44.2.

a Assembling of wire crates/gabion/revetment and placing them in position including streching


,binding them together and tying down lids. Box size(3X1X 1) (16 m2)

Unit :Per m3 44.1.A.ii.b DoLIDAR


Particular Description Unit Quantity Rate Amount Remarks
Labours Skilled 0 md 955.00 0.00
Unskilled 0.13 md 700.00 91.00

Binding wire
Materials 1.3 121.03 157.34
12swg(Heavy Coated)
kg
Sub-Total 248.34
15 % Overhead -
Rate per Box
Size(3X1X1) 248.34
Rate per m3 82.78

Unit rate/m3 Gabion Box


Size(2x1x1) NRs. 88.99
Gabion Box
Size(3x1x1) NRs. 82.78

Average Unit Rate 171.77 88.99 m3


45) Packing and filling of Gabion crates with stone
Unit :1m3 45.17-6 DoLIDAR
Particular Description Unit Quantity Rate Amount Remarks
Labours Skilled 0.3 md 955.00 286.50
Unskilled 0.75 md 700.00 525.00
Materials Stone 1.10 m3 1775.20 1952.72
Sub-Total 2,764.22
15 % Overhead -
Unit Rate 2,764.22 m3

Hence, Unit Rate per Cu m.

Fabrication of gabion box Hand Made 1802.43


m3

Packing and filling of Gabion crates with stone 2,764.22 m3


Total 4566.65 m3
Providing Mechine Made Heavy coated gabion Box Hexagonal Mesh size 10X12 cm,Mesh wire 10swg
(Heavy Coated),Selvedge wire 8swg (Heavy Coated),Binding wire 12swg(Heavy Coated) at site.

Size Sq.m/box Rate/Sq.


m Rate/Box Rate/Cu.m
Gabion Box 8
Size(1.5x1x1) 297.119 2376.95424 1584.64
Gabion Box 11
Size(2x1x1) 297.119 3268.31208 1,634.16
Gabion Box 16
Size(3x1x1) 297.119 4753.90848 1,584.64

Mechine Made Heavy coated gabion Box 1,634.16 m3


Packing and filling of Gabion crates with stone 2,764.22 m3
Sub Total Cost 4398.38
Assembling 88.99
Total Cost 4487.37

Prepared by:- Checked by:- Approved by:-


38.8 Dry Uncoursed Rubble Stone Masonry

Norms No : 38-8 DoLIDAR


Unit : Cu.m.
Particular Description Unit Quantity Rate Amount Remarks
Labours Skilled 0.5 md 955.00 477.50
Unskilled 1.5 md 700.00 1050.00
Materials Stone 1.10 m3 1775.20 1952.72
Sub-Total 3,480.22
15 % Overhead -
Unit Rate 3,480.22 m3

26.3-1 Riverbed Material


Unit :1m3 38-8 DoLIDAR
Particular Description Unit Quantity Rate Amount Remarks
Labours Skilled 0 md 955.00 0.00
Unskilled 1 md 700.00 700.00
Materials River Bed Materials 1.00 m3 1400.00 1400.00
Sub-Total 2,100.00
15 % Overhead 315.00
Unit Rate 2,415.00 m3

1 .Transportation of BM Soil by truck or Tractor (15 KMpH)


DoLIDAR
Unit: 10 Cu. M. Norms S.N: 56.2
Spec.C No: G-13.2
Lead source Type Quantity Unit Rate Amount
First 1KM Labour Unskill 1.36 md 700.00 952.00
Material Disel 2.35 LTR 86.50 203.28
Truck/Tractor -
Equipment Working Hr. 0.39 Hr. 300 117.00
Idle HR. 2.21 Hr. 150 331.50
Actul Rate 1,603.78
Unit Rate 160.38

item : laying of locally available granular materials for gravelling in Roadway for gravelling including
j10m lead & 1.5m lift-per m3
particular unit Qantity Rate Amount Remarks
subgrade preparation 10 cm depth
labour unskill md 0.05 700.00 35

laying of sub base for gravelling 15cm 0


thick 0
labour unskill md 1.5 700.00 1050 pouring &
Material kg km levelling
Transportation upto 4
km for 1m3=1800kg/m3

