Detail Project Report

“NARUA GARUA GHURVA BADI”


Programe
Mahatma Gandhi National Rural Employment Guarantee Act
FY 2019 – 20

Gram : Gamhariya
Gram Panchyat : Gamhariya
Janpad Panchayat : Ramchandrapur
District : Balarampur-Ramnujganj

Submitted to :Zilla Panchayat CheifExcutive Officer,Balarampur-Ramanujaganj


Prepared by :ZP
Table of Contents

1.1 BASIC INFORMATION OF GRAM PANCHAYAT/VILLAGE 3


1.2 MGNREGA STATUS OF GP BELSAR ERROR! BOOKMARK NOT DEFINED.
1.3 CURRENT CLIMATE VULNERABILITY 5
1.4 SETTING OF GP IN THE LANDSCAPE 5
1.5 BIO-PHYSICAL ASPECTS OF BELSARLANDSCAPE 6

CHAPTER: 2 10

“SELECTION OF NGGB WORKS” 10


2.1 PROBLEM STATEMENT 10
2.2 PRIORITISATION OF OPTIONS 10
2.3 TYPE OF WORKS: 10

CHAPTER: 3 13

“NGGB INFRASTRUCTURE DESIGN DOCUMENT” 13


3.1 NGGB WORK 1 13
3.1.1 TECHNICAL REPORT 13
3.1.2 SITE PHOTOGRAPHS OF POND 13
3.2 NGGB WORK 2 15
3.2.1 TECHNICAL REPORT 15
3.3 NGGB WORK 3 15
3.3.1 TECHNICAL REPORT OF CRW 3 15
3.4 NGGB WORK 16
3.4.1 TECHNICAL REPORT 16
3.5 NGGB WORK 16
3.5.1 TECHNICAL REPORT 17
3.6 NGGB WORK 17
3.6.1 TECHNICAL REPORT 17
3.7 NGGB WORK 18
3.7.1 TECHNICAL REPORT 18

CHAPTER: 4 21
Total Consolidated Cost
Chapter: 1
“Introduction”
1.1 Basic Information of Gram Panchayat/Village
Name of District Balarampur-Ramnujganj
Name of Block Ramchandrapur
Panchayat Gamhariya
Village Gamhariya
No. of Active Job Card Holders 402
LB budget of last 3 Years 142Lakh
Total Geographical Area,km2 596.533 hect.
Major Soil type Red and black Soil
Total HH 413
SC HH 35
ST HH 217
PVTGs (FRA beneficiaries HHs) 6
BPL HHor(Others) 132
Women Headed Households 28
Differently Able HH 0
Major Livelihood Options Agriculture and allied
Types of Works under MGNREGA in Last Open well, Dabri/Talab, Land development
3 Years (land leveling/Farm bund), Rural
connectivity, Water Conservation
,SBM,PMAY
Average Annual Rainfall, mm 1608 (1518mm Seasonal)
Total Agriculture Land, 333.037 hect
Forest land (Type, Ha) 0
Irrigated Area, Ha 35.446 (10.64 %)hect.
Drainage Pattern Kerakachcharnala,Futfutinala
Major Crops Paddy, Wheat, Maize

Name of Crop Paddy Niger Wheat


Season Kharif Late Kharif Rabi
Productivity (Q/Ha) 37 1.7 13
State : CHHATTISGARH District : BALRAMPUR Block : RAMCHANDRAPUR Panchayat : Gamhariya

State : CHHATTISGARH District : BALRAMPUR Block : As on 04-04-


RAMCHANDRAPUR Panchayat : Gamhariya 2019

I Job Card

Total No. of JobCards issued 402

Total No. of Workers 736

Total No. of Active Job Cards 372

Total No. of Active Workers 701

(i)SC worker against active workers[%] 18.97

(ii)ST worker against active workers[%] 45.51


FY 2019- FY 2018-
II Progress 2020 2019 FY 2017-2018 FY 2016-2017 FY 2015-2016

Approved Labour Budget 0 0 0 0 0


Persondays Generated so far 0 28,740 39,928 21,765 7,965
% of Total LB 0 0 0 0 0
% as per Proportionate LB 0

