DATA FOR SCHEDULE ITEMS

SNo. Constant Unit Description

1. EARTH WORK ITEMS

01 Open well excavation upto 6'0" level in all soils


including SDR including dewatering if any and
100.00 Cft. disposed with in for
Labour charges theexcavation
initial lead of 10m - Rate for 100
cft.
100.00 Cft. Disposal

Total
Rate = Rs.
Rs. 212 Cum. Rate = Rs.

Extra for each additional 1.80 m depth


Rate = Rs.
Rs. 62 Cum. Rate = Rs.

1 Earthwork excavation for column pits upto 6'0" level


in all soils including SDR including refilling the sides
100.00 cft. of foundation
Labour & dewatering
charges if any and disposed with in
for excavation
the initial lead of 10m - Rate for 100 cft.
40.00 cft. Refilling charges
60.00 cft. Disposal
100.00 cft. Add for contingencies like bailing out water etc.,

Total
Rate = Rs.
Rs. 209 Cum. Rate = Rs.

1a Extra for each additional 1.80 m depth


Rate = Rs.
Rs. 62 Cum. Rate = Rs.

1 Earthwork excavation for column pits upto 6'0" level


in hard rock by blasting including refilling the sides of
100.00 cft. foundation
Labour charges& dewatering if any and disposed with in
for excavation
the initial lead of 10m - Rate for 100 cft.
40.00 cft. Refilling charges
60.00 cft. Disposal

Page 1 -DATA
SNo. Constant Unit Description

100.00 cft. Add for contingencies like bailing out water etc.,

Total
Rate = Rs.
Rs. 891 Cum. Rate = Rs.

1a Extra for each additional 1.80 m depth


Rate = Rs.
Rs. 88 Cum. Rate = Rs.

2. FILLING WORKS

01 Labour charges for filling with avaiable earth


including levelling and consolidation - Rate for 100
100.00 cft. cft.
Labour Charges for filling & levelling
100.00 cft. Labour Charges for consolidation

Total
Rate = Rs.
Rs. 212 Cum. Rate = Rs.

02 Refilling the trenches & basement with imported


earth including
a. Earth broughtconsolidation
from out side- Rate for 100 cft.

120.00 cft Cost of imported earth


100.00 cft Labour for filling
100.00 cft Labour charges for consolidation

Total
Rate = Rs.
Rs. 636 Cum. Rate = Rs.

3. TRANSPORTING

12 Transporting the excess earth


a) Within the site premises up to initial lead of 500m
100.00 - With in the site premises
100.00 - Labour for loading, unloading and leveling.

Page 2 -DATA
SNo. Constant Unit Description

Total
Rate = Rs.

Rs. 62 Cum. Rate = Rs.

b) Outside the premises


100.00 - Outside the site premises
100.00 - Labour for loading, unloading and leveling.

Total
Rate = Rs.

Rs. 177 Cum. Rate = Rs.

01 Labour charges for filling with well gravel brought


130.0000 cft. from outside - Rate for 100 cft. Cost of gravel
100.00 cft. Labour Charges for filling & levelling
100.00 cft. Labour Charges for consolidation

Total
Rate = Rs.
Rs. 583 Cum. Rate = Rs.

3. PLAIN CEMENT CONCRETE - PCC

1 Foundation base concrete PCC 1:5:10, using 1-1/2"


metal for foundation - Rate for 100 cft.
90.00 cft 1-1/2" metal
58.50 cft River sand
7.34 bag Cement
100.00 cft Machinery Hire charges
100.00 cft Labour charges
100.00 cft Curing charges

Total
Rate = Rs.
Rs. 3613 Cum. Rate = Rs.

Page 3 -DATA
SNo. Constant Unit Description

2 Flooring base concrete PCC 1:4:8, using 1-1/2" metal,


100 mm thick - Rate for 100 sft.
14.85 cft 40mm metal
14.85 cft 20mm metal
19.31 cft River sand
3.01 bags Cement
100.00 sft Machinery Hire charges
100.00 sft Labour charges
100.00 sft Curing charges

Total
Rate = Rs.
Rs. 491 sqm Rate = Rs.

5. SIZE STONE MASONRY

1 Size stone masonry in CM 1:7 for foundation - Rate


for 100 cft.
340.00 nos. Size stone
10.00 nos. Bond stone
39.00 Cft River sand
3.50 bag Cement
100.00 cft Labour charges
100.00 cft Curing charges

Total
Rate = Rs.
Rs. 3585 Cum. Rate = Rs.

2 Size stone masonry in CM 1:6 for basement using


with one side dressing stone - Rate for 100 cft.
100.00 cft Rate as above
0.58 bag Add difference in cost of cement
135.00 nos. Dressing

Total
Rate = Rs.
Rs. 3834 Cum. Rate = Rs.

Page 4 -DATA
SNo. Constant Unit Description

6. A. RCC 1:1.5:3 Mix

01 RCC - 1:1 1/2 :3 Mix M20 excluding centering &


fabrication - Rate for 100 cft.
90.00 cft. 20mm metal
58.50 cft. River sand
27.00 bag Cement
100.00 cft. Machinery Hire charges
100.00 cft. Scaffolding charges
100.00 cft. Curing charges

Total

Rate = Rs.

Ground Floor
01 Column footing

100.00 Cft RC 1:1.5:3


100.00 Cft Labour charges

Total

Rate = Rs.
Rs. 6744 Cum. Rate = Rs.
02 Plinth beams

100.00 cft. RC 1:1.5:3


100.00 cft. Labour charges

Total

Rate = Rs.
Rs. 6813 Cum. Rate = Rs.