1800 3.5 0.047 296.1


Sub-total 1381.1
15%overhead 207.165
unit rate 1588.265

Prepared by:- Checked by:- Approved by:-


Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Prepared by:- Checked by:- Approved by:-
Kathekhola Rural Municipality
Office Of Rural Municipality Executive
Bihunkot, Baglung
Gandaki Province, Nepal

Measurement Book

cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f


7]ufgf M sf=uf=kf= $ t+u|fd
RATE ANALYSIS
cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f
7]ufgf M sf=uf=kf= * n]vflg F./Y.:- 075-076

Item Labour (L) Materials (M) Total (L+M)

Rate Unit Rate, Rs. Cost, Rs. Total Cost, Rs.


Cost Unit
SN Description Catagory m.d. Type Quantity IncludingVAT(for
per m.d. Including Excluding Including Excluding
UC)
Rs. Rs. VAT VAT VAT VAT in m
1 Site clearance for1Sqm Unskill 0.23 700 161.00 Tools & Plant 3 % of labour cost 4.83 4.83 16.58
1 Site clearance for1Sqm Unskill 0.04 700 28.00 Tools & Plant 3 % of labour cost 0.84 0.84 28.84
dismentaling of old
bldg(mud mortar) Unskill 1.06 700 742.00 Tools & Plant 3 % of labour cost 22.26 22.26 m3 764.26
Skill 0.054 955 51.57 Tools & Plant 3 % of labour cost 1.55 1.55 53.12
roof dismentaling work Unskill 0.081 700 56.70 Tools & Plant 3 % of labour cost 1.70 1.70 m2 58.40
111.52

2
Earthwork in excavation in

a ordinary soft soil- For 1 m3 Unskill 0.60 700 420.00 Tools & Plant 3 % of labour cost 12.60 12.60 432.60
b Hard soil- For 1 m3 Unskill 0.80 700 560.00 Tools & Plant 3 % of labour cost 16.80 16.80 576.80
c Soft Rock- For 1 m3 Unskill 0.80 700 560.00 Tools & Plant 3 % of labour cost 16.80 16.80 576.80
d Medium Rock- For 1 m3 Unskill 3.00 700 2100.00 Tools & Plant 3 % of labour cost 63.00 63.00 2163.00

e Hard Rock- For 1 m3 (no


chino) Unskill 5.00 700 3500.00 Tools & Plant 3 % of labour cost 105.00 105.00 3605.00
with chino Unskill 24.00 700 16800.00 Tools & Plant 4 % of labour cost 504.00 504.00 17304.00
f. BMS- For 1 m3 Unskill 0.80 700 560.00 Tools & Plant 3 % of labour cost 16.80 16.80 576.80
Stone Solling in foundation
4
& Leveling Unskill 1.50 700 1050.00 Tools & Plant 3 % of labour cost 31.50 31.50 1081.50
Blockstone 1.00 2293.80 1500.00 2293.80 1500.00 2293.80
Bondstone 0.20 2293.80 1500.00 458.76 300.00 458.76
Total 1050.00 1831.50 2881.50
Formworks of Local wood
5
for Beam/Slab Skill 0.150 955 143.25 Local Wood 0.0070 36000.00 36000.00 252.00 252.00 m3
For 1 Sq.m. Unskill 0.200 700 140.00 Nails 0.25 119.00 105.35 29.75 26.34 kg
Total 283.25 281.75 278.34 565.00
Quantity of wood required for 1 sqm formwork = 0.0526 cum.
Wood can be used 6 times for the formwork and after then 25% cost
of the wood is recovered. So the quantity of wood required for 1 sqm = 0.00658 cum.

9
Plain cement concrete work Skill 1.00 955 955.00 Cement 0.32 22447.0 20159.0 7183.04 6450.88 MT
M15(P.C.C. 1:2:4) Unskill 4.00 700 2800.00 Agg.40mm 0.52 7356.2 7356.2 3825.22 3825.22 cu.m
and wall - For 1 m3 Agg.20mm 0.22 6719.0 6719.0 1478.18 1478.18 cu.m
Item Labour (L) Materials (M) Total (L+M)

Rate Unit Rate, Rs. Cost, Rs. Total Cost, Rs.


