Page 1 -DATA
SNo. Constant Unit Description
100.00 cft. Add for contingencies like bailing out water etc.,
Total
Rate = Rs.
Rs. 891 Cum. Rate = Rs.
2. FILLING WORKS
Total
Rate = Rs.
Rs. 212 Cum. Rate = Rs.
Total
Rate = Rs.
Rs. 636 Cum. Rate = Rs.
3. TRANSPORTING
Page 2 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Total
Rate = Rs.
Total
Rate = Rs.
Rs. 583 Cum. Rate = Rs.
Total
Rate = Rs.
Rs. 3613 Cum. Rate = Rs.
Page 3 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 491 sqm Rate = Rs.
Total
Rate = Rs.
Rs. 3585 Cum. Rate = Rs.
Total
Rate = Rs.
Rs. 3834 Cum. Rate = Rs.
Page 4 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Ground Floor
01 Column footing
Total
Rate = Rs.
Rs. 6744 Cum. Rate = Rs.
02 Plinth beams
Total
Rate = Rs.
Rs. 6813 Cum. Rate = Rs.
Ground Floor
03 Columns/Roof beam/Lintel beam/slab
Page 5 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 6495 Cum. Rate = Rs.
Sunshade
Rate = Rs.
Rate = Rs.
6.D.DESIGN MIX(M20)
RMC
Labour
Total
7. BRICK WORK
Page 6 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 4927 Cum. Rate = Rs.
Total
Rate = Rs.
Rs. 718 Sqm. Rate = Rs.
Rate = Rs.
Rs. 27 Sqm. Rate = Rs.
9. PLASTERING ITEMS
Ground Floor
Total
Rate = Rs.
Rs. 204 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 187 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 210 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 221 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 231 Sqm. Rate = Rs.
Rate = Rs.
Rs. 5 Sqm. Rate = Rs.
Page 9 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 797 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 205 Sqm. Rate = Rs.
Rate = Rs.
Rs. 551 Sqm. Rate = Rs.
Page 10 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 241 Sqm. Rate = Rs.
Rate = Rs.
Rs. 215 Rmt. Rate = Rs.
Total
Rate = Rs.
Rs. 282 Rmt. Rate = Rs.
Page 11 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 69 Rmt. Rate = Rs.
Total
Rate = Rs.
Rs. 82 Rmt Rate = Rs.
Total
Page 12 -DATA
SNo. Constant Unit Description
Rate = Rs.
Rs. 115 Rmt Rate = Rs.
07 Fiiling the sunken portions with cement surkhi concrete 1:5:10 mix.
- Rate for 100 cft.
Total
Rate = Rs.
Rs. 3875 Cum. Rate = Rs.
Total
Rate = Rs.
Rs. 876 Sqm. Rate = Rs.
Page 13 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 76 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 45 Each
Total
Rate = Rs.
Rs. 325 Rmt Rate = Rs.
Total
Rate = Rs.
Rs. 401 Rmt Rate = Rs.
Page 14 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 578 Rmt Rate = Rs.
Total
Rs. 35 Each Rate = Rs.
B. Tor Steel
1.00 MT. Cost of steel
0.01 MT. Binding wire
1.00 MT. Labour charges at all levels.
Total
63650.0 MT Rate = Rs.
Page 15 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 298 Sqm. Rate = Rs.
Rate = Rs.
Rs. 491 Sqm. Rate = Rs.
Rate = Rs.
Rs. 22 Sqm. Rate = Rs.
Page 16 -DATA
SNo. Constant Unit Description
Total
Rate = Rs.
Rs. 342 Sqm. Rate = Rs.
B. Incl. Vaccum dewatering Process
Rate = Rs.
Rs. 401 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 996 Sqm. Rate = Rs.
SKIRTING
01 Supplying and Laying of ceramic tile for Skirting in
CM 1:4, 20 mm thick, 75 - 100 mm height - Rate for
36.00 sft. 100
CostRft.
of ceramic tile
3.00 Cft River sand
0.60 bag Cement
100.00 rft Average Lift Charges
100.00 rft Labour charges for fixing & finishing incl. Helper
Total
Page 17 -DATA
SNo. Constant Unit Description
Rate = Rs.
Rs. 128 Rmt Rate = Rs.
WALL TILES
02 Supplying and Laying of Glazed tiles for Dadoing in
CM 1:4, 20 mm thick - Rate for 100 sft.
105.00 sft. Cost of Glazed tile (200 mm x 300 mm)
8.53 cft River sand
1.80 bag Cement
100.00 sft. Labour charges for laying incl. Helper
100.00 sft. Average Lift Charges
100.00 sft. Misc. materials
Total
Rate = Rs.
Rs. 1012 Sqm. Rate = Rs.
TABLE TOP
01 Laying of granite slab for table top in CM 1:4, 20
mm thick - Rate for 100 sft.
115.00 sft. Cost of granite slab
8.53 cft River sand
1.80 bag Cement
100.00 sft. Labour charges for laying & polishing, incl. Helper
100.00 sft. Average Lift Charges
100.00 sft. White cement
charges for making holes for wash basin, nosing &
50.00 sft. Edge polishing
Total
Rate = Rs.