SC persondays % as of total persondays 0 16.44 18.57 27.19 14.78

ST persondays % as of total persondays 0 44.73 48.94 55.94 72.13


Women Persondays out of Total (%) 0 43.8 44.71 46.17 45.32

Average days of employment provided per


Household 0 83.3 115.73 87.06 42.82

Average Wage rate per day per person(Rs.) 0 173.84 171.61 166.32 157.64

Total No of HHs completed 100 Days of Wage


Employment 0 132 233 105 11

Total Households Worked 0 345 345 250 186

Total Individuals Worked 0 636 660 519 357

Differently abled persons worked 0 1 0 0 0


III Works

Number of GPs with NIL exp 0 0 0 0 0

Total No. of Works Takenup (New+Spill Over) 39 98 100 71 29

Number of Ongoing Works 39 39 54 66 20

Number of Completed Works 0 59 46 5 9

% of NRM Expenditure(Public + Individual) NaN 89.86 71.17 71.27 100

% of Category B Works 92 75.51 47 18.31 10.34


IV Financial Progress

Total Exp(Rs. in Lakhs.) 1 57.62 91.5 35.93 14.91


Wages(Rs. In Lakhs) 1 47.51 75.21 35.93 5.75
Material and skilled Wages(Rs. In Lakhs) 0 10.1 16.15 0 9.16
Material(%) 0 17.54 17.68 0 61.45

Total Adm Expenditure (Rs. in Lakhs.) 0 0 0.14 0 0


Admin Exp(%) 0 0 0.15 0 0

Average Cost Per Day Per Person(In Rs.) 0 201.53 176.95 166.32 157.64

% of Total Expenditure through EFMS # 100 100 100 100

% payments gererated within 15 days 0 96.3 94.94 38.39 1.29

1.2 Current Climate vulnerability

In last 5
Drought Dry spell Frost Flood Any other-
Years
2018
2017
2016
2015
2014
Source –Focused Group Discussion Conducted at Village
Level)

1.3 Setting of GP in the Landscape


1.5 Bio-Physical Aspects of GAMHARIYA Landscape

Figure 2: Erosion data for Gamhariya Panchayat

1. Observation – Gamhariya Panchayat witness sheet erosion. Maximum sheet erosion is evident in
southern, central and eastern part of the gram panchayat.
Figure 3: Wasteland area of Gram Panchayat Gamhariya

2. Observation – Gamhariya wasteland is careterized primarily as degaraded forest land that is


evident in the central part of the Gram Panchayat

Figure 4: Land use Pattern of Gram Panchayat Gamhariya

Observation-Majority of land is under forest cover and crop land. Forest cover is prominent in the
northen part of GP and Cultivaable areas are primarily in the southern part of the GP.
Figure 5: Lineament of GP Gamhariya

Observation-Structural lineament, joints and fratures are visible cuuting across the GP from North
and South east part of the GP.

Figure 6: Ground water prospects of Gram Panchayat Gamhariya

3. Observation – Gamhariya GP has primarily three different ground water prospects. In the
northen part of GP the ground water prospect is greater than 80m deep with 20-30 LPM yeild. In
the eastern and western part, the ground water prospect is less than 30m deep with yeild between
50-100 LMP. In the central part, there is no yeild.
Figure 7: Satellite Image of Gamhariya Gram Panchayat’s NGGB proposed site.
Chapter: 2
“Selection of NGGB Works”

2.1 Problem Statement


In selection of the NGGB Works:-
 To protect crops by grazing of animal on the field/farms.
 To provide better shelter, medical facilities and Breeding.
GP and JP level MGNREGA identified problems forBelsar Gram Panchayat are as -

1. To protect crops is one of the major concerns


2. Better ShelterGram Panchayat has less than 6 percent of animals has better shelter to
protect them from sun, rain and dust.
3. Medical Facilities – To give better Treatment From sickness and birth realted issues.
4. Lack of proper management of animal waste.

2.2 Prioritisation of Options

 Conserve area for Gothan and GOCHAR.

 Proper protective boundries.

 Proper Road for rainy sesons.

 Proper grazing area and supplementary KOTNA

 Clean and neat water and water tank for animals.

 Porper management of animal’s waste using wormy compost and nadep tank.

 Urine collection chambers.

2.3Type of Works:
(also mentioned in Satalite images with color indications.)