Cost Unit
SN Description Catagory m.d. Type Quantity IncludingVAT(for
per m.d. Including Excluding Including Excluding
UC)
Rs. Rs. VAT VAT VAT VAT in m
For Foundation Agg.10mm 0.11 6454.4 6454.4 709.98 709.98 cu.m
Sand 0.445 6494.40 6494.40 2890.01 2890.01 cu.m
Total 3755.00 16086.43 15354.27 19841.43
39 Reinfocement for RCC work Skill 0.012 955 11.46 M.S. Rod 0.001050 91829 81559 96 85.64 MT
in position and binding of
M.S. rod for R.C.C. works -
for 1 kg
Unskill 0.012 700 8.40 Binding wire 0.01000 113.35 100.35 1.13 1.00 Kg
Total 19.86 97.13 86.64 116.99
RATE ANALYSIS

Total (L+M)

Total Cost, Rs.

IncludingVAT(for
UC)
in ft
1.54
2.68

12.26
16.35
16.35
61.30

102.16
490.37
16.35

81.66

52.52
Total (L+M)

Total Cost, Rs.

IncludingVAT(for
UC)
in ft

562.28
Government of Nepal
Ministry of Local Development
Office of District Development Committee
District Technical Office
Gorkha
Rate of Materials

Rate/kg/km
General Rate for Analysis Rate for Analysis Weight Load / By Tractor By Poters
SN Particular VAT 13% Unit
Rate ( VAT+Trans.) (WithTrans.) per unit Unload
Tractor Porter
Dist(KM) Amount Dist(KM) Amount
1 Skill Labour 955.00 955.00 955.00 md
2 Unskilled Labour 700.00 700.00 700.00 md
3 Painter 955.00 955.00 955.00 md
4 Sand 2400.00 6494.40 6,494.40 m3 1600.00 0.147 0.59 15.00 3528.00 0.60 566.40
5 Aggregate 40mm 2750.00 7356.20 7,356.20 m3 1800.00 0.147 0.59 15.00 3969.00 0.60 637.20
6 Aggregate 20mm 2750.00 6719.00 6,719.00 m3 1800.00 0.147 0.59 15.00 3969.00 0.00
7 Aggregate 10mm 2750.00 6454.40 6,454.40 m3 1800.00 0.147 0.59 14.00 3704.40 0.00 0.00
8 Stone 1500.00 2293.80 2,293.80 m3 1800.00 0.147 0.59 3.00 793.80 0.00
9 Mud for masonry 280.00 280.00 280.00 m3 1400.00 0.147 0.59 0.00 0.00 0.00
10 Sal wood 45000.00 45000.00 45,000.00 m3 600.00 0.147 0.59 0.00 0.00 0.00
11 Local Wood 36000.00 36000.00 36,000.00 m3 600.00 0.147 0.59 0.00 0.00
12 Sisau 70560.00 70560.00 70,560.00 m3 600.00 0.147 0.59 0.00 0.00
13 Cement(NS Mark OPC) 17600.00 2288.00 22447.00 20,159.00 mt 1000.00 0.147 0.59 15.00 2205.00 0.60 354.00
14 Brick(Chimney ) 12.00 1.56 13.56 12.00 Nos 2.50 0.147 0.00 0.60 0.00
15 Nail 105.00 13.65 119.00 105.35 kg 1.00 0.147 0.59 0.00 0.60 0.35
31 Reinforcement Bar(10-40mm) 79000.00 10270.00 91829.00 81,559.00 mt 1000.00 0.147 0.59 15.00 2205.00 0.60 354.00
32 GI Wire 12Swg (Heavy Coating) 105.00 13.65 119.00 105.35 kg 1.00 0.147 0.59 0.00 0.60 0.35
33 GI Wire 10Swg (Heavy Coating) 100.00 13.00 113.35 100.35 kg 1.00 0.147 0.59 0.00 0.60 0.35
34 GI Wire 8Swg (Heavy Coating) 100.00 13.00 113.35 100.35 kg 1.00 0.147 0.59 0.00 0.60 0.35
35 3mm Glass 500.00 65.00 567.97 502.97 m2 8.40 0.147 0.59 0.00 0.60 2.97
36 4mm Glass 640.00 83.20 727.16 643.96 m2 11.20 0.147 0.59 0.00 0.60 3.96
37 5mm Glass 750.00 97.50 852.46 754.96 m2 14.00 0.147 0.59 0.00 0.60 4.96
38 Lime 18.00 2.34 22.16 19.82 kg 1.00 0.147 0.59 10.00 1.47 0.60 0.35
39 Gum (Rathicol) 200.00 26.00 227.82 201.82 kg 1.00 0.147 0.59 10.00 1.47 0.60 0.35
40 Primer (wood) 290.00 37.70 329.52 291.82 Ltr 1.00 0.147 0.59 10.00 1.47 0.60 0.35
41 Enamel (Tayari) 420.00 54.60 474.95 420.35 Ltr 1.00 0.147 0.59 0.00 0.60 0.35
42 Alumunium Paint 500.00 65.00 565.35 500.35 Ltr 1.00 0.147 0.59 0.00 0.60 0.35
43 Sand Paper 10.00 1.30 11.30 10.00 Sheet 0.147 0.59 0.00 0.60 0.00
44 Red Oxide No 1 350.00 45.50 395.85 350.35 Ltr 1.00 0.147 0.59 0.00 0.60 0.35