Ground Floor
03 Columns/Roof beam/Lintel beam/slab

100.00 cft. RC 1:1.5:3


100.00 cft. Labour charges

Page 5 -DATA
SNo. Constant Unit Description

Total

Rate = Rs.
Rs. 6495 Cum. Rate = Rs.

Lift charges for each floor

Columns, Beam, Lintels, Slab, Walls etc.,


Rate = Rs.
Rate = Rs.

Lift charges for each floor

Sunshade
Rate = Rs.
Rate = Rs.

6.D.DESIGN MIX(M20)

01 RCC - Design mix (M20) excluding centering &


fabrication - Rate /Cum
320 kg of cement for 100 cft.

RMC

Basic cost of concrete

Labour

Total

7. BRICK WORK

1 Brickwork 9" thick & above in CM 1:6, for


superstructure works - Rate for 100 cft.
Ground Floor
1250.00 nos. Brick

Page 6 -DATA
SNo. Constant Unit Description

32.50 Cft River sand


3.40 bag Cement
100.00 Cft Scaffolding charges
100.00 Cft Labour charges
100.00 Cft Curing charges

Total

Rate = Rs.
Rs. 4927 Cum. Rate = Rs.

1a Lift charges for each floor


Rate = Rs.
Rs. 106 Cum. Rate = Rs.

2 Brick partition wall 4-1/2" thick in CM 1:5 including


hoop
Stageiron - Rate
II (FFL for 100 sft.
to 8'0")

470.00 nos. Brick


13.00 cft River sand
1.54 bag Cement
140.00 rft Hoop iron
100.00 sft. Labour charges
100.00 sft. Scaffolding charges
100.00 sft. Curing charges

Total

Rate = Rs.
Rs. 718 Sqm. Rate = Rs.

2a Lift charges for each floor

Rate = Rs.
Rs. 27 Sqm. Rate = Rs.

9. PLASTERING ITEMS

1 Ceiling plastering in CM 1:3, 15mm thick (Average)


both internal & External surfaces - Rate for 100 sft.
Page 7 -DATA
SNo. Constant Unit Description

Ground Floor

6.50 cft River sand


1.25 bag Cement
100.00 Sft Labour charges incl. Hacking
100.00 Sft Scaffolding charges
100.00 Sft Curing charges

Total

Rate = Rs.
Rs. 204 Sqm. Rate = Rs.

2 Wall plastering in CM 1:5,15mm thick (Average) both


internal & External surfaces - Rate for 100 sft.

7.50 cft River sand


1.00 bag Cement
100.00 sft Labour charges
100.00 sft Scaffolding charges
100.00 sft Curing charges

Total

Rate = Rs.
Rs. 187 Sqm. Rate = Rs.

3 Wall plastering in CM 1:4,20mm thick (Average) for


Coursed rubble masonry wall - Rate for 100 sft.
Ground Floor

9.10 Cft River sand


1.47 bag Cement
100.00 sft Labour charges
100.00 sft Scaffolding charges
100.00 sft Curing charges

Total

Rate = Rs.
Rs. 210 Sqm. Rate = Rs.

4 Wall plastering in CM 1:3,20mm thick (Average) with


wpc - Rate for 100 sft.
Page 8 -DATA
SNo. Constant Unit Description

9.10 Cft River sand


1.47 bag Cement
0.25 Lts Cost of WPC
100.00 sft Labour charges
100.00 sft Scaffolding charges
100.00 sft Curing charges

Total

Rate = Rs.
Rs. 221 Sqm. Rate = Rs.

5 Wall plastering in CM 1:3, 15mm thick (Average)


with WPC at all levels- Rate for 100 sft.
6.50 cft River sand
1.25 bag Cement
0.25 Lts Cost of WPC
100.00 sft Labour charges
100.00 sft Scaffolding charges
100.00 sft Avg. lift charges
100.00 sft Curing charges

Total

Rate = Rs.
Rs. 231 Sqm. Rate = Rs.

Lift charges for each floor

Rate = Rs.
Rs. 5 Sqm. Rate = Rs.

06 Lath plastering in CC 1:1.5:3 75mm thick


including both sides plastering with CM 1:3 - Rate for 100 sft.

16.63 cft CC 1:1.5:3


110.00 sft. Chicken mesh
13.00 Cft River sand
1.78 bag Cement
100.00 sft. Labour for lathing,plastering & finishing

Page 9 -DATA
SNo. Constant Unit Description

100.00 sft. Curing & scaffolding charges

Total

Rate = Rs.
Rs. 797 Sqm. Rate = Rs.

10. FINISHING ITEMS

01 DPC in CM 1:3, 20mm thick with WPC - Rate for 100


sft.
9.10 cft River sand
1.96 bag Cement
0.39 lts Approved WPC
100.00 sft. Labour charges
100.00 sft. Curing charges

Total

Rate = Rs.
Rs. 205 Sqm. Rate = Rs.

02 Screeding in CC 1:1.5:3 using 12 mm chips 75 mm


thick with WPC - Rate for 100 sft.
25.00 Cft Chips
14.63 Cft River sand
6.02 bag Cement
1.20 Lts Cost of WPC
100.00 sft. Average Lift charges
100.00 sft. Machinery Hire charges
100.00 sft. Laying & finising
100.00 sft. Curing charges

Rate = Rs.
Rs. 551 Sqm. Rate = Rs.

