Sie sind auf Seite 1von 29

CONTENIDO

ESTUDIO TOPOGRAFICO Y TRAZO ................................................................................................. 2


1.0 GENERALIDADES ........................................................................................................................ 2
2.0 METODOLOGIA EMPLEADA .................................................................................................. 2
2.1 INFORMACIÓN RECOPILADA ......................................................................................................... 2
2.2 TRABAJO DE CAMPO ...................................................................................................................... 4
a) Reconocimiento del terreno y ubicación de vértices ......................................................................... 4
b) Equipos Topográficos ........................................................................................................................ 4
c) Planimetría ........................................................................................................................................ 5
d) Levantamiento de Detalles ................................................................................................................ 5
2.3 TRABAJO DE GABINETE ................................................................................................................. 7
a) Dibujo del plano topográfico .............................................................................................................. 7
b) Perfil Longitudinal y Secciones Transversales .................................................................................. 8
2.4 TRAZO Y TOPOGRAFIA .................................................................................................................. 8
2.5 CONTROL HORIZONTAL GEODÉSICO .......................................................................................... 9
PANEL FOTOGRAFICO ................................................................................................................................... 28
PLANOS ........................................................................................................................................................... 29
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

ESTUDIO TOPOGRAFICO Y TRAZO

1.0 GENERALIDADES

En el presente estudio se describe las actividades que se desarrollaron para obtener el levantamiento
topográfico para el camino vecinal sector ccala ccala - jarpaña - millo ccochapata - llanca - quillisani
del distrito de paratia.

Se han desarrollado los trabajos topográficos y de cartografía de la zona destinada el camino vecinal
sector ccala ccala - jarpaña - millo ccochapata - llanca - quillisani del distrito de paratia..

La zona de trabajo antes descrita ocupa una longitud de aproximadamente 31+502.00 km. con un
ancho de 3.70m constituyendo una faja de terreno en el tramo accidentada y llano con pendientes en
la zona de ocupación de la carretera.

Los trabajos de topografía han incluido el levantamiento de zonas quebradas mayores y menores, de
emplazamientos de estructuras, de sectores críticos, de canteras, de depósitos de material excedente
(DME), de accesos a intersecciones y de terrenos y viviendas afectadas.

2.0 METODOLOGIA EMPLEADA

En cuanto a la metodología empleada para el mencionado estudio, éstos se han desarrollado como se
muestra a continuación.

2.1 INFORMACIÓN RECOPILADA

Para la elaboración de los trabajos de topografía, se usó como información de referencia. La


información recopilada fue la siguiente:

 Carta Nacional (Hoja 28 - v Carabaya que corresponde a la zona de trabajo) del Instituto
Geográfico Nacional, a escala 1/100,000
 Imagen Satelital (Google Earth).
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

2.2 TRABAJO DE CAMPO

Los trabajos de campo para la planimetría y la altimetría se dieron en tres fases: Reconocimiento
del terreno, red de poligonal de apoyo y nivelación geométrica de los BM.

a) Reconocimiento del terreno y ubicación de vértices

Con la finalidad de efectuar el levantamiento topográfico al detalle se ha efectuado un


reconocimiento total del terreno, materia del estudio en el camino vecinal sector ccala ccala -
jarpaña - millo ccochapata - llanca - quillisani del distrito de paratia,. 0+000 – 31+502.00. En el
extremo norte, habiendo ubicado los vértices (puntos de control) de una Red de Polígonos.

b) Equipos Topográficos

Los instrumentos utilizados para realizar el levantamiento topográfico y trazo fueron:

 01 Estación total Topcon OS - 105


 03 prismas
 01 Nivel Kern
 02 Miras
 01 GPS Garmin modelo OREGON 650
 01 Eclímetro
 03 Winchas de 30 m.
 01 Wincha de 3 m.
 01 Brújula.

Herramientas manuales utilizadas.

 01 Cordel.
 01 Comba.
 01 plomada.
 Pico
 Badilejo
 Baldes
 Pinceles, etc.
 Materiales
 Cemento
 Hormigón
 Clavos
 Plástico
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

 Pintura, etc.

c) Planimetría

Para la mejor configuración de la red de apoyo planimétrico en función de los alcances del trabajo
zonificado para el trazado de los ejes en el camino vecinal sector ccala ccala - jarpaña - millo
ccochapata - llanca - quillisani del distrito de paratia, km. 0+000 – 31+502.00.. Se construyó una
red de poligonales.

Los trabajos desarrollados incluyen el levantamiento de la franja de la vía proyectada, a partir del
cual se ha procedido a desarrollar el trazo de la carretera, el levantamiento topográfico de la franja
de la vía, la nivelación de BM's y del eje de la carretera, y los levantamientos topográficos
complementarios.

Para desarrollar los trabajos de campo, se ha contado con dos brigadas de topografía, cada
brigada ha utilizado equipos de topografía de última generación, tanto estaciones totales como
niveles. En el caso de las estaciones la información almacenada ha sido volcada a PC's para su
procesamiento haciendo uso de software especializado.

El Control Horizontal en tramos de 0.5 Km. aproximadamente, se ha hecho mediante pares de


puntos georeferenciados por medio del Sistema GPS, mediante el método Estático, al inicio y final
de cada tramo de la poligonal, lo que permitirá hacer el cálculo de error y cierre de esta. En el
anexo se encuentran todas las lecturas GPS con sus respectivos cálculos y tarjetas de
identificación.

Para los trabajos de levantamiento de la franja de la vía, así como para el replanteo del eje, se ha
hecho uso de una Poligonal Básica de Apoyo. De acuerdo a las condiciones de terreno se
generaron Poligonales, con el fin de realizar los levantamientos topográficos en zonas donde no
alcanza la visibilidad desde los vértices de la Poligonal de Apoyo. Los trabajos del levantamiento
de la franja de la carretera, han incluido el levantamiento de todas aquellas estructuras existentes.

El cálculo de cotas de los BM’s ha sido determinado a partir de nivelaciones cerradas entre BM’s
los mismos que han sido monumentados cada 500 metros, a partir de las cotas de los BMs. Se
ha procedido a determinar las cotas de los hitos de la poligonal de apoyo, y a partir de estos las
cotas de las estacas replanteadas, que han permitido obtener el perfil longitudinal de la carretera.

d) Levantamiento de Detalles

El levantamiento de detalles se ha desarrollado en dos fases: en una primera fase se han tomado
detalles desde los vértices de las poligonales con la estación total y en una segunda fase se han
tomado detalles haciendo mediciones con cinta métrica.
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

A fin de contar con información básica para el desarrollo de la ingeniería de detalle, se procedieron
a desarrollar los siguientes trabajos de levantamientos topográficos complementarios:

 Levantamiento de Quebradas Mayores y Menores.


 Levantamiento de emplazamientos de estructuras
 Levantamiento de Sectores Críticos
 Levantamiento de Canteras
 Levantamiento de Depósitos de Material Excedente (DME)
 Levantamiento de Accesos e Intersecciones
 Levantamiento de Terrenos y Viviendas Afectadas

e) Monumentación de los puntos del terreno

Antes de iniciar las mediciones angulares y de distancias, se han monumentado los BM referenciales
plantados en el terreno, empotrando varillas de acero corrugado ϕ=1/2” x 0.50m. Y BMs. con concreto
f’c= 140 kg/cm2 de 0.20x0.20x0.45 Con Registro Roscado de Ø 2”.

f) Error de cierre de la poligonal:

Donde:

EC = Error de cierre de la poligonal en metros.

ex = Error de cierre en x.
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

ey = Error de cierre en y.

Como las Mediciones se realizaron con estación total de buena precisión la compensación de
coordenadas se realizó con la estación total.

g) Topografía

Se realizó el levantamiento topográfico de las zonas adyacentes al área de interés utilizando una
estación total, levantando taquimétricamente por el método mixto (ángulo y distancia), todas las
infraestructuras existentes como son aulas, postes de luz, caja porta medidor de agua, etc. Todas
estas referenciadas a los vértices de la poligonal de apoyo.

2.3 TRABAJO DE GABINETE

Al obtener la información de campo se continuó con los trabajos correspondientes al procesamiento


de datos. Para ello, se procede a extraer de los archivos descargados de la estación total con el fin de
realizar el cálculo y ajuste de los mismos en otro programa.

Para la elaboración del plano se generó una nube de puntos, que es la posición verdadera que tienen
todos y cada uno de los puntos tomados en campo, a partir del archivo de texto obtenido en el
procesamiento de coordenadas. Estos datos se clasifican de acuerdo a la descripción de los puntos
en un procesador de texto o una hoja de cálculo y se cargan en un programa de dibujo, en este caso
CIVIL3D.

Este procedimiento se realiza hasta unir de forma consistente todos los puntos.