______________ _______________ ______________


Prepared By Checked by Approved By
Rate of Materials

Rate/kg/km
General Rate for Analysis Rate for Analysis Weight Load / By Tractor By Poters
SN Particular VAT 13% Unit
Rate ( VAT+Trans.) (WithTrans.) per unit Unload
Tractor Porter
Dist(KM) Amount Dist(KM) Amount
45 Binding wire 100.00 13.00 113.35 100.35 kg 1.00 0.147 0.59 0.00 0.60 0.35
46 CGI Sheet 0.45 mm th Colour 9970.00 1296.10 11289.11 9,993.01 bun. 65.00 0.147 0.59 0.00 0.60 23.01
47 CGI Sheet 0.4 mm th Colour 9300.00 1209.00 10530.24 9,321.24 bun. 60.00 0.147 0.59 0.00 0.60 21.24
48 Plain sheet 28 gauge 340.00 44.20 384.55 340.35 rm 1.00 0.147 0.59 0.00 0.60 0.35
49 3mm plywood 193.68 25.18 219.57 194.39 m2 2.00 0.147 0.59 0.00 0.60 0.71
50 Snowcem Paint 77.00 10.01 88.83 78.82 kg 1.00 0.147 0.59 10.00 1.47 0.60 0.35
51 Chimney Brick 12.00 1.56 14.55 12.99 nos 2.80 0.147 0.59 0.00 0.60 0.99
52 Wall Tile (Indian) 8"x6" 645.83 83.96 734.04 650.08 m2 12.00 0.147 0.59 0.00 0.60 4.25
53 Tile floor (Indian) 8"x8" 839.59 109.15 954.05 844.90 m2 15.00 0.147 0.59 0.00 0.60 5.31
54 White Cement 26.00 3.38 29.73 26.35 kg 1.00 0.147 0.59 0.00 0.60 0.35
55 2X 500 gauge polythene 83.00 10.79 93.79 83.00 m2 0.147 0.59 0.00 0.60 0.00
56 Railing with GI & Black Pipe 250.00 32.50 283.39 250.89 sqft 2.50 0.147 0.59 0.00 0.60 0.89
57 Nut Bolt 8 mm 25.00 3.25 28.25 25.00 No 0.147 0.59 0.00 0.00 0.00
58 Bitumin Washer 1.00 0.13 1.13 1.00 No 0.147 0.59 0.00 0.00 0.00
59 J-Hook 4" 22.00 2.86 24.86 22.00 No 0.147 0.59 0.00 0.00 0.00
60 J-Hook 6" 26.00 3.38 29.38 26.00 No 0.147 0.59 0.00 0.00 0.00
61 Iron Grill(Ready made) 120.00 15.60 135.60 120.00 kg 1.00 0.147 0.59 0.00 0.00 0.00
38 mm dia 16Gauge thick
62 350.00 45.50 395.50 350.00 Rm 0.147 0.59
stainless steel pipe 2.50 0.00 0.00 0.00
25 mm dia 16Gauge
63 200.00 26.00 226.00 200.00 Rm 0.147 0.59
thickstainless steel pipe 1.50 0.00 0.00 0.00
Gas welding for stainless steel
64 150.00 19.50 169.50 150.00 sq m 0.147
pipe 0.00 0.00 0.00
65 Black Iron Pipe 1.8 mm Thick 95.00 12.35 107.35 95.00 kg 1.00 0.147 0.00 0.00 0.00