Rs. 2148 Sqm. Rate = Rs.
Total
Rate = Rs.
Rs. 14 Sqm Rate = Rs.
Total
Rate = Rs.
Rs. 45 Sqm Rate = Rs.
Total
Rate = Rs.
Rs. 41 Sqm Rate = Rs.
Page 19 -DATA
ULE ITEMS
K ITEMS
5 Cft. 500.00
1.00 Cft. 100.00
600.00
6 /cft.
212 /cum.
1.75 /cft.
62 /cum.
590.00
5.90 /cft.
208 /cum.
1.75 /cft.
62 /cum.
Page 20 -DATA
Rate Per Amount
2520.00
25.20 /cft.
890 /cum.
2.50 /cft.
88 /cum.
ORKS
600.00
6 /cft.
212 /cum.
1800.00
18 /cft.
636 /cum.
RTING
ad of 500m
1.10 Cft 110.00
0.65 Cft 65.00
175.00
Page 21 -DATA
Rate Per Amount
175.00
1.75 /cft.
61.81 /cum.
500.00
500.00
5.00 /cft.
176.60 /cum.
1650.00
17 /cft.
583 /cum.
NCRETE - PCC
10228.50
102 /cft.
3613 /cum.
Page 22 -DATA
Rate Per Amount
4560.51
46 /sft
491 /sqm.
ASONRY
10150.00
102 /cft.
3585 /cum.
10854.50
109 /cft.
3834 /cum.
Page 23 -DATA
Rate Per Amount
5:3 Mix
16292.50
162.93 /cft.
19092.50
191 /cft.
6743 /cum.
19292.50
193 /cft.
6812 /cum.
Page 24 -DATA
Rate Per Amount
18392.50
184 /cft.
6494 /cum.
3.00 /cft.
106 /cum.
2.5 /sft.
26.9 /sqm.
X(M20)
6.4
3500.00 / Cum
900.00 / Cum
4400.00 Cum
ORK
Page 25 -DATA
Rate Per Amount
13947.50
139 /cft.
4926 /cum.
3 /cft.
105.93 /cum.
6666.00
67 /sft.
717 /sqm.
2.5 /sft.
26.9 /sqm.
G ITEMS
Page 26 -DATA
Rate Per Amount
1892.50
19 /sft.
204 /sqm.
1737.50
17 /sft.
187 /sqm.
1947.50
19 /sft.
210 /sqm.
Page 27 -DATA
Rate Per Amount
2047.50
20 /sft.
220 /sqm.
2142.50
21 /sft.
231 /sqm.
/sft.
5 /sqm.
Page 28 -DATA
Rate Per Amount
7406.44
-
74 /sft.
797 /sqm.
ITEMS
1901.50
19 /Sft.
205 /Sqm.
5116.35
51 /sft.
551 /sqm.
Page 29 -DATA
Rate Per Amount
2232.30
22 /sft.
240 /sqm.
6534.00
65 /Rft.
214 /Rmt.
8581.50
86 /Rft.
281 /Rmt.
Page 30 -DATA
Rate Per Amount
2075.00
21 /Rft.
68 /Rmt.
2483.00
25 /rft.
81 /rmt.
3502.00
Page 31 -DATA
Rate Per Amount
35 /rft.
115 /rmt.
10968.50
110 /cft.
3874 /cum.
2644.52
81 /Sft.
876 /sqm.
Page 32 -DATA
Rate Per Amount
700.00
7 /sft
75 /sqm.
45.00
45 /No.
75 Rft 7500
12 Rft 1200
3 Rft 300
9 Rft 900
9900.00
99 /rft
325 /rm.
90 Rft 9000
18 Rft 1800
3 Rft 300
11 Rft 1100
12200.00
122 /rft
400 /rm.
Page 33 -DATA
Rate Per Amount
3 Rft 300
18 Rft 1800
17600.00
176 /rft
577 /rm.
15 each 15
15 each 15
5 each 5
35.00
35 /Each
ENT STEEL
63650.00
63650.00
63650 /MT
Page 34 -DATA
Rate Per Amount
2764.20
28 /sft.
297 /sqm.
4560.50
46 /sft.
491 /sqm.
2 /sft.
21.52 /sqm.
ITEMS
Page 35 -DATA
Rate Per Amount
3170.83
32 /sft.
341 /sqm.
3720.83
37 /sft.
400 /sqm.
9253.85
93 /sft.
996 /sqm.
3885.00
Page 36 -DATA
Rate Per Amount
39 /rft.
127 /Rmt.
ES
9403.85
94 /sft.
1012 /sqm.
OP
19953.85
200 /sft.
2147 /sqm.
ITEMS
20.00 Kg 50.00
0.50 sft 50.00
Page 37 -DATA
Rate Per Amount
125.00
1.25 sft
13.45 /Sqm.
55.00 kg 178.75
0.75 sft 75.00
28.00 kg 50.40
0.75 sft 75.00
0.35 sft 35.00
414.15
4.14 sft
44.56 /Sqm.
374.80
3.75 sft
40.33 /Sqm.