Los planos se realizaron a la escala 1:1, para la observación precisa y sin distorsión de los detalles
levantados. La información se guarda en medio magnético, lista para ser impresa a color y con las
dimensiones adecuadas. El resultado es los planos pre definitivos, los cuales pasan a un control interno
para su verificación. Una vez hecho el control de calidad se generan los planos definitivos para la
presentación definitiva de la información.

a) Dibujo del plano topográfico

Con los datos bajados de la estación total en N, E, Z, se ha procedido al dibujo del plano
topográfico utilizando el software AutoCAD Civil 3D 2013, con un número total de 30 capas con la
finalidad de dibujar la poligonal, los detalles, la triangulación, curvas de nivel a cada 2.00m para
curvas menores y 1.00m para curvas mayores, perfil longitudinal, secciones transversales, etc.
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Se ha efectuado una revisión y una consistensación del resultado del dibujo con los datos del
terreno, mediante mediciones con la cinta métrica en el campo.

b) Perfil Longitudinal y Secciones Transversales

Utilizando el plano topográfico revisado y ubicando el eje central del proyecto paralela a 45m del
margen de la pista auxiliar, se ha obtenido el perfil longitudinal del terreno, con estacado a cada
20m y a cada 10m en el tramo desde el inicio hasta el término del mismo. Así mismo se han
obtenido las secciones transversales del terreno.

Las progresivas colocadas sólo son referenciales con fines de presentar el perfil longitudinal y
secciones transversales habiéndose iniciado en la progresiva 0+000 cuya ubicación queda a la
altura de la referida progresiva.

2.4 TRAZO Y TOPOGRAFIA

En cuanto a los trabajos de trazo, éstos se han desarrollado en base a una combinación de los métodos
Directo e Indirecto, debido a las variaciones que presentan las características topográficas, el tipo de
vegetación y la visibilidad a lo largo de la carretera. El método indirecto ha sido empleado, en lugares
por donde se desarrolla la vía muy accidentada y muy sinuoso, así como en los sectores de neblina la
cual limita notablemente la colocación de PI's.

En resumen, el método indirecto para los trabajos de trazo y topografía desarrollados en el presente
trabajo, comprende los pasos siguientes:

 Colocación de una Poligonal Básica de Apoyo a lo largo del tramo, con una descripción de (PCG-
1) en cada hito monumentado.
 Levantamiento de detalle de los bordes de la plataforma actual del tramo con el apoyo de la
Poligonal Básica, para el diseño del eje de trazo.
 Colocación y monumentación de Pl's y de las referencias.
 Replanteo (estacado) del eje aprobado y nivelación del mismo.
 Seccionamiento del estacado en forma directa con la estación total y nivel.
 Levantamiento Topográfico al detalle de la franja de la vía (relleno topográfico).

Los trabajos de levantamiento topográfico de la franja se hacen a partir de la poligonal de apoyo. Para
los trabajos de levantamiento topográficos complementarios, se hace uso de la poligonal de apoyo y
en algunos casos de poligonales auxiliares, estos trabajos de levantamiento complementarios
comprenden: quebradas, canteras, DME's, etc.

Toda la información de campo desarrollada durante los trabajos, se encuentra debidamente registrada
en libretas de campo y archivos electrónicos.
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

2.5 CONTROL HORIZONTAL GEODÉSICO

Para el control Horizontal, se utilizó el método Diferencial o Estático con GPS, la cual consiste en
colocar un equipo GPS Master (BASE), en el Punto Geodésico con coordenadas conocidas,
perteneciente al Instituto Geográfico Nacional del Perú (lGN)

Para la conformación de la Poligonal de Apoyo, en cada zona de levantamiento, se han colocado 02


(dos) hitos dentro del área de influencia del trabajo en intervalos de cada 0.5 Km. aproximadamente,
de tal manera que estos sean visibles entre los dos.
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

BM: N°05
cantera 01

cantera 03
C.P.:FIN
KM:31+502..00
N: 8299317.9630
E: 311432.7510

BM: N°04
C.P.:LANCA
KM:24+400.00
N: 8293289.0893
E: 311508.0308

BM: N°03
C.P.:MILLOCOCHAPATA
KM:17+000.00
N: 8287896.3069
E: 308876.8050

BM: N°02
cantera 4

C.P.:JARPAÑA
KM:11+760.00
N:8283141.9964
E: 308685.6809

BM: N°01
C.P.:INICIO
KM:0+000.00
N: 8276596.6140
E: 316003.7510

IMAGEN N° 01: Planta del terreno del camino vecinal.


PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

CUADRO RESUMEN DE COORDENADAS

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

1 8293533.86 311526.335 4480.982 NA 34 8291884.89 310763.886 4452.87 NA


2 8293489.46 311528.58 4480.072 NA 35 8291885.11 310769.4 4452.416 NA
3 8293442.06 311529.796 4479.053 NA 36 8291884.15 310790.281 4450.564 NA
4 8293400.6 311529.911 4479.727 NA 37 8291886.91 310791.301 4450.7 NA
5 8293340.95 311531.479 4480.599 NA 38 8291935.71 310798.932 4454.292 NA
6 8293243.27 311489.294 4480.598 NA 39 8291955.14 310814.073 4455.452 NA
7 8293206.31 311451.574 4478.397 NA 40 8291945.16 310826.628 4454.194 NA
8 8293151.44 311380.719 4473.026 NA 41 8291916.49 310843.459 4451.316 NA
9 8293112.82 311285.267 4473.155 NA 42 8291914.61 310844.65 4451.129 NA
10 8293119.93 311200.814 4479.252 NA 43 8291899.66 310855.778 4449.613 NA
11 8293136.99 311172.197 4482.938 NA 44 8291874.16 310856.434 4447.567 NA
12 8293157.12 311157.613 4485.504 NA 45 8291828.62 310857.789 4445.948 NA
13 8293181.92 311123.233 4492.104 NA 46 8291810.4 310829.487 4446.747 NA
14 8293188.12 311099.244 4496.321 NA 47 8291771.1 310826.241 4446.516 NA
15 8293155.22 311113.728 4492.788 NA 48 8291729.92 310833.175 4445.535 NA
16 8293151.11 311114.634 4492.321 NA 49 8291688.3 310827.973 4445.282 NA
17 8293094.06 311136.409 4483.565 NA 50 8291652.87 310832.759 4443.18 NA
18 8293076.78 311136.065 4482.408 NA 51 8291641.08 310834.6 4442.328 NA
19 8293054.11 311116.858 4484.318 NA 52 8291638.78 310833.029 4442.266 NA
20 8292934.44 311066.795 4481.993 NA 53 8291630.5 310828.593 4441.96 NA
21 8292828.69 311057.908 4477.461 NA 54 8291621.1 310819.418 4441.774 NA
22 8292695.52 311014.996 4471.169 NA 55 8291573.17 310826.209 4438.416 NA
23 8292531.6 310969.351 4471.004 NA 56 8291543.38 310822.917 4436.812 NA
24 8292406.97 310964.546 4473.58 NA 57 8291535.62 310815.294 4436.487 NA
25 8292214.53 310929.855 4475.556 NA 58 8291517.71 310819.297 4435.376 NA
26 8292132.91 310933.733 4464.428 NA 59 8291476.34 310780.164 4436.267 NA
27 8292084.72 310896.229 4463.868 NA 60 8291446.47 310750.201 4439.088 NA
28 8292084.93 310854.428 4466.834 NA 61 8291398.5 310696.297 4447.205 NA
29 8292083.03 310831.486 4468.059 NA 62 8291312.84 310691.662 4445.4 NA
30 8292030.65 310802.697 4463.865 NA 63 8291179.06 310676.322 4446.635 NA
31 8291990.48 310785.858 4459.881 NA 64 8291115.52 310724.614 4436.417 NA
32 8291939.37 310761.011 4456.326 NA 65 8291001.03 310751.098 4433.603 NA
33 8291920.57 310760.177 4455.263 NA 66 8290909.93 310732.188 4431.667 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