______________ _______________ ______________


Prepared By Checked by Approved By
Kathekhola Rural Municipality
Office of The Rural Municipality Executive
Bihunkot, Baglung
Gandaki Province, Nepal

Quantity Estimate

cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f


7]ufgf M sf=uf=kf= $ t+u|fd

l;=g= ljj/0f g= nDafO{


rf}8fO{prfO{ kl/df0f o'lg6
1 Earthwork for
Ms angle post 88 0.30 0.3 0.3 2.38
tie beam 2 2.00 0.6 0.6 1.44
gate pillar 4 1.00 1 1 4.00
Sub total 7.82
50*50 mm 10 gauge fencing wire
2 1 130.00 1.5 195.00 m2
purchase
3 MS angle kg/m
50*50*5 mm 88 2.00 3.8 668.80 kg
Concreting work in M15 mix (c/s/a
4
1/2/4)
Ms angle post 88 0.30 0.3 0.3 2.38
gate pillar base 4 1.00 1 0.1 0.40
gate pillar footing 4 1.00 1 0.25 1.00
gate pillar 4 2.30 0.23 0.23 0.49

Sub total 4.27 m3

distance(
5 Transportation Cost km)
wt in kg*2 wt in quintal

Ms angle post 17 1337.60 13.376 227.39 qnt/km

6 Reinforcement Calculation unit wt

Horizontal bars 3 130.00 0.62 241.80

gate pillar(footing) 144 0.90 0.62 80.35

gate column 16 2.60 0.62 9.92

stirrups 104 0.80 0.4 33.28

10 % extra 36.54

total 401.89 kg

7 Stone soling work 4 1.00 0.15 0.60 m3

8 Formworks 16 0.23 2.5 9.20 m2

9 Metal gate 2 2.00 ls

10 Management Cost 1 Job


86.6667
Kathekhola Rural Municipality
Office of The Rural Municipality Executive
Bihunkot, Baglung
Gandaki Province, Nepal

Abstract of Quantity Estimate


cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f
7]ufgf M sf=uf=kf= $ t+u|fd

l;=g= ljj/0f kl/df0fo'lg6 b/ hDdf s}lkmot


1 Earthwork for MS angle 7.82 m3 432.60 3382.93
50*50 mm 10 gauge
2 195.00 m2 565.00 110175.00
fencing wire purchase
3 MS angle (50*50*5) 668.80 kg 96.05 64238.24
Concreting work in M15
4 4.27 m3 16086.43 68689.06
mix (c/s/a 1/2/4)
5 Transportation Cost 227.39 qnt/km 14.70 3342.63
Reinforcement bar 10 mm
6 401.89 kg 116.99 47017.11
dia.

7 Stone soling work 0.60 m3 2881.50 1728.90

8 Formworks 9.20 m3 565.00 5198.00

9 Metal gate 2.00 ls 15000.00 30000.00

10 Management Cost 1.00 Job 3000 3000.00

Total Estimated Amount 336771.87


Allocated Budget 300,000
UC Contribution 36771.87
10.92%
}lkmot
Salient Features of Project
cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f
7]ufgf M sf=uf=kf= $ t+
sfo{qmdsf] gfd
sfd ug]{ lgsfo pkef]Qmf ;ldlt
cfly{s aif{ 075/076
ljlgof]lht jh]6 300000.00
cg'dflgt nfut 336771.87
sG6LGh]G;L 0.00
pkef]Qmf >dbfg 36771.87
v'b e'QmfgL x'g;Sg] /sd 300000.00
l;=g sfdsf] ljj/0f

