PROJECT: FOUR LANING OF SIMGA-SARGAON BYPASS(PACKAGE-II) OF NH-200(NEW NH-130)

FROM Km 48.580 TO Km 91.026 SECTION OF RAIPUR-BILASPUR ROAD IN STATE OF


CHHATTISGARH UNDER NHDP-IV ON EPC MODE.
Pending Approvals from AE Date:12-12-17

S.N. Description Date of Initial Submission Date of Initial Approval Date of GFC Submission Remarks

1 77&79 BC
2 MCW P&P 66+000-68+000 L&T 427 dt. 20.09.2017 Approval pending
3 54+413 HPC
4 Major Junction (4 nos.) L&T 128 dt. 21.12.2016 Approval pending
5 Major junction (CoS) L&T 403 dt. 17.08.2017 Approval pending
6 Minor Junction (30 nos.) L&T 273 dt. 28.03.2017 Approval pending
7 Signages L&T 388 dt. 28-07-17 Approval pending
8 69+156 MNB widening proposal L&T 360 dt. 24-06-17 Approval pending
9 Re-wall drawings L&T 456 dt. 10-11-17 Approval pending
S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks

1 GFC Drawings (Complete Highway and


Structures)
2 Main Carriageway Plan & Profile 48+580 to 91+026 L&T 028 dt. 07.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Typical Cross Section L&T 028 dt. 07.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Approved (LEC 158 dt. 31.01.2017)
Schedules of TCS L&T 028 dt. 07.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Service Road Plan & Profile 9 locations L&T 029 dt. 12.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Joint Detailing
Setting Out Data
Levels for Construction MCW
Levels for Construction SR

3 Pavement Design Report Main Carriageway L&T 038 dt. 28.09.2016 LEC 117 dt. 12.01.2017 NA NA Approved (LEC 117 dt. 12.01.2017)
Service Road L&T 186 dt. 30.01.2017 Reviewed NA NA Compliance Submitted

4 Major Bridge (1 no.)


L&T 047 dt. 12.10.2016 Conditional Appoval received subjected to IIT Proof check
L&T 058 dt. 04.11.2016 (LEC-97 dt. 02.01.2017)
LEC 97 dt. 02.01.2017 (LEC-250 dt. 15.03.2017)
68+385 L&T 060 dt. 10.11.2016 L&T 302 dt. 22.04.2017 GFC RECEIVED
L&T 097 dt. 01.12.2016 LEC 250 dt. 15.03.2017 GFC_Proof Checked by IIT drawing submitted on 06.03.2017 &
01.04.2017
L&T 136 dt. 28.12.2016 GFC approval awaited

L&T 297 dt. 18.04.2017


L&T 314 dt. 11.05.2017 Justification for Revision in Founding Level Submitted. Approval
L&T 315 dt. 12.05.2017 awaited.

Revised GAD of MJB

5 Minor Bridge (7 nos.) 50+374


55+204
56+618 L&T 047 dt. 12.10.2016 LEC 181 dt. 11.02.2017 L&T 288 dt. 13.04.2017 LEC 408 dt.20.06.2017 Approved (LEC 408 dt.20.06.2017)
85+839
58+531

50+615 L&T 058 dt. 04.11.2016 Approval Awaited (50+615) Resubmission L&T 407 dt. 23-08-17
L&T 061 dt. 10.11.2016
LEC 200 dt. 22.02.2017 L&T 301 dt. 22.04.2017
L&T 099 dt. 01.12.2016
69+153 L&T 137 dt. 28.12.2016 LEC 408 dt.20.06.2017 Approved (LEC 408 dt.20.06.2017)
6 VUP (5 nos.)
L&T 230 dt. 06.03.2017 COS Proposal has been reviewed by AE LEC 332 dt. 24.04.17
49+879 LEC 167 dt. 06.02.2017 L&T 280 dt. 07.04.2017 Approved GFC_Approval Awaited
L&T 328 dt. 23.05.2017