67 8290782.64 310664.226 4436.366 NA 102 8288876.24 309432.715 4432.98 NA


68 8290689.03 310694.062 4428.678 NA 103 8288843.05 309405.427 4436.664 NA
69 8290492.61 310731.497 4425.879 NA 104 8288806.35 309391.546 4436.456 NA
70 8290391.88 310715.64 4426.116 NA 105 8288763.53 309424.143 4428.059 NA
71 8290259.16 310692.749 4436.39 NA 106 8288709.9 309416.354 4426.447 NA
72 8290077.88 310715.876 4427.423 NA 107 8288663.59 309388.963 4425.213 NA
73 8290046.84 310673.252 4430.141 NA 108 8288597.62 309346.374 4420.945 NA
74 8289939.16 310626.479 4427.855 NA 109 8288531.98 309285.47 4411.562 NA
75 8289818.26 310549.048 4423.581 NA 110 8288501.93 309231.374 4405.548 NA
76 8289717.33 310519.858 4421.884 NA 111 8288508.22 309178.35 4408.179 NA
77 8289641.45 310410.199 4422.922 NA 112 8288501.07 309143.175 4407.505 NA
78 8289584.97 310361.485 4421.704 NA 113 8288500.73 309121.818 4407.924 NA
79 8289551 310318.134 4426.307 NA 114 8288493.34 309089.912 4405.915 NA
80 8289506.84 310296.831 4424.152 NA 115 8288496.32 309070.407 4406.677 NA
81 8289389.3 310189.415 4423.554 NA 116 8288504.06 309034.953 4408.833 NA
82 8289349.42 310082.374 4426.659 NA 117 8288498.75 309014.373 4410.659 NA
83 8289274.94 309980.292 4426.447 NA 118 8288476.05 309061.513 4401.769 NA
84 8289236.09 309943.549 4427.042 NA 119 8288459.32 309092.218 4397.051 NA
85 8289176.74 309896.199 4421.75 NA 120 8288462.89 309100.888 4397.807 NA
86 8289172.34 309853.141 4425.361 NA 121 8288452.31 309077.711 4395.607 NA
87 8289141.23 309801.497 4424.082 NA 122 8288457.69 309050.798 4397.573 NA
88 8289133.85 309755.285 4425.166 NA 123 8288458.99 309033.47 4398.917 NA
89 8289136.55 309723.658 4428.173 NA 124 8288466.5 309011.712 4404.053 NA
90 8289120.98 309712.116 4426.399 NA 125 8288475.3 308992.372 4408.963 NA
91 8289117.98 309679.603 4428.201 NA 126 8288443.31 308976.712 4404.865 NA
92 8289113.77 309657.437 4429.017 NA 127 8288405.91 308972.093 4400.271 NA
93 8289116.47 309623.097 4438.427 NA 128 8288347.26 308958.136 4395.077 NA
94 8289084.84 309601.364 4434.671 NA 129 8288308.32 308942.869 4395.568 NA
95 8289065.85 309609.741 4430.542 NA 130 8288270.26 308942.977 4392.976 NA
96 8289054.57 309585.399 4433.436 NA 131 8288163.76 308977.781 4386.362 NA
97 8289019.05 309574.161 4429.127 NA 132 8288100.64 308988.542 4381.48 NA
98 8289003.31 309561.998 4428.265 NA 133 8288048.11 308965.788 4381.237 NA
99 8288974.5 309554.054 4425.344 NA 134 8287951.33 308918.49 4381.921 NA
100 8288952.52 309512.333 4428.011 NA 135 8287910.37 308881.505 4383.508 NA
101 8288916.07 309452.75 4432.856 NA 136 8287869.03 308845.922 4387.781 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

137 8287836.69 308853.495 4386.1 NA 172 8286409.47 309273.446 4369.515 NA


138 8287827.43 308872.659 4382.847 NA 173 8286371.74 309293.488 4369.33 NA
139 8287801.96 308893.465 4379.64 NA 174 8286340.47 309330.592 4365.914 NA
140 8287756.82 308890.863 4379.368 NA 175 8286329.06 309348.362 4365.857 NA
141 8287678.59 308887.548 4378.175 NA 176 8286299.01 309360.578 4365.036 NA
142 8287611.25 308901.162 4374.294 NA 177 8286262.07 309375.715 4362.71 NA
143 8287536.23 308900.124 4374.046 NA 178 8286256.34 309375.833 4362.567 NA
144 8287468.16 308926.708 4374.49 NA 179 8286213.6 309376.654 4361.437 NA
145 8287407.63 308956.844 4372.252 NA 180 8286176.8 309375.936 4360.57 NA
146 8287390.95 308994.613 4370.712 NA 181 8286175.2 309363.082 4362.356 NA
147 8287341.21 309008.78 4370.456 NA 182 8286167.92 309346.096 4364.421 NA
148 8287295.04 309041.186 4368.734 NA 183 8286144.01 309340.935 4363.867 NA
149 8287271.91 309066.12 4367.835 NA 184 8286141.22 309340.994 4363.712 NA
150 8287205.59 309107.93 4368.401 NA 185 8286134.25 309342.562 4363.166 NA
151 8287155.5 309134.196 4368.981 NA 186 8286114.74 309342.97 4362.554 NA
152 8287108.07 309162.912 4371.293 NA 187 8286088.13 309319.467 4364.088 NA
153 8287081.25 309171.358 4372.61 NA 188 8286082.65 309325.245 4362.954 NA
154 8287000.42 309184.792 4375.341 NA 189 8286081.27 309325.276 4362.891 NA
155 8287040.69 309192.057 4371.651 NA 190 8286042.82 309343.204 4360.488 NA
156 8286945.62 309208.205 4372.142 NA 191 8286008.54 309346.636 4359.35 NA
157 8286908.23 309254.296 4367.172 NA 192 8285956.12 309358.804 4357.495 NA
158 8286863.44 309260.208 4367.84 NA 193 8285912.38 309375.403 4355.359 NA
159 8286817.99 309255.601 4367.096 NA 194 8285881.5 309391.082 4353.947 NA
160 8286800.17 309230.065 4367.929 NA 195 8285864.96 309418.343 4353.253 NA
161 8286766.85 309226.692 4368.798 NA 196 8285782.27 309394.474 4352.019 NA
162 8286704.1 309238.761 4369.649 NA 197 8285718.94 309382.804 4353.597 NA
163 8286656.97 309242.272 4369.356 NA 198 8285715.59 309379.998 4353.827 NA
164 8286620.59 309244.971 4368.344 NA 199 8285674.69 309352.681 4356.622 NA
165 8286590.3 309219.279 4372.043 NA 200 8285669.96 309352.982 4356.633 NA
166 8286546.38 309217.871 4373.055 NA 201 8285643.36 309354.673 4355.893 NA
167 8286479.38 309231.897 4371.402 NA 202 8285615.33 309346.242 4355.747 NA
168 8286438.07 309245.026 4372.919 NA 203 8285607.69 309346.748 4355.538 NA
169 8286429.5 309252.511 4372.348 NA 204 8285599.69 309342.968 4355.598 NA
170 8286428.15 309255.426 4371.964 NA 205 8285589.66 309336.537 4355.796 NA
171 8286410.9 309270.474 4370.039 NA 206 8285539.59 309343.021 4356.309 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

207 8285469.28 309341.88 4357.731 NA 242 8283612.28 308734.579 4353.375 NA


208 8285407.4 309368.012 4354.479 NA 243 8283585.84 308724.143 4352.02 NA
209 8285342.34 309330.932 4356.048 NA 244 8283560.57 308697.26 4352.446 NA
210 8285295.23 309285.729 4363.336 NA 245 8283466.26 308646.219 4344.278 NA
211 8285247.13 309282.302 4359.886 NA 246 8283471.3 308645.067 4344.931 NA
212 8285237.57 309276.761 4359.843 NA 247 8283447.58 308635.511 4342.764 NA
213 8285213.57 309233.724 4363.725 NA 248 8283404.13 308630.861 4341.555 NA
214 8285157.31 309225.496 4358.038 NA 249 8283352.87 308626.839 4340.583 NA
215 8285141.32 309188.882 4360.453 NA 250 8283282.7 308644.918 4342.585 NA
216 8285102.1 309150.473 4358.331 NA 251 8283277.61 308648.041 4342.744 NA
217 8285076.32 309117.424 4360.482 NA 252 8283230.03 308660.27 4343.179 NA
218 8285035.71 309103.73 4354.661 NA 253 8283121.96 308688.101 4343.174 NA
219 8284972.67 309108.206 4350.149 NA 254 8283043.45 308719.969 4343.485 NA
220 8284898.79 309093.503 4348.817 NA 255 8282999.61 308718.527 4343.932 NA
221 8284804.64 309037.73 4349.258 NA 256 8282963.79 308731.426 4344.44 NA
222 8284758 309010.981 4348.339 NA 257 8282947.34 308730.236 4344.814 NA
223 8284704.97 308993.234 4348.576 NA 258 8282914.27 308713.11 4345.958 NA
224 8284679.11 308977.348 4349.517 NA 259 8282894.66 308707.132 4346.269 NA
225 8284630.81 308979.41 4349.465 NA 260 8282876.77 308705.022 4345.893 NA
226 8284591.13 308985.411 4348.503 NA 261 8282843.88 308717.436 4343.537 NA
227 8284582.5 308990.199 4348.236 NA 262 8282811.68 308736.169 4340 NA
228 8284526.56 308991.782 4346.706 NA 263 8282796.38 308746.769 4340.43 NA
229 8284426.7 308937.651 4345.764 NA 264 8282785.33 308756.982 4340.787 NA
230 8284348.49 308902.217 4345.382 NA 265 8282772.71 308766.097 4341.096 NA
231 8284281.29 308887.402 4345.889 NA 266 8282749.37 308763.384 4342.572 NA
232 8284189.21 308848.137 4345.524 NA 267 8282718.49 308767.619 4343.931 NA
233 8284022.65 308778.927 4350.802 NA 268 8282708.66 308768.586 4344.476 NA
234 8283980.4 308760.279 4353.101 NA 269 8282684.45 308787.507 4343.937 NA
235 8283931.85 308742.216 4355.085 NA 270 8282674.21 308816.956 4340.982 NA
236 8283898.08 308705.239 4362.277 NA 271 8282653.99 308834.251 4341.254 NA
237 8283895.05 308707 4361.686 NA 272 8282629.5 308848.058 4341.824 NA
238 8283818.68 308726.003 4356.524 NA 273 8282609.5 308870.422 4341.715 NA
239 8283767.65 308734.713 4357.015 NA 274 8282590.65 308882.336 4341.673 NA
240 8283712.49 308727.4 4358.961 NA 275 8282565.4 308895.859 4341.432 NA
241 8283646.59 308732.72 4356.18 NA 276 8282537.96 308913.149 4340.806 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