gf]6
ufp+kflnsfsf] sfof{non] pkef]Qmf ;ldlt;+u ;Demf}tf
ubf{ lgDgfg';f/sf] zt{x?sf] clgjfo{ kfngf u/fpg] k|ltj4tf lnP/
dfq ;Demf}tf
!=pkef]Qmf u/fpgsf
;ldltn] gS;f tyfnflu
nfut cg'/f]w
Ol:6d]6 adf]lhd lgdf{0f ubf{ k'/fgf
vfg]kfgL, l;+rfO{, ljBfno ejg, lghL 3/, uf]7, cf+“ug cfbL k"jf{wf/ ;+/rgf Iflt
k'¥ofPsf] v08df ;f]xL pkef]Qmf ;ldltn] cfkm";+u ePsf] ;Demf}tf /sd leqsf]
ah]6af6 dd{t, lgdf{0f jf k'glg{df{0f ul/lbg' kg]{5 . ;f] ;DjGwdf s'g} ph'/L
kg{ cfPdf pQm Iflt ePsf] lgdf{0f ug{ nfUg] /sd ;DjlGwt pkef]Qmf ;ldltsf]
vftfaf6 s§f u/]/ dfq clGtd km/kmf/s ug]{ Joj:yf ldnfpg'x'g .
@= ;DjlGwt k|fljlws 6f]nLn] ;fO{6df u/]sf] ;e]{, sfof{nosf] :jLs[t nfut cg'dfg
Pj+ gS;fx? cg';f/ g} lgdf{0f sfo{ u/fpg] k|ltj4tf lng' x'g .
#= :jLs[t nfut cg'dfg / gS;f eGbf km/s sfo{ u/L sfof{non] d"Nof+sg gu/]sf]
v08df s'g} lsl;dsf] ph'/ nfUg]5}g eGg] k|ltj4tf lng'x'g .
$= ;Demf}tf adf]lhdsf] lgdf{0f ubf{ u/fpbf jftfj/0f ;+/If0f P]g @)%# /
jftfj/0f lgodfjnL @)%$adf]lhd jftfj/0fdf gsf/fTds k|efj gkg]{ul/ u/fpg] k|ltj4tf
lng'x'g .
Kathekhola Rural Municipality
Office of The Rural Municipality Executive
Bihunkot, Baglung
Gandaki Province, Nepal

Quantity Measurement

cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f


7]ufgf M sf=uf=kf= $ t+u|fd

l;=g= ljj/0f g= nDafO{


rf}8fO{prfO{ kl/df0f o'lg6
1 Earthwork for
Ms angle post 88 0.35 0.35 0.35 3.77
tie beam 2 2.00 0.6 0.6 1.44
gate pillar 4 1.10 1.1 1 4.84
Sub total 10.05
50*50 mm 10 gauge fencing wire
2 1 130.00 1.5 195.00 m2
purchase
3 MS angle kg/m
50*50*5 mm 88 2.00 3.8 668.80 kg
Concreting work in M15 mix (c/s/a
4
1/2/4)
Ms angle post 88 0.30 0.3 0.3 2.38
gate pillar base 4 1.00 1 0.1 0.40
gate pillar footing 4 1.00 1 0.2 0.80
gate pillar 4 1.80 0.23 0.23 0.38
platform 1 1.50 2.1 0.1 0.32

Sub total 4.28 m3

distance(
5 Transportation Cost km)
wt in kg*2 wt in quintal

Ms angle post 17 1337.60 13.376 227.39 qnt/km

6 Reinforcement Calculation unit wt

Horizontal bars 3 130.00 0.62 241.80

gate pillar(footing) 144 0.90 0.62 80.35

gate column 16 2.60 0.62 9.92


stirrups 104 0.80 0.4 33.28

10 % extra 36.54

total 401.89 kg

7 Stone soling work 4 1.00 0.15 0.60 m3

8 Formworks 16 0.23 2.5 9.20 m2

9 Metal gate 2 2.00 ls

10 Management Cost 1 Job


86.6667
Kathekhola Rural Municipality
Office of The Rural Municipality Executive
Bihunkot, Baglung
Gandaki Province, Nepal

Abstract of Quantity Measurement


cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f
7]ufgf M sf=uf=kf= $ t+u|fd

l;=g= ljj/0f kl/df0fo'lg6 b/ hDdf s}lkmot


1 Earthwork for MS angle 10.05 m3 432.60 4347.63
50*50 mm 10 gauge fencing wire
2 195.00 m2 565.00 110175.00
purchase
3 MS angle (50*50*5) 668.80 kg 96.05 64238.24
Concreting work in M15 mix
4 4.28 m3 16086.43 68849.92
(c/s/a 1/2/4)
5 Transportation Cost 227.39 qnt/km 14.70 3342.63

