL SUMS

4 MAIN BUILDING

5 EXTERNAL WORKS

TOTAL CARRIED TO FORM OF TENDER


GS/1
1280.12.2017 - MAJAN ENGINEERING (QS)
GENERAL SUMMARY

R.O. Bz.

Page No.

1/34

2/6

3/1

4/83

5/11

R.O.

Das könnte Ihnen auch gefallen