277 8282487.84 308907.939 4342.564 NA 312 8281681.06 309260.062 4330.687 NA


278 8282446.95 308887.329 4345.753 NA 313 8281658 309269.417 4331.683 NA
279 8282399.61 308891.158 4346.218 NA 314 8281644.68 309277.673 4332.253 NA
280 8282392.02 308891.75 4346.254 NA 315 8281605.22 309302.132 4332.653 NA
281 8282389.49 308891.947 4346.265 NA 316 8281623.79 309312.292 4331.733 NA
282 8282374.18 308885.775 4347.332 NA 317 8281608.31 309343.906 4330.279 NA
283 8282355.23 308881.159 4348.389 NA 318 8281583.63 309367.721 4330.262 NA
284 8282321.08 308877.705 4348.736 NA 319 8281563.87 309377.726 4330.91 NA
285 8282293.9 308880.33 4347.954 NA 320 8281542.02 309372.81 4331.128 NA
286 8282293.86 308879.628 4348.073 NA 321 8281524.02 309372.617 4331.404 NA
287 8282266.85 308886.414 4346.532 NA 322 8281529.99 309395.486 4330.116 NA
288 8282245 308894.993 4344.67 NA 323 8281512.33 309415.274 4328.9 NA
289 8282226.44 308899.565 4343.434 NA 324 8281498.38 309443.062 4327.315 NA
290 8282216.72 308899.533 4343.251 NA 325 8281485.81 309447.372 4327.3 NA
291 8282204.11 308907.964 4341.069 NA 326 8281467.14 309460.753 4328.272 NA
292 8282174.74 308909.9 4339.772 NA 327 8281440.8 309465.929 4328.662 NA
293 8282131.72 308934.014 4339.524 NA 328 8281408.27 309489.511 4329.302 NA
294 8282096.51 308940.463 4339.433 NA 329 8281375.66 309509.742 4327.377 NA
295 8282071.03 308960.548 4337.76 NA 330 8281336.46 309528.604 4322.603 NA
296 8282027.24 308964.593 4339.102 NA 331 8281311.91 309520.66 4325.331 NA
297 8281960.75 308999.772 4335.65 NA 332 8281281.59 309546.964 4320.921 NA
298 8281920.02 309010.514 4335.332 NA 333 8281245.14 309551.343 4321.488 NA
299 8281890.77 309037.001 4333.769 NA 334 8281216.59 309570.317 4324.548 NA
300 8281858.02 309030.948 4334.269 NA 335 8281168.66 309592.465 4325.064 NA
301 8281837.05 309056.194 4332.814 NA 336 8281152.8 309599.599 4324.979 NA
302 8281808.02 309077.184 4331.811 NA 337 8281147.87 309599.905 4326.582 NA
303 8281782.59 309089.103 4331.584 NA 338 8281091.96 309637.127 4332.737 NA
304 8281770.89 309097.544 4331.526 NA 339 8281039.95 309673.488 4338.604 NA
305 8281749.41 309103.737 4331.925 NA 340 8280991.57 309696.936 4332.105 NA
306 8281728.05 309111.639 4332.304 NA 341 8280954.4 309701.204 4328.728 NA
307 8281716.48 309118.278 4332.483 NA 342 8280936.88 309711.554 4325.664 NA
308 8281707.33 309150.338 4332.329 NA 343 8280904.84 309734.987 4322.258 NA
309 8281698.15 309178.887 4332.206 NA 344 8280845.96 309748.489 4320.322 NA
310 8281704.19 309205.741 4331.308 NA 345 8280846.06 309694.518 4330.04 NA
311 8281688.72 309233.394 4331.023 NA 346 8280815.91 309696.069 4330.682 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

347 8280776.66 309718.131 4322.741 NA 382 8280291.87 310591.162 4311.995 NA


348 8280757.29 309736.345 4317.373 NA 383 8280312.21 310621.678 4299.903 NA
349 8280696.22 309771.261 4310.794 NA 384 8280321.29 310642.687 4294.288 NA
350 8280644.85 309779.262 4314.131 NA 385 8280325.46 310674.965 4291.609 NA
351 8280614.21 309820.863 4311.289 NA 386 8280339.96 310697.958 4286.674 NA
352 8280569.3 309831.118 4316.541 NA 387 8280338.58 310715.102 4286.744 NA
353 8280555.2 309867.712 4320 NA 388 8280335.02 310750.322 4290.268 NA
354 8280579.76 309893.401 4319.646 NA 389 8280350.89 310770.588 4289.878 NA
355 8280579.45 309901.508 4320.208 NA 390 8280361.52 310803.212 4290.466 NA
356 8280577.18 309904.886 4320.583 NA 391 8280366.7 310828.326 4289.658 NA
357 8280589.47 309920.315 4320.351 NA 392 8280362.15 310857.319 4290.489 NA
358 8280608.24 309938.746 4319.448 NA 393 8280353.58 310887.418 4292.02 NA
359 8280638.03 309969.837 4314.206 NA 394 8280353.22 310915.453 4291.295 NA
360 8280650.59 309992.225 4311.737 NA 395 8280360 310944.37 4289.427 NA
361 8280648.55 310031.717 4310.223 NA 396 8280357.96 310955.86 4289.3 NA
362 8280632.01 310058.31 4311.205 NA 397 8280359.47 310961.922 4288.955 NA
363 8280596.8 310104.362 4310.705 NA 398 8280352.85 310981.149 4288.881 NA
364 8280578.32 310140.019 4308.574 NA 399 8280352.88 310987.856 4288.024 NA
365 8280564.54 310175.437 4306.663 NA 400 8280334.34 311009.98 4285.55 NA
366 8280563.78 310210.862 4304.367 NA 401 8280323.66 311030.47 4283.61 NA
367 8280548.33 310245.947 4301.803 NA 402 8280296.34 311067.8 4279.646 NA
368 8280515.47 310253.119 4300.23 NA 403 8280300.6 311102.045 4277.271 NA
369 8280481.29 310263.291 4297.485 NA 404 8280251.58 311109.452 4280.921 NA
370 8280477.75 310264.771 4297.115 NA 405 8280215.02 311161.478 4279.327 NA
371 8280461.86 310270.609 4296.129 NA 406 8280180.82 311184.384 4280.326 NA
372 8280441.32 310279.283 4294.882 NA 407 8280125.86 311202.921 4285.11 NA
373 8280402.49 310294.86 4294.814 NA 408 8280119.09 311220.358 4283.098 NA
374 8280336.4 310327.111 4295.782 NA 409 8280091.2 311242.535 4282.441 NA
375 8280323.67 310330.963 4297.333 NA 410 8280092.55 311253.23 4279.793 NA
376 8280288.37 310383.427 4302.401 NA 411 8280070.16 311272.514 4280.86 NA
377 8280302.76 310398.309 4299.139 NA 412 8280059.68 311308.293 4279.62 NA
378 8280277.11 310463.575 4313.616 NA 413 8280041.4 311318.884 4283.383 NA
379 8280255.54 310503.845 4329.33 NA 414 8280029.36 311349.924 4283.649 NA
380 8280266.54 310528.071 4326.556 NA 415 8280014.25 311377.763 4284.361 NA
381 8280282.07 310554.991 4318.095 NA 416 8280006.66 311383.863 4285.091 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