59+793 L&T 047 dt. 12.10.2016 LEC 167 dt. 06.02.2017 L&T 230 dt. 06.03.2017 LEC 264 dt. 19.03.2017 GFC_Approved (LEC 264 dt. 19.03.2017)
L&T 071 dt. 14.11.2016
L&T 230 dt. 06.03.2017 GFC_Approval Awaited
67+110 LEC 167 dt. 06.02.2017 L&T 300 dt. 22.04.2017 Approved Design issue due to cross road FRL mismatch
80+949 - L&T 230 dt. 06.03.2017 LEC 264 dt. 19.03.2017 GFC_Approved (LEC 264 dt. 19.03.2017)
84+208 - L&T 230 dt. 06.03.2017 LEC 264 dt. 19.03.2017 GFC_Approved (LEC 264 dt. 19.03.2017)

7 PUP (5 nos.) 54+309 LEC 265 dt. 19.03.2017


57+156 LEC 265 dt. 19.03.2017
65+066 L&T 047 dt. 12.10.2016 LEC 167 dt. 06.02.2017 L&T 231 dt. 06.03.2017 LEC 265 dt. 19.03.2017 GFC_Approved (LEC 265 dt. 19.03.2017)
75+390 LEC 265 dt. 19.03.2017
87+274 LEC 265 dt. 19.03.2017
S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks
S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks

8 Box Culvert (22 nos.) L&T 041 dt. 29.09.2016


18 Nos. L&T 058 dt. 04.11.2016 LEC 166 dt. 06.02.2017 L&T 229 dt. 06.03.2017 LEC 266 dt. 19.03.2017 GFC_Approved (LEC 266 dt. 19.03.2017)
L&T 098 dt. 01.12.2016
54+723 L&T 396 dt. 12.08.2017 Approved GFC Resubmitted
50+422
53+427
L&T 143 dt. 05.03.2017 LEC 272 dt. 21.03.2017 - - COS_Approval Received from Irrigation deptt.
59+945
65+000

79+556 & 77+715(CoS) Approved Reconstruction of Half Side (letter yet to receive)

9 Pipe Culverts (54 nos.) L&T 031 dt. 19.09.2016


GFC_Approved 52 nos.
52 nos. L&T 034 dt. 21.09.2016 LEC 036 dt. 21.11.2016 L&T 216 dt. 25.02.2017 LEC 270 dt. 20.03.2017
L&T 058 dt. 04.11.2016 (LEC 270 dt. 20.03.2017)

55+636
L&T 143 dt. 05.03.2017 LEC 272 dt. 21.03.2017 - - COS_Approval Received from Irrigation deptt.
57+534
57+450 L&T 416 dt. 05.09.17 Resubmitted (due to Relocation)

10 Major Junction (5 nos.) Submitted L&T 128 dt. 21.12.2016 - - - Comments received on 11.05.2017.
Compliance Submitted on 30.05.2017
Major junction (CoS) Submitted

11 Minor Junction (30 nos.) Submitted L&T 273 dt. 28.03.2017 - - - Found ok (02-02-18 meeting) MOM
Minor Junction detailed (26 nos.) Submitted L&T 570 dt. 17.03.2018 Review and Approval Awaited

12 Drainage Plan & Profile Earthen Drain L&T 127 dt. 21.12.2016 Submitted
Earthen Drain Design L&T 571 dt. 17.03.2018 Resubmitted
Median Drain L&T 127 dt. 21.12.2016 - L&T 274 dt. 28.03.2017 LEC 312 dt. 05.04.2017 GFC_Approved (LEC 312 dt.05.04.2017)
Left and Right Box Drain L&T 127 dt. 21.12.2016 - L&T 274 dt. 28.03.2017 LEC 312 dt. 05.04.2017 GFC_Approved (LEC 312 dt.05.04.2017)