03 Screeding over sunshade in CM 1:4,


20mm thick with WPC - Rate for 100 sft.

9.10 cft Sand

Page 10 -DATA
SNo. Constant Unit Description

1.47 bag cement


0.29 lit Approved WPC
100.00 sft Scaffolding & curing
100.00 sft Avg. lift charges
100.00 sft Labour charges

Total

Rate = Rs.
Rs. 241 Sqm. Rate = Rs.

04 Brick on edge over sunshade 200mm height


a. including plastering with CM 1:4 - Rate for 100 rft.

270.00 nos. Brick


8.20 cft River sand
2.90 bag Cement
100.00 rft Scaffolding charges
100.00 rft Avg. lift charges
100.00 rft Labour charges
100.00 rft Curing charges

Rate = Rs.
Rs. 215 Rmt. Rate = Rs.

b. Brick on edge over sunshade 300mm height


including plastering with CM 1:4 - Rate for 100 rft.

375.00 nos. Brick


21.00 cft River sand
3.31 bag Cement
100.00 rft Avg. lift charges
100.00 rft Scaffolding charges
100.00 rft Labour charges
100.00 rft Curing charges

Total

Rate = Rs.
Rs. 282 Rmt. Rate = Rs.

Page 11 -DATA
SNo. Constant Unit Description

05 Rain water border 25mm x 12mm using CM 1:3 - Rate


for 100 rft.
100.00 Rft River sand & cement
100.00 Rft Scaffolding charges
100.00 rft Avg. lift charges
100.00 Rft Labour charges
100.00 Rft Curing charges

Total

Rate = Rs.
Rs. 69 Rmt. Rate = Rs.

06 Ornamental border in CM 1:3 -


a. Rate for25
A. Size 100
mmrft.x 25 mm

0.80 cft River sand


0.18 bag Cement
100.00 rft Scaffolding charges
100.00 Rft Avg. lift charges
100.00 rft Labour charges
100.00 rft Curing charges

Total

Rate = Rs.
Rs. 82 Rmt Rate = Rs.

b. Ornamental border in CM 1:3 -


Rate for50
B. Size 100
mmrft.x 50 mm

3.00 cft River sand


0.73 bag Cement
100.00 rft Scaffolding charges
100.00 Rft Avg. lift charges
100.00 rft Labour charges
100.00 rft Curing charges

Total

Page 12 -DATA
SNo. Constant Unit Description

Rate = Rs.
Rs. 115 Rmt Rate = Rs.

07 Fiiling the sunken portions with cement surkhi concrete 1:5:10 mix.
- Rate for 100 cft.

90.00 cft. Brick bats


58.50 cft. River sand
7.34 bag Cement
100.00 cft. Machinery Hire charges
100.00 cft. Labour for laying & finishing
100.00 cft. Average Lift charges
100.00 cft. Curing charges

Total

Rate = Rs.
Rs. 3875 Cum. Rate = Rs.

08 Plinth protection for 1 m wide with PCC 1:5:10, 75 mm


thick,
- Ratetop
forplastering with Sft)
10 Rft.(32.50 CM 1:5, 20 mm thick

23.76 cft. Earth work excavation


10.63 sft. PCC 1:4:8
7.50 cft. Brick work in CM 1:6 mix.
32.50 sft. Grano flooring 25mm tk using cc 1:1.5:3

Total

Rate = Rs.
Rs. 876 Sqm. Rate = Rs.

09 S/F chicken mesh at all levels


Rate for 100 Sft

110.00 sft Cost of chicken mesh


100.00 sft Cost of nails
100.00 sft Labour charges

Page 13 -DATA
SNo. Constant Unit Description

Total

Rate = Rs.
Rs. 76 Sqm. Rate = Rs.

10 Providing & Fixing of GI Spout pipes -40 mm dia. -


Rate for each
1.00 no Cost of pipe
1.00 no Labour charges for making holes & fixing
1.00 no Cost of primer & misc. materials

Total

Rate = Rs.
Rs. 45 Each

11 S/F of PVC pipe incl. All specials 100 mm dia like


100.00 Rft bends,
Cost ofshoes,
pipe clamps, GI gratings etc., -Rate for 100
100.00 Rft rft
Cost of specials
100.00 Rft Average lift charges
100.00 Rft Fixing charges

Total

Rate = Rs.
Rs. 325 Rmt Rate = Rs.

12 S/F of PVC pipe incl. all specials 150 mm dia like


100.00 Rft bends,
Cost ofshoes,
pipe clamps, GI gratings etc., -Rate for 100
100.00 Rft rft
Cost of specials
100.00 Rft Average lift charges
100.00 Rft Fixing charges

Total

Rate = Rs.
Rs. 401 Rmt Rate = Rs.

13 S/F of PVC pipe incl. all specials 200 mm dia like


100.00 Rft bends,
Cost ofshoes,
pipe clamps, GI gratings etc., -Rate for 100
100.00 Rft rft
Cost of specials

Page 14 -DATA
SNo. Constant Unit Description

100.00 Rft Average lift charges


100.00 Rft Fixing charges

Total

Rate = Rs.
Rs. 578 Rmt Rate = Rs.

14 S/F of PVC Spout pipes -40 mm dia. - Rate for each

1.00 no Cost of pipe


1.00 no Labour charges for making holes & fixing
1.00 no Cost of primer & misc. materials

Total
Rs. 35 Each Rate = Rs.

11. REINFORCEMENT STEEL


01 S/F of steel for RCC works
including cost of binding wire- Rate for 1 MT.

B. Tor Steel
1.00 MT. Cost of steel
0.01 MT. Binding wire
1.00 MT. Labour charges at all levels.

Total
63650.0 MT Rate = Rs.