417 8279985.45 311416.413 4284.105 NA 452 8279974.23 312290.266 4262.672 NA


418 8279987.06 311444.835 4280.722 NA 453 8279963.48 312307.879 4262.774 NA
419 8279976.46 311461.889 4280.408 NA 454 8279947.33 312350.33 4261.56 NA
420 8279973.48 311485.479 4278.831 NA 455 8279945.45 312363.262 4260.97 NA
421 8279962.91 311500.786 4281.012 NA 456 8279934.74 312392.771 4259.591 NA
422 8279961.59 311536.682 4279.918 NA 457 8279918.69 312395.649 4259.741 NA
423 8279946.71 311571.625 4285.233 NA 458 8279918.81 312400.003 4259.383 NA
424 8279969.97 311623.371 4277.104 NA 459 8279917.18 312430.144 4257.705 NA
425 8279977.77 311642.141 4276.681 NA 460 8279890.39 312466.402 4256.898 NA
426 8279962.82 311667.517 4282.427 NA 461 8279875.14 312501.528 4257.639 NA
427 8279982.87 311697.636 4279.476 NA 462 8279870.89 312516.171 4257.706 NA
428 8279983.17 311725.123 4282.31 NA 463 8279846.84 312558.863 4257.651 NA
429 8279988.09 311758.906 4284.945 NA 464 8279815.12 312576.396 4257.191 NA
430 8279994.66 311803.339 4286.966 NA 465 8279769.81 312602.328 4256.299 NA
431 8280005.5 311822.351 4284.769 NA 466 8279752.37 312611.154 4256.74 NA
432 8280017.77 311830.819 4281.801 NA 467 8279730.81 312628.074 4256.524 NA
433 8280025.68 311860.332 4281.064 NA 468 8279674.58 312651.535 4256.313 NA
434 8280048.96 311903.955 4274.775 NA 469 8279609.03 312686.893 4251.737 NA
435 8280052.11 311916.839 4273.373 NA 470 8279590.01 312697.284 4253.71 NA
436 8280056.92 311942.045 4271.017 NA 471 8279536.88 312727.633 4257.259 NA
437 8280058.63 311963.963 4269.608 NA 472 8279524.32 312744.542 4256.534 NA
438 8280061.91 311990.663 4269.218 NA 473 8279493.52 312806.627 4256.267 NA
439 8280069.77 312011.435 4268.392 NA 474 8279481.34 312831.896 4256.443 NA
440 8280069.79 312014.556 4268.497 NA 475 8279471.13 312849.057 4256.179 NA
441 8280070.1 312053.58 4269.807 NA 476 8279465.13 312864.808 4255.433 NA
442 8280070.43 312094.221 4268.356 NA 477 8279454.95 312881.907 4254.72 NA
443 8280064.32 312107.191 4268.347 NA 478 8279440.8 312908.733 4253.545 NA
444 8280064.38 312117.038 4267.864 NA 479 8279435.31 312945.471 4251.608 NA
445 8280047.68 312163.318 4266.376 NA 480 8279401.98 312985.772 4260.717 NA
446 8280020.03 312188.393 4266.315 NA 481 8279395.76 313000.629 4262.289 NA
447 8280010.91 312207.081 4265.489 NA 482 8279387.59 313025.284 4264.016 NA
448 8280000.25 312225.619 4264.719 NA 483 8279386.01 313053.958 4263.262 NA
449 8280008 312240.758 4263.281 NA 484 8279371.35 313080.481 4267.67 NA
450 8280003.38 312242.152 4263.467 NA 485 8279365.19 313095.181 4269.319 NA
451 8279977.26 312267.392 4263.582 NA 486 8279359.49 313130.824 4270.012 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

487 8279359.79 313151.386 4268.447 NA 522 8279355.43 314237.533 4249.019 NA


488 8279350.12 313194.383 4267.205 NA 523 8279365.21 314274.173 4244.28 NA
489 8279350.24 313198.668 4266.752 NA 524 8279368.93 314308.196 4241.325 NA
490 8279336.35 313232.374 4267.974 NA 525 8279352.54 314321.171 4241.62 NA
491 8279325.7 313248.539 4272.321 NA 526 8279353.9 314350.462 4239.97 NA
492 8279334.44 313273.68 4269.273 NA 527 8279350.2 314383.875 4238.359 NA
493 8279332.43 313294.957 4270.326 NA 528 8279326.4 314445.229 4241.401 NA
494 8279330.17 313321.305 4272.118 NA 529 8279312 314485.807 4242.001 NA
495 8279334.23 313345.741 4273.43 NA 530 8279313.47 314521.016 4239.333 NA
496 8279346.62 313390.247 4274.271 NA 531 8279280.5 314541.203 4242.62 NA
497 8279360.33 313426.822 4274.324 NA 532 8279280.37 314542.49 4242.498 NA
498 8279375.38 313471.13 4274.176 NA 533 8279262.31 314585.694 4239.792 NA
499 8279401.94 313504.086 4268.851 NA 534 8279236.19 314646.969 4238.001 NA
500 8279412.26 313530.066 4267.3 NA 535 8279232.65 314690.315 4235.063 NA
501 8279412.08 313536.008 4267.721 NA 536 8279230.92 314705.975 4234.371 NA
502 8279411.48 313555.805 4269.124 NA 537 8279224.57 314707.136 4234.912 NA
503 8279424.38 313582.412 4266.708 NA 538 8279178.56 314766.365 4233.44 NA
504 8279437.44 313621.331 4260.774 NA 539 8279121.75 314804.283 4236.117 NA
505 8279435.86 313643.611 4259.859 NA 540 8279111.32 314814.172 4235.988 NA
506 8279432.41 313673.844 4259.068 NA 541 8279049.49 314875.175 4235.031 NA
507 8279418.32 313693.564 4261.652 NA 542 8279046.04 314879.039 4234.982 NA
508 8279423.69 313748.279 4258.61 NA 543 8279033.98 314886.395 4234.765 NA
509 8279447.44 313792.363 4252.001 NA 544 8278990.63 314920.563 4233.293 NA
510 8279422.06 313824.048 4252.208 NA 545 8278987.65 314923.291 4233.144 NA
511 8279426.57 313864.388 4248.546 NA 546 8278975.19 314930.215 4232.853 NA
512 8279421.4 313865.101 4249.257 NA 547 8278963.1 314946.68 4232.537 NA
513 8279408.48 313901.268 4249.773 NA 548 8278941.28 314950.256 4232.262 NA
514 8279401.76 313930.14 4249.298 NA 549 8278936.69 314953.455 4232.177 NA
515 8279392.59 313968.349 4249.104 NA 550 8278929.05 314955.65 4232.07 NA
516 8279378.93 314019.419 4249.733 NA 551 8278920.09 314960.918 4231.914 NA
517 8279370.14 314061.542 4249.917 NA 552 8278913.86 314958.808 4231.871 NA
518 8279370.18 314063.568 4249.87 NA 553 8278903.2 314963.33 4231.705 NA
519 8279370.58 314091.87 4249.225 NA 554 8278879.85 314993.424 4230.813 NA
520 8279370.96 314134.129 4248.683 NA 555 8278860.64 315001.496 4229.987 NA
521 8279369.4 314164.145 4249.148 NA 556 8278859.83 315017.577 4229.502 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

557 8278863.5 315053.136 4229.386 NA 592 8278269.36 315487.874 4221.418 NA


558 8278851.36 315095.422 4229.013 NA 593 8278260.18 315492.667 4221.354 NA
559 8278841.35 315110.056 4228.972 NA 594 8278253.74 315497.125 4221.316 NA
560 8278834.23 315130.81 4228.74 NA 595 8278208.71 315527.028 4220.539 NA
561 8278851.33 315144.798 4228.582 NA 596 8278191.74 315538.111 4220.078 NA
562 8278840.63 315157.394 4228.442 NA 597 8278188.28 315552.987 4219.912 NA
563 8278849.17 315186.185 4228.12 NA 598 8278168.13 315552.638 4219.294 NA
564 8278807.54 315201.192 4227.961 NA 599 8278152.14 315573.143 4218.946 NA
565 8278795.57 315214.899 4227.694 NA 600 8278110.11 315584.255 4218.153 NA
566 8278775.04 315220.552 4227.346 NA 601 8278085.09 315597.718 4217.756 NA
567 8278751.52 315222.383 4226.996 NA 602 8278065.27 315602.589 4217.537 NA
568 8278741.95 315237.963 4226.571 NA 603 8278062.08 315601.593 4217.579 NA
569 8278711.43 315258.056 4225.659 NA 604 8278048.41 315603.713 4217.825 NA
570 8278698.6 315256.854 4225.731 NA 605 8278045.28 315607.68 4217.91 NA
571 8278695.46 315258.006 4225.722 NA 606 8278031.98 315606.084 4218.112 NA
572 8278670.59 315277.428 4225.578 NA 607 8277994.47 315626.94 4218.765 NA
573 8278645.15 315293.273 4225.642 NA 608 8277959.75 315632.452 4218.617 NA
574 8278610.63 315314.244 4225.448 NA 609 8277926.65 315657.274 4217.76 NA
575 8278589.31 315327.129 4225.279 NA 610 8277893.81 315662.373 4216.939 NA
576 8278577.71 315323.627 4225.395 NA 611 8277859.61 315677.149 4215.95 NA
577 8278552.78 315340.089 4225.272 NA 612 8277771.87 315731.267 4213.825 NA
578 8278536.5 315349.035 4225.267 NA 613 8277720.78 315754.475 4212.99 NA
579 8278517.75 315354.288 4225.184 NA 614 8277712.94 315765.226 4212.67 NA
580 8278486.63 315371.625 4224.658 NA 615 8277690.78 315760.566 4212.382 NA
581 8278449.18 315389.015 4224.008 NA 616 8277635.4 315768.648 4211.191 NA
582 8278431.58 315405.019 4223.654 NA 617 8277792.47 315722.171 4214.199 NA
583 8278415.67 315406.39 4223.467 NA 618 8277853.94 315655.031 4216.259 NA
584 8278401.67 315421.568 4223.146 NA 619 8277882.73 315703.041 4215.802 NA
585 8278368.48 315431.718 4222.674 NA 620 8277876.3 315690.666 4215.968 NA
586 8278368.45 315435.223 4222.634 NA 621 8277564.36 315772.641 4210.503 NA
587 8278334.43 315450.664 4222.095 NA 622 8277551.92 315776.279 4210.466 NA
588 8278334.56 315457.58 4222.018 NA 623 8277525.15 315779.042 4210.411 NA
589 8278307.49 315465.685 4221.635 NA 624 8277519.8 315777.787 4210.385 NA
590 8278303.62 315483.598 4221.796 NA 625 8277478.02 315768.012 4210.152 NA
591 8278270.71 315488.139 4221.439 NA 626 8277466.25 315765.276 4210.104 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