Page 38 -DATA
PRESENT RATES FOR THE CIVIL WORKS (with Cement & Reinforceme
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES
2. FILLING WORKS
1 Labour charges for filling with avaiable earth 212.00 Cum
2 Refilling the trenches & basement with imported earth 636.00 Cum
4.TRANSPORTING
Transporting the excess earth
a) Within the site premises up to initial lead of 500m 62.00 Cum
b)-do- for each additional lead of 500m. 40.00 Cum
c) - do- for transporting the earth to places of dump outside the 177.00 Cum
RATES-Page 39 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES
7. BRICK WORK
1 Brick work in CM 1:6, 9" thick. 4927.00 Cum
Lift charges for each floor 106.00 Cum
2 Brick partition in CM 1:4, 4.5" thick. 718.00 Sqm
Lift charges for each floor 27.00 Sqm
9. PLASTERING ITEMS
1 Ceiling plastering CM 1:3, 15 mm thick. 204.00 Sqm
2 Wall plastering CM 1:5, 15 mm thick. 187.00 Sqm
3 Plastering CM 1:4, 20mm thick, for stone masonry. 210.00 Sqm
4 Plastering CM 1:3, 20mm thick, WPC. 221.00 Sqm
RATES-Page 40 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES
5 Wall plastering in CM 1:3, 15mm thick (Average) with WPC 231.00 Sqm
6 Lath plastering for 75 mm tick in CM.1: 2: 4 797.00 Sqm
Lift charges for each floor 5.00 Sqm
RATES-Page 41 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES
SKIRTING
1 Supplying and Laying of ceramic tile for Skirting
128.00 Rmt
DADOING
2 Supplying and Laying of Glazed tiles for Dadoing 1012.00 Sqm
TABLE TOP
1 Laying of granite slab for table top 2148.00 Sqm
RATES-Page 42 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES
RATES-Page 43 of 49
with Cement & Reinforcement steel)
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0% 20% 6.08%
0.00
0.00 42.40 12.89 267 Cum
0.00 127.20 38.67 802 Cum
0.00
0.00 722.60 219.67 4555 Cum
0.00 98.20 29.85 619 sqm
0.00
RATES-Page 44 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0
0.00
0
0.00 1348.80 410.04 8503 Cum
0.00 1362.60 414.23 8590 Cum
0.00 1299.00 394.90 8189 Cum
0.00 1299.00 394.90 8189 Cum
0.00 1299.00 394.90 8189 Cum
0.00 1299.00 394.90 8189 Cum
0.00 97.43 29.62 614 Sqm
0
0.00
0.00 985.40 299.56 6212 Cum
0.00 21.20 6.44 134 Cum
0.00 143.60 43.65 905 Sqm
0.00 5.40 1.64 34 Sqm
0.00
0.00 40.80 12.40 257 Sqm
0.00 37.40 11.37 236 Sqm
0.00 42.00 12.77 265 Sqm
0.00 44.20 13.44 279 Sqm
RATES-Page 45 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0.00 46.20 14.04 291 Sqm
0.00 159.40 48.46 1005 Sqm
0.00 1.00 0.30 6 Sqm
0
0.00
0.00 41.00 12.46 258 Sqm
0.00 110.20 33.50 695 Sqm
0.00 48.20 14.65 304 Sqm
0.00 0.00 0.00 0
0.00 43.00 13.07 271 Rmt
0.00 56.40 17.15 356 Rmt
0.00 13.80 4.20 87 Rmt
0.00 16.40 4.99 103 Rmt
0.00 23.00 6.99 145 Rmt
0.00 775.00 235.60 4886 Cum.
0.00 175.20 53.26 1104 Sqm.
0.00 15.20 4.62 96 Sqm.
0.00 9.00 2.74 57 No
0.00 65.00 19.76 410 Rmt
0.00 80.20 24.38 506 Rmt
0.00 115.60 35.14 729 Rmt
0.00 7.00 2.13 44 No
0
0.00
3182.50 66833 M.T
0
0.00
0.00 59.60 18.12 376 Sqm
RATES-Page 46 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0.00 98.20 29.85 619 Sqm
0.00 4.30 1.31 27 Sqm
0
0.00
0.00
0
0.00 68.40 20.79 431 Sqm
0.00 80.20 24.38 506 Sqm
0.00 199.20 60.56 1256 Sqm.
0
0.00
0.00 25.60 7.78 161 Rmt
0
0.00
0.00 202.40 61.53 1276 Sqm
0
0.00
0.00 429.60 130.60 2708 Sqm
0
0
0.00 2.80 0.85 18 Sqm
0.00 9.00 2.74 57 Sqm
0.00 8.20 2.49 52 Sqm
0.00
0.00 47.00 14.29 296 Sqm
0.00 56.00 17.02 353 Sqm
0.00 56.00 17.02 353 Sqm
0.00 65.00 19.76 410 Sqm
RATES-Page 47 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0
RATES-Page 48 of 49
BASIC MATERIAL RATE CONSIDERED FOR WORKING OUT THE RATES
Rate in
S.No Description Unit
Rs. P.
Flooring Materials