3. a. What is the function of spill way? How will you design 5
an ogee spillway?
b. Discuus about the cavitaion and erosion phenomenon in 5
spillway.
5
c. Describe various types of turbine used in hydropower
project?
4. a. A pelton wheel has to be designed for the following data. 8
Power to be developed = 6.MW
Net rated head= 300 m
Rated speed= 550 rpm
Ratio of jet diameter to the wheel diameter= 0.1
Overall efficiency= 90%
Assume Cv=0.98 and Cu=0.46.
b. Starting from the historical development of hydropower 7
in Nepal explain the potential in terms of gross, economical and
technical.
5. a. Describe in brief the issues that should be covered by 4
micro hydropower plant.
b. Mean monthly flow of a river in a typical year are as 11
follows.
Month Jan Feb Mar. Apr. May June July