627 8277459.6 315764.971 4210.086 NA 662 8276874.93 315821.623 4204.607 NA


628 8277387.17 315768.718 4210.084 NA 663 8276921.13 315797.052 4205.709 NA
629 8277326.13 315774.689 4209.868 NA 664 8276970.91 315799.373 4206 NA
630 8277274.85 315776.517 4208.727 NA 665 8277022.72 315793.7 4206 NA
631 8277224.61 315783.83 4207.852 NA 666 8277060.77 315761.098 4206.082 NA
632 8277207.99 315780.734 4207.726 NA 667 8277108.14 315789.045 4206.596 NA
633 8277158.8 315782.433 4207.291 NA 668 8277142.75 315797.519 4206.812 NA
634 8277074.2 315798.468 4206.164 NA 669 8277276.37 315794.368 4208.527 NA
635 8276966.05 315787.846 4206 NA 670 8277384.1 315787.901 4209.803 NA
636 8276927.77 315788.416 4205.868 NA 671 8277911.16 315674.305 4217.043 NA
637 8276895.01 315802.579 4205.398 NA 672 8277949.53 315659.238 4218.208 NA
638 8276876.84 315804.045 4205.199 NA 673 8277969.03 315645.978 4218.815 NA
639 8276858.85 315808.073 4204.636 NA 674 8278253.15 315527.816 4221.646 NA
640 8276776.81 315818.282 4202.189 NA 675 8278536.93 315368.098 4225.033 NA
641 8276799.39 315807.29 4202.926 NA 676 8278818.66 315186.612 4228.118 NA
642 8276816.99 315834.291 4202.891 NA 677 8278906.53 314978.125 4231.574 NA
643 8276845.6 315823.584 4203.83 NA 678 8279071.82 314832.094 4235.635 NA
644 8276749.61 315838.206 4201.364 NA 679 8279294.77 314610.102 4235.096 NA
645 8276717.62 315876.293 4200.077 NA 680 8279390.26 314229.752 4244.62 NA
646 8276707.87 315881.589 4199.686 NA 681 8279463.26 313584.237 4259.442 NA
647 8276669.75 315915.043 4198.153 NA 682 8279355.46 313172.971 4267.805 NA
648 8276632.12 315945.5 4196.859 NA 683 8279491.42 312775.646 4257.621 NA
649 8276618.75 315975.093 4195.722 NA 684 8279815 312557.975 4259.01 NA
650 8276612.16 315973.596 4195.702 NA 685 8280013.79 312142.147 4270.199 NA
651 8276581.61 315990.343 4194.703 NA 686 8280069.77 311914.474 4269.331 NA
652 8276582.95 315967.315 4195.542 NA 687 8279958.26 311585.813 4280.898 NA
653 8276646.39 315967.722 4196.262 NA 688 8279997.71 311402.866 4284.28 NA
654 8276653.35 315948.925 4196.968 NA 689 8280130.51 311231.453 4279.354 NA
655 8276646.09 315931.876 4197.465 NA 690 8280157.16 311211.07 4278.515 NA
656 8276642.99 315884.253 4198.776 NA 691 8280246.79 311127.183 4279.539 NA
657 8276677.07 315899.11 4198.598 NA 692 8280362.9 311001.029 4285.455 NA
658 8276697.97 315901.133 4198.975 NA 693 8280357.1 310899.421 4291.23 NA
659 8276713.74 315850.333 4200.385 NA 694 8280371.7 310841.551 4288.81 NA
660 8276740.44 315846.261 4201.07 NA 695 8280319.86 310347.648 4295.336 NA
661 8276773.09 315821.795 4202.088 NA 696 8280551.07 310228.24 4303.505 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

697 8280619.53 310076.095 4311.451 NA 732 8283793.45 308728.17 4357.162 NA


698 8280646.57 310016.017 4311.548 NA 733 8283852.32 308714.45 4358.96 NA
699 8280605.51 309931.607 4319.722 NA 734 8283907.99 308723.049 4357.355 NA
700 8280594.36 309812.156 4313.97 NA 735 8284091.79 308822.924 4346.514 NA
701 8280698.99 309757.024 4312.962 NA 736 8284246.69 308875.125 4345.547 NA
702 8280758.48 309752.81 4315.504 NA 737 8284375.09 308925.853 4345.383 NA
703 8280802.33 309700.997 4329.321 NA 738 8284482.78 308965.238 4345.7 NA
704 8280856.74 309708.077 4325.526 NA 739 8284561.07 308987.238 4347.877 NA
705 8280873.87 309747.604 4321.926 NA 740 8284610.79 308983.785 4348.937 NA
706 8281037.17 309683.678 4337.674 NA 741 8284665.34 308978.192 4349.774 NA
707 8281194.58 309569.374 4326.798 NA 742 8284701.26 308987.208 4348.794 NA
708 8281521.7 309429.081 4327.677 NA 743 8284725.33 309000.465 4348.201 NA
709 8281710.43 309132.453 4332.458 NA 744 8284926.95 309097.421 4348.686 NA
710 8281999.1 308996.148 4335.703 NA 745 8285052.09 309110.476 4357.101 NA
711 8282111.82 308935.365 4339.637 NA 746 8285085.45 309139.42 4358.291 NA
712 8282309.51 308873.289 4349.327 NA 747 8285144.07 309207.063 4358.624 NA
713 8282420.32 308887.583 4346.293 NA 748 8285216.06 309248.373 4361.211 NA
714 8282465 308900.249 4343.99 NA 749 8285308.57 309305.02 4360.262 NA
715 8282505.62 308910.668 4341.838 NA 750 8285383.99 309350.902 4355.802 NA
716 8282559.23 308908.622 4340.713 NA 751 8285448.87 309353.641 4356.342 NA
717 8282580.39 308891.744 4341.399 NA 752 8285749.48 309385.673 4352.554 NA
718 8282622.9 308855.589 4341.831 NA 753 8285875.45 309409.134 4353.626 NA
719 8282620.71 308858.178 4341.819 NA 754 8286052.29 309335.503 4361.094 NA
720 8282680.05 308804.807 4342.155 NA 755 8286241.22 309375.958 4362.216 NA
721 8282731.26 308768.892 4343.129 NA 756 8286360.88 309308.3 4367.39 NA
722 8282775.52 308748.866 4341.804 NA 757 8286510.2 309221.328 4372.494 NA
723 8282860.72 308712.12 4344.827 NA 758 8286601.67 309231.634 4368.517 NA
724 8282928.67 308716.49 4345.545 NA 759 8286683.08 309246.754 4369.599 NA
725 8282980.62 308724.749 4344.269 NA 760 8286732.66 309227.907 4370.09 NA
726 8283187.91 308678.603 4343.02 NA 761 8286782.39 309219.53 4370.439 NA
727 8283381.62 308614.212 4341.842 NA 762 8286816.92 309241.462 4367.749 NA
728 8283518.43 308680.228 4348.476 NA 763 8286845.44 309259.306 4367.512 NA
729 8283626.37 308735.075 4354.528 NA 764 8287060.57 309179.398 4372.911 NA
730 8283677.11 308726.377 4358.146 NA 765 8287186.14 309119.544 4368.643 NA
731 8283757.35 308726.029 4358.751 NA 766 8287229.56 309092.592 4367.824 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