12. WEATHERING COURSE WITH PRESSED TILES

01 Weathering course using brick jelly lime


concrete for an average of 75mm thick - Rate for 100 sft.

25.00 Cft Brick bats


9.76 Cft Lime

Page 15 -DATA
SNo. Constant Unit Description

100.00 sft. Labour for laying & finishing


100.00 sft. Average Lift charges
100.00 sft. Scaffolding charges
100.00 sft. Curing charges

Total

Rate = Rs.
Rs. 298 Sqm. Rate = Rs.

02 Pressed tiles in CM 1:4,20 mm thick


mixed with WPC - Rate for 100 sft.

185.00 nos Weathering course tiles


9.10 cft River sand
1.47 bag Cement
100.00 sft. Labour for laying & finishing
100.00 sft. Average Lift charges
0.29 lts. Approved WPC
100.00 sft. Curing & scaffolding charges

Rate = Rs.
Rs. 491 Sqm. Rate = Rs.

Lift charges for each floor

Rate = Rs.
Rs. 22 Sqm. Rate = Rs.

13. FLOORING ITEMS

01 Grano Floor finish with CC 1:1.5:3 using 6mm chips


50 mm thick
A. Excl. - Rate
Vaccum for 100 sft.Process
dewatering

16.67 cft Chips


9.75 cft River sand
4.08 bag Cement
100.00 sft Machinery Hire charges

Page 16 -DATA
SNo. Constant Unit Description

100.00 sft Laying & finising


100.00 sft Curing charges

Total

Rate = Rs.
Rs. 342 Sqm. Rate = Rs.
B. Incl. Vaccum dewatering Process

100.00 cft Rate same as above


100.00 cft Charges for vaccum dewatering

Rate = Rs.
Rs. 401 Sqm. Rate = Rs.

04 Supplying and laying of ceramic tiles.

105.00 sft. Cost of ceramic tile (300 mm x 300 mm)


8.53 cft River sand
1.80 bag Cement
100.00 sft. Labour charges for laying incl. Helper
100.00 sft. Average Lift Charges
100.00 sft. Misc. materials

Total

Rate = Rs.
Rs. 996 Sqm. Rate = Rs.

SKIRTING
01 Supplying and Laying of ceramic tile for Skirting in
CM 1:4, 20 mm thick, 75 - 100 mm height - Rate for
36.00 sft. 100
CostRft.
of ceramic tile
3.00 Cft River sand
0.60 bag Cement
100.00 rft Average Lift Charges
100.00 rft Labour charges for fixing & finishing incl. Helper

Total

Page 17 -DATA
SNo. Constant Unit Description

Rate = Rs.
Rs. 128 Rmt Rate = Rs.

WALL TILES
02 Supplying and Laying of Glazed tiles for Dadoing in
CM 1:4, 20 mm thick - Rate for 100 sft.
105.00 sft. Cost of Glazed tile (200 mm x 300 mm)
8.53 cft River sand
1.80 bag Cement
100.00 sft. Labour charges for laying incl. Helper
100.00 sft. Average Lift Charges
100.00 sft. Misc. materials

Total

Rate = Rs.
Rs. 1012 Sqm. Rate = Rs.
TABLE TOP
01 Laying of granite slab for table top in CM 1:4, 20
mm thick - Rate for 100 sft.
115.00 sft. Cost of granite slab
8.53 cft River sand
1.80 bag Cement
100.00 sft. Labour charges for laying & polishing, incl. Helper
100.00 sft. Average Lift Charges
100.00 sft. White cement
charges for making holes for wash basin, nosing &
50.00 sft. Edge polishing

Total

Rate = Rs.
Rs. 2148 Sqm. Rate = Rs.

15. PAINTING ITEMS

01 Providing & Painting one coat of birla white cement -


Rate for 100 Sft)
2.50 Kg Cost of birla white cement
100.00 sft Labour charges
Page 18 -DATA
SNo. Constant Unit Description

100.00 sft Misc. materials

Total

Rate = Rs.
Rs. 14 Sqm Rate = Rs.

02 Providing & Painting two coats of cement paint - Rate


for 100 Sft)
3.25 kg Cost of cement paint for first coat
100.00 sft Labour charges for the above
1.80 kg Cost of cement paint for second coat
100.00 sft Labour charges for above
100.00 sft Misc. materials

Total

Rate = Rs.
Rs. 45 Sqm Rate = Rs.

04 Providing & Painting One coatof enamel paint for steel


joineries - Rate for 100 Sft)
1.11 lts Cost of enamel paint for first coat
100.00 sft Labour charges for above
100.00 sft Misc. materials

Total

Rate = Rs.
Rs. 41 Sqm Rate = Rs.

Page 19 -DATA
ULE ITEMS

Rate Per Amount

K ITEMS

5 Cft. 500.00
1.00 Cft. 100.00

600.00
6 /cft.
212 /cum.

1.75 /cft.
62 /cum.

4.00 cft. 400.00


0.75 1.25 cft. 50.00
1.50 cft. 90.00
0.5 cft. 50.00

590.00
5.90 /cft.
208 /cum.

1.75 /cft.
62 /cum.

23.00 cft. 2300.00


2 cft. 80.00
1.50 cft. 90.00

Page 20 -DATA
Rate Per Amount

0.5 cft. 50.00

2520.00
25.20 /cft.
890 /cum.