13 RE Wall_Panel Design and Drawings


Superseded
9 locations L&T 245 dt. 09.03.2017 - - -

L&T 329 dt. 24.05.2017 Approved


RE Wall Drawings RE wall dwg for PUP
@ch. 57+156 Approved
L&T 386 dt. 22-07-17
65+066 LEC 456 dt. 10.11.2017 submitted
49+879 LEC 456 dt. 10.11.2017 submitted
54+310 LEC 456 dt. 10.11.2017 submitted
59+793 LEC 456 dt. 10.11.2017 submitted
75+390 LEC 456 dt. 10.11.2017 submitted
80+949 LEC 456 dt. 10.11.2017 submitted
84+208 LEC 456 dt. 10.11.2017 submitted
87+274 LEC 456 dt. 10.11.2017 submitted
Truck Lay bye L&T 307 dt. 03.05.2017 Compliance submitted on letter no LEC 648
Bus Bay & Bus Shelter L&T 307 dt. 03.05.2017 L&T 564 dt. 03.03.2018 Compliance submitted on letter no LEC 646
Passenger shelter L&T 570 dt. 17.03.2018 submitted
S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks

Landscaping Detail L&T 307 dt. 03.05.2017 Approval Pending


14 Rest Area Typical Approved Compliance submitted on letter no LEC 649
15 Land Obstruction

15 Correspondances related to Design


16 Detail Project Report Feasibility Study

Approved
Pending
Important Contact Details - RBRP
S.N. Organisation Name Contact Details

1 LNT HQ EDRC Mahendrakar Avinash Y 9869439415

2 Digambar Kadbhane 9167171525/ 02261817554

3 Rajesh Neelakantan 8879182625

4 Tenneti Subramanyam Sastry 7775805950/02261817627

5 Chiranjit Chattopadhyay 7715058990/02261817568

Suraj Rajaram Shingare 8378822106/02261817

6 Satya Kumar Sunkhavalli 9769968846

7 Vidyaranya Bandi 8879970090

8 Amit Kumar Jha 8554981055

9 Budmal Jain 9326005100/02261817604

10 Makrand Jivan Suryavanshi 9011057770/02261817622

11 Rajesh Paul 7718822300

12 Bhushan Patil 9619691103/02261817688

13 LNTIEL Kavin J 9445392022/9994505077

14 Akhilesh 9663025100

15 Yuvraj P 9445392009

16 Ansar 9791594545

17 Vignesh 9176195152

18 Techfab Saurabh Vyas 9898385026

19 Bhushan Khirwadkar 8446944598/02653390931

20 Gunjan Disawal 9930893113

21 Nilesh Rathod 9559064807

22 Marshal Geotest Lab Nirmalkar 9826862999

23 National Geotech Tarun 9811262638

24 LEC (Authority Engr.) Sushil Nimbark 8817009004

25 K Venkat Rao 9948925661

26 Feedback Prasanth 9880037785


27 DBL Devjit/Suman 7898501175

Panna 9824400779

28 Punj Lloyd Ankit 9630098998

29 Arjan 9522306214
s - RBRP
Remarks

Structure

Structure

Design Director Highway & Structure

Highway

Highway (Shastry sir)

Structure (Digambar sir)

Pavement Design

Geotechnical

Drainage

RE Wall

RE Wall

Formwork Design & Construction Methods

Formwork Design & Construction Methods

Highway

Highway

Structure

Structure

Structure

RE Wall

RE Wall (Design & Drawing)

RE Wall (Construction)

RE Wall (Construction)

Geotechnical testing Lab

Geotechnical testing Lab

GM Design

Bridge Designer

Safety Expert
Planning Engineer

Highway Designer of DBL (panna@inficivil.com)

Planning Engineer

Survey cum highway-in-Charge


DESIGN & DRAWING ISSUE 15.01.2017
S.N. Description Reference Remarks

1 P&P 48+580 to 50+000


LEC/AE/NHAI/pkg-II/2016- Compliance Submitted (Letter no 493 14-12-
17/654 17 )