767 8287319.82 309029.061 4368.742 NA 802 8288517.75 309265.694 4409.099 NA


768 8287499.01 308916.847 4372.541 NA 803 8288556.53 309322.359 4415.212 NA
769 8287574.14 308897.531 4374.516 NA 804 8288632.13 309376.409 4422.927 NA
770 8287718.93 308889.445 4378.921 NA 805 8288677.24 309406.052 4424.06 NA
771 8287821.56 308882.073 4381.473 NA 806 8288759.22 309403.321 4431.582 NA
772 8287851.15 308850.381 4386.769 NA 807 8288854.49 309419.473 4434.503 NA
773 8287889.76 308863.49 4384.565 NA 808 8288932.91 309483.562 4427.968 NA
774 8287931.22 308901.263 4382.504 NA 809 8289298.62 310025.618 4424.131 NA
775 8287977.74 308938.528 4381.586 NA 810 8290126.15 310718.66 4426.933 NA
776 8288079.95 308975.809 4381.44 NA 811 8290580.52 310708.584 4427.328 NA
777 8288128.22 308982.343 4383.879 NA 812 8290855.34 310708.79 4433.09 NA
778 8288216.38 308958.293 4388.814 NA 813 8291239.97 310683.425 4445.48 NA
779 8288289.34 308940.679 4394.831 NA 814 8291414.3 310716.945 4441.996 NA
780 8288323.2 308948.391 4395.089 NA 815 8291811.89 310850.973 4445.878 NA
781 8288374.24 308963.233 4397.689 NA 816 8292114.68 310898.537 4467.175 NA
782 8288426.42 308975.428 4402.348 NA 817 8292555.25 310983.166 4469.257 NA
783 8288461.38 308982.408 4407.64 NA 818 8293036.29 311101.528 4485.158 NA
784 8288472.32 308999.211 4407.27 NA 819 8293133.86 311323.27 4474.381 NA
785 8288461.77 309020.093 4401.684 NA 820 8293233 311487.678 4479.119 NA
786 8288462.05 309038.322 4398.846 NA 821 8293369.55 311536.708 4479.51 NA
787 8288455.16 309062.099 4396.704 NA 822 8293564.94 311532.565 4478.777 NA
788 8288455.7 309079.922 4396.406 NA 823 8293617.98 311519.206 4479.127 NA
789 8288465.22 309099.47 4398.452 NA 824 8293761.16 311518.572 4478.829 NA
790 8288476.04 309097.982 4401.336 NA 825 8293817.14 311521.044 4478.243 NA
791 8288470.64 309075.352 4400.253 NA 826 8293839.33 311502.12 4481.793 NA
792 8288483.19 309054.173 4403.547 NA 827 8293846.47 311521.253 4480.101 NA
793 8288495.55 309023.624 4408.592 NA 828 8293865.88 311506.156 4483.042 NA
794 8288502.26 309024.412 4409.962 NA 829 8293871.25 311522.478 4481.553 NA
795 8288499.27 309048.407 4407.352 NA 830 8293886.87 311516.581 4483.218 NA
796 8288495.8 309098.389 4406.553 NA 831 8293889.29 311533.295 4481.496 NA
797 8288495.34 309098.674 4406.43 NA 832 8293912.34 311526.764 4483.176 NA
798 8288508.35 309118.558 4410.022 NA 833 8293908.67 311556.587 4479.811 NA
799 8288511.49 309131.473 4410.808 NA 834 8293938.06 311550.785 4481.437 NA
800 8288510.66 309154.779 4409.692 NA 835 8293922.37 311573.495 4478.496 NA
801 8288508.43 309212.567 4406.987 NA 836 8293949.93 311581.803 4478.751 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

837 8293932.42 311594.091 4477.029 NA 872 8294231.15 311694.976 4489.68 NA


838 8293953.49 311600.886 4477.422 NA 873 8294260.47 311683.484 4495.026 NA
839 8293936.53 311607.164 4476.342 NA 874 8294280.02 311697.647 4493.768 NA
840 8293959.07 311609.91 4477.002 NA 875 8294288.17 311685.28 4497.443 NA
841 8293953.71 311616.449 4476.347 NA 876 8294311.52 311702.615 4495.416 NA
842 8293970.6 311616.966 4476.91 NA 877 8294314.37 311687.88 4499.389 NA
843 8293967.34 311625.22 4476.193 NA 878 8294345.8 311708.725 4496.792 NA
844 8293981.21 311621.191 4476.964 NA 879 8294345.32 311681.35 4504.177 NA
845 8293986.76 311634.84 4476.096 NA 880 8294380.66 311709.794 4497.892 NA
846 8293997.5 311628.711 4477.213 NA 881 8294377.16 311685.083 4504.77 NA
847 8294008.98 311640.164 4477.13 NA 882 8294425.66 311719.395 4495.593 NA
848 8294016.54 311630.336 4478.519 NA 883 8294427.98 311690.851 4503.593 NA
849 8294025.48 311642.897 4478.097 NA 884 8294465.46 311710.652 4498.78 NA
850 8294050.81 311638.498 4480.338 NA 885 8294453.97 311676.101 4507.979 NA
851 8294059.76 311649.711 4479.922 NA 886 8294507.5 311721.07 4497.673 NA
852 8294069.51 311641.271 4481.436 NA 887 8294516.84 311686.636 4507.165 NA
853 8294072.02 311655.059 4480.26 NA 888 8294558.54 311726.892 4498.342 NA
854 8294084.19 311644.42 4482.229 NA 889 8294571.78 311698.918 4506.387 NA
855 8294087.04 311658.421 4481.085 NA 890 8294610.73 311736.616 4497.829 NA
856 8294098.58 311650.714 4483.161 NA 891 8294606.16 311696.017 4509.012 NA
857 8294101.81 311661.437 4482.233 NA 892 8294677.87 311733.142 4499.022 NA
858 8294101.86 311662.49 4482.112 NA 893 8294672.59 311688.135 4510.444 NA
859 8294111.36 311655.87 4483.895 NA 894 8294743.58 311706.388 4501.35 NA
860 8294116.91 311668.063 4482.839 NA 895 8294738.56 311663.579 4510.465 NA
861 8294127.22 311659.631 4485.004 NA 896 8294827.72 311672.956 4493.816 NA
862 8294134.56 311672.357 4483.818 NA 897 8294811.65 311634.508 4507.768 NA
863 8294145.17 311663.157 4486.234 NA 898 8294799.24 311609.578 4517.868 NA
864 8294150.16 311675.297 4484.732 NA 899 8294915.62 311621.933 4492.723 NA
865 8294159.88 311668.954 4486.636 NA 900 8294895.97 311573.887 4507.46 NA
866 8294165.4 311681.021 4485.314 NA 901 8294973.85 311595.113 4491.664 NA
867 8294176.9 311673.645 4487.323 NA 902 8294964.35 311557.958 4497.878 NA
868 8294185.57 311688.877 4486.102 NA 903 8295027.18 311578.108 4487.296 NA
869 8294194.15 311675.371 4489.061 NA 904 8295022.01 311530.549 4493.943 NA
870 8294202.39 311689.425 4487.763 NA 905 8295053.72 311540.629 4490.034 NA
871 8294216.82 311679.959 4490.908 NA 906 8295071.54 311557.49 4486.469 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

907 8295091 311524.132 4489.027 NA 942 8295650.92 311019.383 4506.333 NA


908 8295057.83 311497.825 4495.134 NA 943 8295673.98 311056.801 4502.451 NA
909 8295112.73 311475.667 4492.957 NA 944 8295710.2 311014.494 4507.723 NA
910 8295152.6 311450.954 4490.986 NA 945 8295712.58 311049.922 4503.457 NA
911 8295118.95 311418.921 4496.866 NA 946 8295809.78 311009.426 4510.05 NA
912 8295174.74 311413.147 4489.624 NA 947 8295806.42 311056.046 4502.77 NA
913 8295161.9 311367.003 4495.392 NA 948 8295861.91 311025.372 4506.949 NA
914 8295201.45 311361.004 4491.171 NA 949 8295887.27 311066.54 4501.401 NA
915 8295190.51 311302.085 4497.499 NA 950 8295921.03 311027.143 4506.471 NA
916 8295236.73 311324.074 4492.197 NA 951 8295952.57 311072.839 4499.809 NA
917 8295228.33 311275.767 4497.49 NA 952 8296005.96 311014.74 4505.67 NA
918 8295254 311296.706 4493.097 NA 953 8296067.09 311097.533 4495.061 NA
919 8295267.14 311214.27 4500.95 NA 954 8296084.79 310991.4 4504.339 NA
920 8295283.44 311264.436 4494.249 NA 955 8296171.83 311044.772 4495.549 NA
921 8295298.65 311219.549 4498.201 NA 956 8296166.79 310986.933 4501.265 NA
922 8295301.3 311259.497 4494.324 NA 957 8296256.85 311007.164 4499.027 NA
923 8295300.56 311280.821 4492.311 NA 958 8296248.69 310958.638 4501.483 NA
924 8295314.5 311259.338 4494.031 NA 959 8296344.96 310974.739 4501.202 NA
925 8295313.23 311225.202 4497.202 NA 960 8296335.98 310939.12 4502.057 NA
926 8295344.62 311225.902 4496.155 NA 961 8296389.9 310950.454 4502.708 NA
927 8295363.51 311210.265 4497.094 NA 962 8296375 310916.609 4502.516 NA
928 8295357.59 311179.803 4501.107 NA 963 8296420.65 310929.966 4502.958 NA
929 8295396.69 311187.3 4498.019 NA 964 8296417.02 310929.796 4502.938 NA
930 8295390.36 311153.433 4501.951 NA 965 8296405.95 310891.035 4502.458 NA
931 8295438.76 311168.802 4497.609 NA 966 8296441.86 310879.969 4503.394 NA
932 8295446.54 311120.448 4502.152 NA 967 8296427.54 310849.515 4503.049 NA
933 8295484.26 311152.539 4496.977 NA 968 8296467.26 310858.712 4504.541 NA
934 8295492.31 311100.994 4502.182 NA 969 8296430.49 310825.374 4504.359 NA
935 8295557.03 311114.001 4497.118 NA 970 8296493.37 310831.868 4505.711 NA
936 8295532.37 311077.384 4502.12 NA 971 8296469.68 310789.286 4506.347 NA
937 8295591.1 311083.477 4499.823 NA 972 8296523.62 310801.492 4507.216 NA
938 8295560.19 311051.286 4502.724 NA 973 8296496.66 310759.518 4507.781 NA
939 8295596.79 311061.724 4501.764 NA 974 8296555.29 310770.73 4509.226 NA
940 8295578.01 311019.56 4506.464 NA 975 8296536.03 310721.924 4509.614 NA
941 8295636.1 311059.733 4501.913 NA 976 8296583.8 310745.922 4509.995 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