2.50 /cft.
88 /cum.

ORKS

4.00 cft. 400.00


2.00 cft. 200.00

600.00
6 /cft.
212 /cum.

10.00 cft. 1200.00


4.00 cft. 400.00
2.00 cft. 200.00

1800.00
18 /cft.
636 /cum.

RTING

ad of 500m
1.10 Cft 110.00
0.65 Cft 65.00

175.00

Page 21 -DATA
Rate Per Amount

175.00
1.75 /cft.

61.81 /cum.

3.50 Cft 350.00


1.50 Cft 150.00

500.00

500.00
5.00 /cft.

176.60 /cum.

10.00 cft. 1300.00


2.50 cft. 250.00
1.00 cft. 100.00

1650.00
17 /cft.
583 /cum.

NCRETE - PCC

24.00 cft 2160.00


45.00 cft 2632.50
400.00 bag 2936.00
4.00 l.s. 400.00
20.00 cft 2000.00
1.00 l.s. 100.00

10228.50
102 /cft.
3613 /cum.

Page 22 -DATA
Rate Per Amount

24.00 cft 356.40


24.00 cft 356.40
45.00 cft 868.73
400.00 Bag 1203.98
2.00 l.s. 200.00
15.00 sft 1500.00
0.75 l.s. 75.00

4560.51
46 /sft
491 /sqm.

ASONRY

9.50 nos. 3230.00


19.00 nos. 190.00
45.00 cft 1755.00
400.00 bag 1400.00
35.00 cft 3500.00
0.75 l.s 75.00

10150.00
102 /cft.
3585 /cum.

101.50 cft 10150.00


400.00 bag 232.00
3.50 nos. 472.50

10854.50
109 /cft.
3834 /cum.

Page 23 -DATA
Rate Per Amount

5:3 Mix

24.00 cft. 2160.00


45.00 cft. 2632.50
400.00 bag 10800.00
4.00 l.s 400.00
2.00 l.s 200.00
1.00 l.s 100.00

16292.50

162.93 /cft.

162.93 Cft 16292.50


28.00 Cft 2800.00

19092.50

191 /cft.
6743 /cum.

162.93 cft. 16292.50


30.00 cft. 3000.00

19292.50

193 /cft.
6812 /cum.

162.93 cft. 16292.50


21.00 cft. 2100.00

Page 24 -DATA
Rate Per Amount

18392.50

184 /cft.
6494 /cum.

3.00 /cft.
106 /cum.

2.5 /sft.
26.9 /sqm.

X(M20)

6.4

3500.00 / Cum

900.00 / Cum

4400.00 Cum

ORK

6.50 Nos. 8125.00

Page 25 -DATA
Rate Per Amount

45.00 Cft 1462.50


400.00 bag 1360.00
2.00 l.s 200.00
27.00 Cft 2700.00
1.00 l.s 100.00

13947.50

139 /cft.
4926 /cum.

3 /cft.
105.93 /cum.

6.50 no. 3055.00


45.00 cft 585.00
400.00 bag 616.00
4.00 rft 560.00
16.00 sft. 1600.00
1.50 l.s 150.00
1.00 l.s 100.00

6666.00

67 /sft.
717 /sqm.

2.5 /sft.
26.9 /sqm.

G ITEMS

Page 26 -DATA
Rate Per Amount

45.00 cft 292.50


400.00 bag 500.00
7.50 Sft 750.00
2.50 l.s 250.00
1.00 l.s 100.00

1892.50

19 /sft.
204 /sqm.

45.00 cft 337.50


400.00 bag 400.00
6.50 sft 650.00
2.50 l.s 250.00
1.00 l.s 100.00

1737.50

17 /sft.
187 /sqm.

45.00 Cft 409.50


400.00 bag 588.00
6.50 sft 650.00
2.50 l.s 250.00
0.50 l.s 50.00

1947.50

19 /sft.
210 /sqm.

Page 27 -DATA
Rate Per Amount

45.00 Cft 409.50


400.00 bag 588.00
200.00 Lts 50.00
7.00 sft 700.00
2.50 l.s 250.00
0.50 l.s 50.00

2047.50

20 /sft.
220 /sqm.

45.00 cft 292.50


400.00 bag 500.00
200.00 Lts 50.00
7.00 sft 700.00
2.50 l.s 250.00
3.00 sft 300.00
0.50 l.s 50.00

2142.50

21 /sft.
231 /sqm.

/sft.
5 /sqm.

Rate for 100 sft.

162.93 Sft 2709.44


5.00 sft 550.00
45.00 Cft 585.00
400.00 bag 712.00
25.00 sft 2500.00

Page 28 -DATA
Rate Per Amount

3.50 l.s 350.00

7406.44
-
74 /sft.
797 /sqm.

ITEMS

45.00 cft 409.50


400.00 bag 784.00
200.00 lts. 78.00
6.00 sft 600.00
0.30 l.s 30.00

1901.50

19 /Sft.
205 /Sqm.

24.00 Cft 600.00


45.00 Cft 658.35
400.00 bag 2408.00
200.00 Lts 240.00
3.50 sft. 350.00
0.60 sft. 60.00
7.00 sft. 700.00
1.00 l.s 100.00

5116.35

51 /sft.
551 /sqm.

45.00 cft 409.50

Page 29 -DATA
Rate Per Amount

400.00 bag 588.00


120.00 lit 34.80
1.00 l.s 100.00
4.00 sft 400.00
7.00 sft 700.00

2232.30

22 /sft.
240 /sqm.