NGGB works:-
1. Construction of WRT (Water Resource Trench)
2. Construction of CPT in
3. Construction of Fencing in
4. Construction of ROAD in
5. Construction of Water Tank
6. Construction of Kotna
7. Construction of CHABUTARA
8. Construction of SICK ANIMAL SHED
9. Construction of WORK SHED for SHG
10. Construction of SOAK PIT
11. Construction of URIN COLLECTION CHAMBER
12. Construction of GATE
13. Construction of ANIMAL SHADE

Figure 9:-.NGGB Work

Based on the site specifications, following integrated structures have been proposed through
participatory planning exercise.
District-Balarampur-
Village-Belsar Gram Panchayat- Belsar Janpad-Shankargarh Ramanujaganj
Sl No Name of work Dimension
1 WRT 436mX1.5mX1.2
2 CPT 436mX1.5mX1.2
3 Irrigation Well Radius 4m
4 Dabari 31mX32mX2.55m
5 Kotna 10mX2mX0.3m
7.5mX1.5mX0.3m
6 Water Tank
CHABUTARA
7 20mX10m
SICK ANIMAL SHED
8 6mX7.5m
WORK SHED for SHG
9 4.5mX3m
SOAK PIT
10
URIN COLLECTION CHAMBER
11
GATE
12
ANIMAL SHADE
13
Chapter: 3
“NGGB Infrastructure Design Document”

3.1 NGGB Work 1


Code:Pond

3.1.1 Technical Report


1. Name of Proposed Work : Pond
2. Name of Village :Gamhariya
3. Name of Gram Panchayat :Gamhariya
4. Name of Block :Ramchandrapur
5. Unit of work :6
6. Purpose of proposed work :Nistar
7. Estimated period of work completion:2 months
8. Details of Proposed work (as per estimates):
9. Households benefited

3.1.2 Site Photographs of Pond


3.2 NGGB Work 2
Code: WRT

3.2.1 Technical Report


1. Name of Proposed Work : WRT
2. Name of Village :Gamhariya
3. Name of Gram Panchayat : Gamhariya
4. Name of Block :Ramchandrapur
5. Unit of work : ONE
6. Purpose of proposed work : Ground water recharge
7. Estimated period of work completion:1 months

Image of Proposed work-

Figure Site for Check Dam

3.3 NGGB Work3


Code: CPT

3.3.1 Technical Report of CRW 3


1. Name of Proposed Work : CPT
2. Name of Village :Gamhariya
3. Name of Gram Panchayat :Gamhariya
4. Name of Block :Ramchandrapur
5. Unit of work : One
6. Purpose of proposed work :Boundary
7. Estimated period of work completion:1months

Image of Proposed work-


3.4 NGGB Work
Code: Boundary

3.4.1 Technical Report


1. Name of Proposed Work : Boundary
4. Name of Village : Gamhariya
5. Name of Gram Panchayat : Gamhariya
2. Name of Block :Ramchandrapur
3. Unit of work : One
4. Purpose of proposed work :Boundary
5. Estimated period of work completion:1months

3.4.2 Images of Proposed work-

3.5 NGGB Work


Code: KOTANA
3.5.1 Technical Report
1. Name of Proposed Work : Kotna
6. Name of Village : Gamhariya
7. Name of Gram Panchayat : Gamhariya
2. Name of Block :Ramchandrapur
3. Unit of work : One
4. Purpose of proposed work :Food Chamber
5. Estimated period of work completion:6 days

3.5.2 Images of Proposed work-

3.6 NGGB Work


Code: Water Tank

3.6.1 Technical Report


1. Name of Proposed Work : Kotna
8. Name of Village : Gamhariya
9. Name of Gram Panchayat : Gamhariya
2. Name of Block :Ramchandrapur
3. Unit of work : One
4. Purpose of proposed work :Food Chamber
5. Estimated period of work completion:6 days

3.5.2 Images of Proposed work-


3.7 NGGB Work
Code: Road

3.7.1 Technical Report


10. Name of Proposed Work : Road
11. Name of Village :Gamhariya
12. Name of Gram Panchayat : Gamhariya
13. Name of Block :Ramchandrapur
14. Unit of work : One
15. Purpose of proposed work :Food Chamber
16. Estimated period of work completion:6 days

3.7.2 Images of Proposed work-


Chapter:4
Total Consolidated Cost

SN NAME OF WORK QUANTITY TOTAL COST LABOUR MATERIAL


1 CPT 6 0.677 0.661 0.0160
2 WRT 1 0.629 0.615 0.0140
3 ROAD 1 1.115 0.267 0.8480
4 CHABUTARA 3 3.723 1.183 2.5400
5 WATER TANK 3 0.399 0.304 0.0950
6 SICK ANIMAL SHED 1 1.911 0.131 1.7800
7 KOTNA 1 0.184 0.057 0.1270
8 SHG SHED 1 0.95 0.08 0.8700
9 SOAK PIT 2 1.267 0.211 1.0560
10 URIN COLLECTION 9 0.173 0.045 0.1280
11 GATE 1 0.33 0.03 0.3000
12 ANIMAL SHEDE 4 7.645 0.524 7.1210

TOTAL(INLAKH) 19.003 4.108 14.895

THANKS