977 8296566.82 310696.301 4510.712 NA 1012 8297265.15 310661.922 4547.634 NA


978 8296626.27 310709.378 4510.277 NA 1013 8297294.45 310619.943 4545.427 NA
979 8296606.5 310666.041 4511.13 NA 1014 8297305.93 310658.541 4552.137 NA
980 8296664.72 310689.531 4510.584 NA 1015 8297335.63 310617.156 4548.377 NA
981 8296651.29 310642.682 4511.635 NA 1016 8297336.22 310678.356 4553.222 NA
982 8296709.33 310668.325 4511.06 NA 1017 8297375.74 310630.853 4551.905 NA
983 8296716.64 310626.758 4512.894 NA 1018 8297373.94 310698.146 4553.886 NA
984 8296746.55 310662.345 4511.391 NA 1019 8297423.24 310643.233 4554.661 NA
985 8296747.8 310624.489 4513.492 NA 1020 8297433.1 310712.198 4555.991 NA
986 8296809.33 310660.236 4514.485 NA 1021 8297469.5 310667.964 4556.514 NA
987 8296790.86 310589.904 4516.092 NA 1022 8297501.21 310686.755 4557.818 NA
988 8296851.49 310614.717 4516.535 NA 1023 8297502.74 310653.445 4557.859 NA
989 8296829.58 310582.119 4516.83 NA 1024 8297551.83 310680.559 4558.942 NA
990 8296905.76 310576.622 4516.674 NA 1025 8297531.82 310616.215 4560.292 NA
991 8296912.03 310529.361 4525.4 NA 1026 8297605.13 310643.515 4560.122 NA
992 8296973.36 310552.219 4521.853 NA 1027 8297599.02 310584.919 4563.19 NA
993 8296999.66 310557.615 4520.91 NA 1028 8297628.48 310630.397 4560.199 NA
994 8297048.57 310517.512 4531.337 NA 1029 8297666.42 310593.672 4561.652 NA
995 8297093.11 310539.733 4526.845 NA 1030 8297662.64 310637.042 4558.903 NA
996 8297112.32 310499.394 4534.111 NA 1031 8297709.92 310610.284 4560.262 NA
997 8297157.2 310520.166 4531.867 NA 1032 8297682.95 310657.113 4557.198 NA
998 8297157.42 310521.271 4531.721 NA 1033 8297693.17 310670.322 4557.09 NA
999 8297177.47 310470.807 4542.095 NA 1034 8297729.49 310641.809 4557.824 NA
1000 8297226.13 310505.946 4535.532 NA 1035 8297722.71 310673.115 4556.592 NA
1001 8297272.57 310466.144 4543.428 NA 1036 8297739.21 310694.052 4556.227 NA
1002 8297262.2 310501.539 4536.643 NA 1037 8297769.31 310657.759 4556.041 NA
1003 8297350.36 310487.103 4540.289 NA 1038 8297768.81 310693.686 4555.065 NA
1004 8297243.51 310524.661 4535.056 NA 1039 8297806.83 310667.473 4553.986 NA
1005 8297296.69 310540.688 4538.435 NA 1040 8297815.97 310724.535 4552.332 NA
1006 8297238.17 310575.639 4531.717 NA 1041 8297846.99 310692.808 4551.679 NA
1007 8297305.03 310581.523 4541.219 NA 1042 8297852.91 310732.795 4550.541 NA
1008 8297220.23 310609.211 4534.133 NA 1043 8297890.18 310707.359 4552.024 NA
1009 8297192.86 310637.096 4535.12 NA 1044 8297905.43 310745.785 4551.183 NA
1010 8297261.79 310631.766 4542.843 NA 1045 8297943.27 310714.882 4553.371 NA
1011 8297216.62 310673.016 4542.472 NA 1046 8297944.6 310763.605 4551.896 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

1047 8297975.2 310724.918 4554.318 NA 1082 8298588.06 311018.984 4559.517 NA


1048 8297982.92 310771.173 4552.734 NA 1083 8298586.92 311052.147 4558.484 NA
1049 8297981.35 310770.398 4552.712 NA 1084 8298586.57 311075.967 4557.767 NA
1050 8298024.02 310733.273 4555.822 NA 1085 8298585.42 311073.37 4557.832 NA
1051 8298004.93 310787.518 4552.762 NA 1086 8298628.02 311071.503 4559.905 NA
1052 8298045.38 310754.252 4554.911 NA 1087 8298687.66 311048.453 4564.089 NA
1053 8298021.01 310817.303 4551.942 NA 1088 8298681.17 311094.884 4562.602 NA
1054 8298088.91 310794.703 4554.429 NA 1089 8298683.05 311116.504 4562.1 NA
1055 8298074.69 310835.611 4551.814 NA 1090 8298728.48 311101.7 4564.236 NA
1056 8298064.99 310874.858 4550.555 NA 1091 8298812.71 311046.41 4572.891 NA
1057 8298098.14 310857.125 4551.958 NA 1092 8298790.6 311128.455 4565.332 NA
1058 8298151.99 310828.912 4554.582 NA 1093 8298797.59 311158.442 4564.746 NA
1059 8298139.13 310869.128 4553.223 NA 1094 8298870.18 311140.2 4565.004 NA
1060 8298125.49 310902.887 4552.584 NA 1095 8298909.71 311090.462 4571.529 NA
1061 8298175.52 310884.16 4554.754 NA 1096 8298923.65 311154.793 4568.413 NA
1062 8298263.95 310865.488 4558.835 NA 1097 8298916.47 311195.784 4566.123 NA
1063 8298209.89 310904.985 4555.83 NA 1098 8298978.17 311186.683 4569.021 NA
1064 8298201.85 310934.883 4555.034 NA 1099 8299051.02 311169.964 4578.483 NA
1065 8298266.84 310914.463 4556.891 NA 1100 8299033.35 311217.893 4570.701 NA
1066 8298303.25 310896.009 4558.561 NA 1101 8299003.38 311261.591 4566.145 NA
1067 8298299.4 310944.614 4556.519 NA 1102 8299095.63 311248.908 4574.561 NA
1068 8298296.67 310981 4555.971 NA 1103 8299150.38 311261.266 4579.303 NA
1069 8298336.96 310952.844 4556.818 NA 1104 8299160.16 311301.959 4575.106 NA
1070 8298371.11 310933.789 4557.401 NA 1105 8299110.52 311341.591 4568.191 NA
1071 8298371.14 310968.787 4556.789 NA 1106 8299215.24 311356.283 4575.604 NA
1072 8298382.97 311006.07 4556.149 NA 1107 8299250.4 311318.783 4582.65 NA
1073 8298406.76 310982.439 4556.681 NA 1108 8299258.83 311390.845 4576.366 NA
1074 8298432.43 310971.222 4556.959 NA 1109 8299260.7 311432.577 4574.279 NA
1075 8298429.31 310990.629 4556.605 NA 1110 8299307.19 311422.552 4577.965 NA
1076 8298428.05 311019.257 4556.172 NA 1111 8299336.39 311404.618 4580.568 NA
1077 8298467.68 311002.971 4556.694 NA 1112 8299365.93 311430.33 4581.623 NA
1078 8298506.2 310978.586 4557.086 NA 1113 8299361.47 311459.474 4580.96 NA
1079 8298504.64 311014.278 4557.008 NA 1114 8299412.71 311447.202 4582.856 NA
1080 8298506.38 311046.762 4557.035 NA 1115 8299412.8 311403.064 4587.58 NA
1081 8298545.43 311030.285 4558.068 NA 1116 8299453.93 311476.215 4589.601 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

Point Northing Elevation Point Northing Elevation


Easting (m) Description Easting (m) Description
Name (m) (m) Name (m) (m)

1117 8299420.5 311492.111 4590.567 NA 1120 8299544.46 311501.392 4600.15 NA


1118 8299505.29 311482.605 4594.315 NA 1121 8299519.71 311527.84 4603.391 NA
1119 8299506.43 311442.404 4591.178 NA 1122 8299568.32 311505.766 4601.684 NA
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

PANEL FOTOGRAFICO

VISTA FOTOGRAFICA DEL PUNTO DE INICIO DEL TRAMO DEL CAMINO VECINAL CENTRO POBLADO
QUETAPALO (PROGRESIVA KM 0+000)

VISTA FOTOGRAFICA DE ESTRUCTURAS ACTUALESEXISTENTES Y VERIFICACIONDEL ESTADO FUNCIONAL


DE LOS MISMOS (PROGRESIVA KM 2+800)
PROYECTO 03-001
ESTUDIO TOPOGRAFICO REVISION FGT
APROBADO EEQA
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL SECTOR CCALA CCALA - JARPAÑA -
MILLO CCOCHAPATA - LLANCA - QUILLISANI DEL DISTRITO DE PARATIA, PROVINCIA LAMPA FECHA MAYO- 2015
– PUNO
ETAPA: ESTUDIOS DEFINITIVOS Esp.: Ingeniería del Proyecto

VISTA FOTOGRAFICA REALIZANDO EL LEVANTAMIENTO TOPOGRAFICO DEL TRAMO DEL CAMINO VECINAL
(PROGRESIVA KM 0+000 A 31,502.00)

PLANOS

Das könnte Ihnen auch gefallen