6.50 nos. 1755.00


45.00 cft 369.00
400.00 bag 1160.00
2.00 rft 200.00
2.00 rft 200.00
27.00 rft 2700.00
1.50 l.s 150.00

6534.00

65 /Rft.
214 /Rmt.

6.50 nos. 2437.50


45.00 cft 945.00
400.00 bag 1324.00
3.00 rft 300.00
1.00 rft 100.00
34.00 rft 3400.00
0.75 l.s 75.00

8581.50

86 /Rft.
281 /Rmt.

Page 30 -DATA
Rate Per Amount

1.00 Rft 100.00


2.00 l.s 200.00
1.00 rft 100.00
16.00 Rft 1600.00
0.75 l.s 75.00

2075.00

21 /Rft.
68 /Rmt.

45.00 cft 36.00


400.00 bag 72.00
2.00 l.s 200.00
1.50 Rft 150.00
20.00 rft 2000.00
0.25 l.s 25.00

2483.00

25 /rft.
81 /rmt.

45.00 cft 135.00


400.00 bag 292.00
2.00 l.s 200.00
1.50 Rft 150.00
27.00 rft 2700.00
0.25 l.s 25.00

3502.00

Page 31 -DATA
Rate Per Amount

35 /rft.
115 /rmt.

hi concrete 1:5:10 mix.

35.00 cft. 3150.00


45.00 cft. 2632.50
400.00 bag 2936.00
3.00 cft. 300.00
15.00 cft. 1500.00
4.00 cft. 400.00
0.50 cft. 50.00

10968.50

110 /cft.
3874 /cum.

3.50 cft. 83.16


45.61 sft. 484.78
139.48 cft. 1046.06
31.71 sft. 1030.52

2644.52

81 /Sft.
876 /sqm.

5.00 Sft 550.00


0.25 Sft 25.00
1.25 Sft 125.00

Page 32 -DATA
Rate Per Amount

700.00

7 /sft
75 /sqm.

25.00 each 25.00


15.00 each 15.00
5.00 each 5.00

45.00

45 /No.

75 Rft 7500
12 Rft 1200
3 Rft 300
9 Rft 900

9900.00

99 /rft
325 /rm.

90 Rft 9000
18 Rft 1800
3 Rft 300
11 Rft 1100

12200.00

122 /rft
400 /rm.

130 Rft 13000


25 Rft 2500

Page 33 -DATA
Rate Per Amount

3 Rft 300
18 Rft 1800

17600.00

176 /rft
577 /rm.

15 each 15
15 each 15
5 each 5

35.00

35 /Each

ENT STEEL

53000.00 MT. 53000.00


65000.00 MT. 650.00
10000.00 MT. 10000.00

63650.00

63650.00

63650 /MT

WITH PRESSED TILES

e for 100 sft.

35.00 Cft 875.00


45.00 Cft 439.20

Page 34 -DATA
Rate Per Amount

8.50 sft. 850.00


3.00 sft. 300.00
2.00 l.s 200.00
1.00 l.s 100.00

2764.20

28 /sft.
297 /sqm.

13.00 nos 2405.00


45.00 cft 409.50
400.00 bag 588.00
9.00 sft. 900.00
1.00 sft. 100.00
200.00 lts. 58.00
1.00 l.s 100.00

4560.50

46 /sft.
491 /sqm.

2 /sft.
21.52 /sqm.

ITEMS

24.00 cft 400.08


45.00 cft 438.75
400.00 bag 1632.00
1.25 l.s 125.00

Page 35 -DATA
Rate Per Amount

5.50 sft 550.00


0.25 l.s 25.00

3170.83

32 /sft.
341 /sqm.

31.71 cft 3170.83


5.50 l.s 550.00

3720.83

37 /sft.
400 /sqm.

60.00 sft. 6300.00


45.00 cft 383.85
400.00 bag 720.00
12.00 sft. 1200.00
3.50 sft. 350.00
3.00 sft. 300.00

9253.85

93 /sft.
996 /sqm.

60.00 sft. 2160.00


45.00 Cft 135.00
400.00 bag 240.00
1.50 rft 150.00
12.00 rft 1200.00

3885.00

Page 36 -DATA
Rate Per Amount

39 /rft.
127 /Rmt.

ES

60.00 sft. 6300


45.00 cft 383.85
400.00 bag 720
14.50 sft. 1450
3.50 sft. 350
2.00 sft. 200

9403.85

94 /sft.
1012 /sqm.
OP

100.00 sft. 11500.00


45.00 cft 383.85
400.00 bag 720.00
50.00 sft. 5000.00
5.00 sft. 500.00
1.00 sft. 100.00

35.00 sft. 1750.00

19953.85

200 /sft.
2147 /sqm.

ITEMS

20.00 Kg 50.00
0.50 sft 50.00
Page 37 -DATA
Rate Per Amount

0.25 sft 25.00

125.00

1.25 sft
13.45 /Sqm.

55.00 kg 178.75
0.75 sft 75.00
28.00 kg 50.40
0.75 sft 75.00
0.35 sft 35.00

414.15

4.14 sft
44.56 /Sqm.

180.00 lit 199.80


1.00 sft 100.00
0.75 sft 75.00

374.80

3.75 sft
40.33 /Sqm.

