GBT Erection

Site Information
Sap Id I-WB-SWPN-ENB-9031

Candidate Id C1

Form No R4G-70-CQM-FMT-PR-016

Site Name SWPN-9031

Subrata 20khan 20Vill 20Swarupnagar 20. 20PO 20Bangalani 20ps 20Swarupnagar


Site Location 20 20Dist 20 3A 2024 20pgs 28N 29pin 743286Mob
9735383474,SWARUPNAGAR,West Bengal

City SWARUPNAGAR

Latitude 22.808995

Longitude 88.838604

R4G State West Bengal

Contractor Sree Krishna

Date 29 April 2019

Reliance Jio Infocomm Limited Page 1


Inspection Report- GBT Erection

Sr.No. Description Specifications Observations Remarks

Materials

SIRA-XX-XXXX-XXXX-
1.1 IFC Drawing No and Rev
12B

All members are as per


1.2 Tower Members Ok
drawing. No damages

Grade & Material Make as


1.3 Fasteners per specification in Ok
Drawings
Material Make as per
Lightening Arrestor and Aviation
1.4 specification and Drawings Ok
Lamp

Top level of CIP Flange of all


1.5.1 All in same level 150
pedestals P1

Top level of CIP Flange of all


1.5.2 All in same level 150
pedestals P2

Top level of CIP Flange of all


1.5.3 All in same level 150
pedestals P3

Tower Members

2.1 Fixing of all members As per drawing Ok

2.2 Swapped members (if any) Not allowed Ok

2.3 Rusted Members if any Not allowed Ok

2.4 Bolts, nuts & washers at all joint As per drawing Ok

Reliance Jio Infocomm Limited Page 2


Is Leg flange gaps > 5mm (for
2.5 < 5 mm As per spec
tubular tower)

Mention Grade as per


2.6 Grade of bolts As per spec
drawing

2.7 Is there any Lower size bolts Not Allowed Ok

Any Welding / Gas cutting /


2.8 Gas cutting not allowed Ok
Enlarged holes observed

Any short length bracing members


2.9 Not Allowed Ok

Check 10% of total nuts at


2.10 Tightening of nuts Ok
all main joints

Tack Welding/Thread Damaging at


bottom flange Nut Bolt with non- To be ensure at all
2.11 Ok
corrosion treatment (Zinc Spray) foundation legs

Ladder And Cable Ladder

3.1 Any twisting / bending Not Allowed Ok

Bottom part grouted with concrete


3.2 As per drawing Ok

Arrangement of climbing & cable


3.3 As per drawing Ok
ladder

3.4 Safety guard ribs properly fixed As per drawing Ok

Bolts, nuts, washers & washers at


3.5 As per drawing Ok
all joints

Write missing members if


3.6 Missing members Ok
any

Resting Platform / Working Platform

Reliance Jio Infocomm Limited Page 3


Is platforms fixed as per drawing /
4.1 As per drawing Ok
location

4.2 No of platforms Ok

4.3 Heights Ok

Protection railing members


4.4 As per drawing Ok
(Wherever Applicable)

Bolts, nuts, washers & washers at


4.5 As per drawing Ok
all joints

Write missing members if


4.6 Missing members Ok
any

Platform Details1

Bolt composition 1 bolt+ 1 Nut + 1


Same Specification as
5.1 spring washer + 1 Plain washer As per spec
Fasteners

Continuous welding on Joints with Same Specification as


5.2 As per spec
minimum fillet size 6mm Fasteners

Projected portion of bolt beyond nut Same Specification as


5.3 As per spec
between 3 to 8mm Fasteners

Fasteners Property
5.4 Fasteners class:For category 5.6 As per spec
(Size,Torque)(M12,35 N-
m),(M16,80 N-
m),(M20,160 N-
m),(M24,280 N-m) AND
For category 8.8
(Size,Torque)(M12,80 N-
m),(M16,215 N-
m),(M20,420 N-
m),(M24,730 N-m)

Platform Details2

Height of Tower(in M)
6.1 Verticality of GBT /1000 or +/- 25 mm As per spec
whichever is less( As Per
IS 12843)

Reliance Jio Infocomm Limited Page 4


Antenna Mounts

Is mounts fixed as per drawing /


7.1 As per drawing Ok
location

7.2 No of Antenna Mounts Ok

7.3 Heights Ok

Painting (Wherever Applicable)

8.1 Proper quality (visual check) Ok

8.2 Is there any peeling off Peel Off Not allowed Ok

Galvanization

9.1 Galvanization ok

Tower base c / c, diagonals and


9.2 Ok
level using water level

Observations and Comments:

yes

Reliance Jio Infocomm Limited Page 5


CFQ details

Contractor’s representative Field Engineer QC Engineer

Signature

Name Mr Arindan Ramkrishna Maity

Date 30 April 2019 30 April 2019 --