2 P&P 90+000 to 91+026 LEC/AE/NHAI/pkg-II/2016-17/655 Compliance Submitted (Letter no 494 14-12-


17 )
3 Bus bay location (90+726)
4 Detailed Rest area drawings
5 Truck lay bye
6 69+156 MNB revised design and drawing Rejected
7 Rain water harvesting drawing Compliance need to submit
8 Protection work and other misc drawings Need to submit
9 Revised GAD (Discharge Drainout from
56+618 MNB Median drain)
10 66 to 68 P&P Letter no-427 Dated 20-09-17
S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks

GFC Drawings (Complete Highway and


1 Structures)
2 Main Carriageway Plan & Profile 48+580 to 91+026 L&T 028 dt. 07.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Typical Cross Section L&T 028 dt. 07.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Approved (LEC 158 dt. 31.01.2017)
Schedules of TCS L&T 028 dt. 07.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Service Road Plan & Profile 9 locations L&T 029 dt. 12.09.2016 - L&T 169 dt. 17.01.2017 LEC 158 dt. 31.01.2017
Joint Detailing
3 Pavement Design Report Main Carriageway L&T 038 dt. 28.09.2016 LEC 117 dt. 12.01.2017 NA NA Approved (LEC 117 dt. 12.01.2017)
Service Road L&T 186 dt. 30.01.2017 Reviewed NA NA Compliance Submitted

4 Major Bridge (1 no.)


Conditional Appoval received subjected
L&T 047 dt. 12.10.2016 to IIT Proof check
L&T 058 dt. 04.11.2016 LEC 97 dt. 02.01.2017 (LEC-97 dt. 02.01.2017)
68+385 L&T 060 dt. 10.11.2016 LEC 250 dt. 15.03.2017 L&T 302 dt. 22.04.2017 Approval Awaited (LEC-250 dt. 15.03.2017)
L&T 097 dt. 01.12.2016 GFC_Proof Checked by IIT drawing
L&T 136 dt. 28.12.2016 submitted on 06.03.2017 & 01.04.2017
GFC approval awaited

L&T 297 dt. 18.04.2017 Justification for Revision in Founding


L&T 314 dt. 11.05.2017 Level Submitted. Approval awaited.
L&T 315 dt. 12.05.2017
Revised GAD of MJB

5 Minor Bridge (7 nos.) 50+374


55+204
56+618 L&T 047 dt. 12.10.2016 LEC 181 dt. 11.02.2017 L&T 288 dt. 13.04.2017 LEC 408 dt.20.06.2017 Approved (LEC 408 dt.20.06.2017)
85+839
58+531

50+615 L&T 058 dt. 04.11.2016 Approval Awaited Approval Awaited


L&T 061 dt. 10.11.2016 LEC 200 dt. 22.02.2017 L&T 301 dt. 22.04.2017
L&T 099 dt. 01.12.2016
69+153 L&T 137 dt. 28.12.2016 LEC 408 dt.20.06.2017 Approved (LEC 408 dt.20.06.2017)

6 VUP (5 nos.) COS Proposal has been reviewed by AE


L&T 230 dt. 06.03.2017 LEC 332 dt. 24.04.17
49+879 LEC 167 dt. 06.02.2017 L&T 280 dt. 07.04.2017 Approval Awaited GFC_Approval Awaited
L&T 328 dt. 23.05.2017

59+793 LEC 167 dt. 06.02.2017 L&T 230 dt. 06.03.2017 LEC 264 dt. 19.03.2017 GFC_Approved (LEC 264 dt. 19.03.2017)
L&T 047 dt. 12.10.2016
L&T 071 dt. 14.11.2016 L&T 230 dt. 06.03.2017 GFC_Approval Awaited
67+110 LEC 167 dt. 06.02.2017 Approval Awaited Design issue due to cross road FRL
L&T 300 dt. 22.04.2017 mismatch
L&T 047 dt. 12.10.2016
L&T 071 dt. 14.11.2016
S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks

80+949 - L&T 230 dt. 06.03.2017 LEC 264 dt. 19.03.2017 GFC_Approved (LEC 264 dt. 19.03.2017)
L&T 047 dt. 12.10.2016
L&T 071 dt. 14.11.2016

S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks

84+208 - L&T 230 dt. 06.03.2017 LEC 264 dt. 19.03.2017 GFC_Approved (LEC 264 dt. 19.03.2017)

7 PUP (5 nos.) 54+309 LEC 265 dt. 19.03.2017


57+156 LEC 265 dt. 19.03.2017
65+066 L&T 047 dt. 12.10.2016 LEC 167 dt. 06.02.2017 L&T 231 dt. 06.03.2017 LEC 265 dt. 19.03.2017 GFC_Approved (LEC 265 dt. 19.03.2017)
75+390 LEC 265 dt. 19.03.2017
87+274 LEC 265 dt. 19.03.2017

8 Box Culvert (22 nos.) L&T 041 dt. 29.09.2016


18 Nos. L&T 058 dt. 04.11.2016 LEC 166 dt. 06.02.2017 L&T 229 dt. 06.03.2017 LEC 266 dt. 19.03.2017 GFC_Approved (LEC 266 dt. 19.03.2017)
L&T 098 dt. 01.12.2016
50+422
53+427 COS_Approval Received from Irrigation
L&T 143 dt. 05.03.2017 LEC 272 dt. 21.03.2017 - - deptt.
59+945
65+000

79+556 & 77+715 Reconstruction of Half Side

9 Pipe Culverts (54 nos.)


L&T 031 dt. 19.09.2016
52 nos. L&T 034 dt. 21.09.2016 LEC 036 dt. 21.11.2016 L&T 216 dt. 25.02.2017 LEC 270 dt. 20.03.2017 GFC_Approved 52 nos.
L&T 058 dt. 04.11.2016 (LEC 270 dt. 20.03.2017)

55+636 COS_Approval Received from Irrigation


L&T 143 dt. 05.03.2017 LEC 272 dt. 21.03.2017 - -
57+534 deptt.

10 Major Junction (5 nos.) Submitted L&T 128 dt. 21.12.2016 - - - Comments received on 11.05.2017.
Compliance Submitted on 30.05.2017

11 Minor Junction (30 nos.) Submitted L&T 273 dt. 28.03.2017 - - - Review and Approval Awaited

12 Drainage Plan & Profile Earthen Drain L&T 127 dt. 21.12.2016 Compliance pending
Median Drain L&T 127 dt. 21.12.2016 - L&T 274 dt. 28.03.2017 LEC 312 dt. 05.04.2017 GFC_Approved (LEC 312 dt.05.04.2017)
Left and Right Box
Drain L&T 127 dt. 21.12.2016 - L&T 274 dt. 28.03.2017 LEC 312 dt. 05.04.2017 GFC_Approved (LEC 312 dt.05.04.2017)

13 RE Wall_Panel Design and Drawings


Superseded
9 locations L&T 245 dt. 09.03.2017 - - -

L&T 329 dt. 24.05.2017 Approval Awaited


S.N. Description Chainage Date of Initial Submission Date of Initial Approval Date of GFC Submission Date of GFC Approval Remarks

RE Wall Drawings RE wall dwg for PUP Approval Awaited


@ch. 57+156
RE Wall Drawings RE wall dwg for PUP only soft copy received
@ch. 65+066

14 Truck Lay bye Approval Awaited


Bus Bay & Bus Shelter L&T 307 dt. 03.05.2017
Landscaping Detail

15 Utility Shifting DPR


16 Land Obstruction

17 Correspondances related to Design


18 Detail Project Report Feasibility Study

Das könnte Ihnen auch gefallen