Page 38 -DATA
PRESENT RATES FOR THE CIVIL WORKS (with Cement & Reinforceme

RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES

1. EARTH WORK ITEMS


1 Open well excavation upto 6'0" level in all soils 212.00 Cum
2b Extra for each additional 1.80 m depth 61.79 Cum
3a Earthwork excavation for column pits upto 6'0" level in all soils 209.00 Cum
3b Extra for each additional 1.80 m depth 61.81 Cum
4a Earthwork Excavation upto 6'0" level in hard rock by blasting 891.00 Cum
4b Extra for each additional 1.80 m depth 88.30 Cum

2. FILLING WORKS
1 Labour charges for filling with avaiable earth 212.00 Cum
2 Refilling the trenches & basement with imported earth 636.00 Cum

3. PLAIN CEMENT CONCRETE - PCC


1 P.C.C. 1:5:10 - foundation. 3613.00 Cum
2 Flooring PCC 1:4:8 - 100 mm thick 491.00 sqm

4.TRANSPORTING
Transporting the excess earth
a) Within the site premises up to initial lead of 500m 62.00 Cum
b)-do- for each additional lead of 500m. 40.00 Cum
c) - do- for transporting the earth to places of dump outside the 177.00 Cum

5. SIZE STONE MASONRY


1 Size stone masonry in CM 1:7 for foundation 3585.00 Cum
2 Size stone masonry in CM 1:6 for basement using with one
side dressing stone 3834.00 Cum

RATES-Page 39 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES

6. A. RCC 1:1.5:3 Mix


A. RCC 1:1.5:3 M-20 mix
Column Footings. 6744.00 Cum
Plinth beams. 6813.00 Cum
Columns (Square/Rectangular/Circular). 6495.00 Cum
Walls 6495.00 Cum
Lintel/Beams. 6495.00 Cum
Slab (flat/sloped/hipped), staircase waist slab, canopy slab. 6495.00 Cum
Sunshade, Table top & loft (75 mm thick). 487 Sqm

Lift charges for each additional floors


For Columns, lintel / Beams , Slabs 105.93 Cum
For Sunshade / Table Top 26.90 Sqm

7 RCC M20 Design mix ( By RMC) 4400.00 Cum

7. BRICK WORK
1 Brick work in CM 1:6, 9" thick. 4927.00 Cum
Lift charges for each floor 106.00 Cum
2 Brick partition in CM 1:4, 4.5" thick. 718.00 Sqm
Lift charges for each floor 27.00 Sqm

9. PLASTERING ITEMS
1 Ceiling plastering CM 1:3, 15 mm thick. 204.00 Sqm
2 Wall plastering CM 1:5, 15 mm thick. 187.00 Sqm
3 Plastering CM 1:4, 20mm thick, for stone masonry. 210.00 Sqm
4 Plastering CM 1:3, 20mm thick, WPC. 221.00 Sqm

RATES-Page 40 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES

5 Wall plastering in CM 1:3, 15mm thick (Average) with WPC 231.00 Sqm
6 Lath plastering for 75 mm tick in CM.1: 2: 4 797.00 Sqm
Lift charges for each floor 5.00 Sqm

10. FINISHING ITEMS


1 DPC. In CM 1:3, 20 mm tk. With WPC. 205.00 Sqm
2 Screeding in CC 1:1.5:3 using 12 mm chips 75 mm thick with W 551.00 Sqm
3 Screeding over sunshade in CM 1:4, 20mm tk. with WPC. 241.00 Sqm
4 Brick on edge over sunshade.
a. 200 mm height. 215.00 Rmt
b. 300 mm height. 282.00 Rmt
5 Rain water border (25 x 12 mm). 69.00 Rmt
6 a. Ornamental border size upto 25 x 25 mm. 82.00 Rmt
b.Ornamental border size upto 50 x 50 mm. 115.00 Rmt
7 Filling the sunken portion with brick bats 3875.00 Cum.
8 Providing plinth protection for 1 m wide in cm 1:5:10. 876.00 Sqm.
9 P/F of chicken mesh. 76.00 Sqm.
10 Providing & Fixing of GI Spout pipes -40 mm dia 45.00 No
11 S/F of PVC pipe incl. All specials 100 mm dia 325.00 Rmt
12 S/F of PVC pipe incl. all specials 150 mm dia 401.00 Rmt
13 S/F of PVC pipe incl. all specials 200 mm dia 578.00 Rmt
14 S/F of PVC Spout pipes -40 mm dia. 35.00 No

11. REINFORCEMENT STEEL


1 Supplying & fabrication of steel reinforcement.(Tor Steel) 63650.00 M.T

12. WEATHERING COURSE WITH PRESSED TILES


1 Weathering course in lime surkhi concrete 75mm tk. 298.00 Sqm

RATES-Page 41 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES

2 S/L of Pressed tiles in CM 1:4, 20 mm tk with WPC. 491.00 Sqm


Lift charges for each floor 21.52 Sqm

13. FLOORING ITEMS


FLOORING
1 Floor finishinig - CC 1: 1 1/2 : 3, 50 mm tk.
a. Excluding Devaccum process. 342.00 Sqm
b. Including Devaccum process. 401.00 Sqm
4 Supplying and laying of ceramic tiles. 996.00 Sqm.

SKIRTING
1 Supplying and Laying of ceramic tile for Skirting
128.00 Rmt

DADOING
2 Supplying and Laying of Glazed tiles for Dadoing 1012.00 Sqm

TABLE TOP
1 Laying of granite slab for table top 2148.00 Sqm

15. PAINTING ITEMS


1 Providing & Painting one coat of birla white cement 14.00 Sqm
2 Providing & Painting two coats of cement paint 45.00 Sqm
4 Providing & Painting one coat of enamel paint for steel joineries 41.00 Sqm

16. CENTERING ITEMS


1 S/E Centering for Column footings & plinth beams. 235.00 Sqm
2 S/E Centering for Columns, Sunshade & walls. 280.00 Sqm
3 S/E Centering for Lintels, Beams & Slab etc., 280.00 Sqm
For slopped / Hipped roof slab. 325.00 Sqm

RATES-Page 42 of 49
RATE
WITHOUT
SI.NO DESCRIPTION PER
OHP &
TAXES

RATES-Page 43 of 49
with Cement & Reinforcement steel)

Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0% 20% 6.08%

0.00 42.40 12.89 267 Cum


0.00 12.36 3.76 78 Cum
0.00 41.80 12.71 264 Cum
0.00 12.36 3.76 78 Cum
0.00 178.20 54.17 1123 Cum
0.00 17.66 5.37 111 Cum

0.00
0.00 42.40 12.89 267 Cum
0.00 127.20 38.67 802 Cum

0.00
0.00 722.60 219.67 4555 Cum
0.00 98.20 29.85 619 sqm

0.00

0.00 12.40 3.77 78 Cum


0.00 8.00 2.43 50 Cum
0.00 35.40 10.76 223 Cum
0
0.00
0.00 717.00 217.97 4520 Cum

0.00 766.80 233.11 4834 Cum

RATES-Page 44 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0
0.00
0
0.00 1348.80 410.04 8503 Cum
0.00 1362.60 414.23 8590 Cum
0.00 1299.00 394.90 8189 Cum
0.00 1299.00 394.90 8189 Cum
0.00 1299.00 394.90 8189 Cum
0.00 1299.00 394.90 8189 Cum
0.00 97.43 29.62 614 Sqm
0

0.00 21.19 6.44 134 Cum


0.00 5.38 1.64 34 Sqm
0
0.00 880.00 267.52 5548 Cum

0.00
0.00 985.40 299.56 6212 Cum
0.00 21.20 6.44 134 Cum
0.00 143.60 43.65 905 Sqm
0.00 5.40 1.64 34 Sqm

0.00
0.00 40.80 12.40 257 Sqm
0.00 37.40 11.37 236 Sqm
0.00 42.00 12.77 265 Sqm
0.00 44.20 13.44 279 Sqm

RATES-Page 45 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0.00 46.20 14.04 291 Sqm
0.00 159.40 48.46 1005 Sqm
0.00 1.00 0.30 6 Sqm
0
0.00
0.00 41.00 12.46 258 Sqm
0.00 110.20 33.50 695 Sqm
0.00 48.20 14.65 304 Sqm
0.00 0.00 0.00 0
0.00 43.00 13.07 271 Rmt
0.00 56.40 17.15 356 Rmt
0.00 13.80 4.20 87 Rmt
0.00 16.40 4.99 103 Rmt
0.00 23.00 6.99 145 Rmt
0.00 775.00 235.60 4886 Cum.
0.00 175.20 53.26 1104 Sqm.
0.00 15.20 4.62 96 Sqm.
0.00 9.00 2.74 57 No
0.00 65.00 19.76 410 Rmt
0.00 80.20 24.38 506 Rmt
0.00 115.60 35.14 729 Rmt
0.00 7.00 2.13 44 No
0
0.00
3182.50 66833 M.T
0
0.00
0.00 59.60 18.12 376 Sqm

RATES-Page 46 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0.00 98.20 29.85 619 Sqm
0.00 4.30 1.31 27 Sqm
0
0.00
0.00
0
0.00 68.40 20.79 431 Sqm
0.00 80.20 24.38 506 Sqm
0.00 199.20 60.56 1256 Sqm.
0
0.00
0.00 25.60 7.78 161 Rmt
0
0.00
0.00 202.40 61.53 1276 Sqm
0
0.00
0.00 429.60 130.60 2708 Sqm
0
0
0.00 2.80 0.85 18 Sqm
0.00 9.00 2.74 57 Sqm
0.00 8.20 2.49 52 Sqm

0.00
0.00 47.00 14.29 296 Sqm
0.00 56.00 17.02 353 Sqm
0.00 56.00 17.02 353 Sqm
0.00 65.00 19.76 410 Sqm

RATES-Page 47 of 49
Water &
Service
RATE WITH
Overhead & Taxes -
OHP & PER
Profit 4.08% + VAT
TAXES
- 2%
Power
0

RATES-Page 48 of 49
BASIC MATERIAL RATE CONSIDERED FOR WORKING OUT THE RATES
Rate in
S.No Description Unit
Rs. P.

1 Cement 400.00 Bag

2 Reinforcement steel (Tor) 53000.00 MT

3 Sand 45.00 Cft

4 40 mm metal 24.00 Cft

5 20 mm metal 24.00 Cft

6 12 mm & below chips 24.00 Cft

7 Size Stones 9.50 Each

8 Bond stones 19.00 Each

9 Bricks 6.50 Each

10 Brick bats 35.00 Cft

11 Lime 45.00 Cft

12 Pressed tiles 13.00 Each

13 Chicken mesh 5.00 Sft

14 Water proofing compound 200.00 Litre

15 Gravel 10.00 Cft

16 Hoop iron 4.00 Rft

Flooring Materials

23 Ceramic Tiles 60.00 Sft

24 Granite Slab 100.00 Sft

Painting Materials

32 Kottayam/Bila white cement 20.00 Kg

33 Primer 65.00 Ltr

34 Cement paint 55.00 Kg

35 Enamel paint 180.00 Ltr