6 Reinforcement bar 10 mm dia. 401.89 kg 116.99 47017.11

7 Stone soling work 0.60 m3 2881.50 1728.90

8 Formworks 9.20 m3 565.00 5198.00

9 Metal gate 2.00 ls 15000.00 30000.00

10 Management Cost 1.00 Job 3000 3000.00

Total Evaluated Amount 337897.43


Allocated Budget 300,000
UC Contribution 37897.43
11.22%
s}lkmot
sfo{;DkGg k|ltj]bg
sfof{nosf] gfd M– ufp+kflnsfsf] sfof{no d=n]=k=kmf=g+= M–
cfof]hgfsf] gfdM u0ftGq k|f= lj= tf/af/ lgdf{0f
7]ufgf M sf=uf=kf= $ t+u|fd
nfut cfg"dfg /sdM– 336771.87 sfd z'?ePsf] ldltM–
sfo{ ;DkGg ePsf] /sd M– 337897.43 sfd ;DkGg ug'{+kg] ldltM–
Oi6d]6 eGbf 36L jf a9LM1125.56 sfd ;DkGg ePsf] ldltM–
nfut sfof{ ;DkGg ePsf] km/s
qm= sfdsf] lhh/0f PsfO{
kl/df0f :jLst b/ nfut ? kl/df0f :jLst b/ /sd kl/df0f :jLst b/ /sd
1 Earthwork for MS angle m3 7.82 432.60 3,382.93 10.05 432.60 4347.63 2.23 964.70
50*50 mm 10 gauge fencing wire
2 purchase
m2 195.00 565.00 110,175.00 195.00 565.00 110175 0.00 0.00

3 MS angle (50*50*5) kg 668.80 96.05 64,238.24 668.80 96.05 64238.24 0.00 0.00
Concreting work in M15 mix
4 (c/s/a 1/2/4)
m3 4.27 16086.43 68,689.06 4.28 16086.43 68849.9204 0.01 160.86

5 Transportation Cost qnt/km 227.39 14.70 3,342.63 227.39 14.70 3342.633 0.00 0.00

6 Reinforcement bar 10 mm dia. kg 401.89 116.99 47,017.11 401.89 116.99 47017.1111 0.00 0.00

7 Stone soling work m3 0.60 2881.50 1,728.90 0.60 2881.50 1728.9 0.00 0.00
8 Formworks m3 9.20 565.00 5,198.00 9.20 565.00 5198 0.00 0.00
9 Metal gate ls 2.00 15000.00 30,000.00 2.00 15000.00 30000 0.00 0.00
10 Management Cost Job 1.00 3000.00 3,000.00 1.00 3000.00 3000 0.00 0.00
s'n /sd 336,771.87 337,897.43 1,125.56

gf]6M–n=O= eGbf a9L eP-±_ jf sd eP-–_ lrGx n]Vg].


kmf=g+= M–

s}lkmot
!= ljnsf] qmd ;+Vof M clGtd Kathekhola Rural Municipality &= ;Demf}tf ldlt M
cfof]hgfsf] gfdM u0ftGq k|f= Office of The Rural Municipality Executive
lj= tf/af/ lgdf{0f *= sfd ;dfKt ug'{kg]{ ldlt M
7]ufgf M sf=uf=kf= $ t+u|fd Bihunkot, Baglung (= sfd gfkL ePsf] ldlt M
$= ;Demf}tf g+= M Gandaki Province, Nepal e'QmfgL ef}r/ g+= M
%= cl3Nnf] e'QmfgL ljnsf] qmd ;+Vof M e'QmfgL ldlt M
^= cl3Nnf] e'QmfgL ljnsf] ef}r/ g+= M pkef]Qmf ;DaGwL lan gfkL lstfj g+= M
cfO6 cBfjlws sfd ePsf] cl3Nnf] ljnsf] r9]sf] xfn ePsf] sfd
n=O{=
d sfdsf] ljj/0f PsfO{ s}lkmot
kl/df0f kl/df0f b/ hDdf d"No kl/df0fhDdf d"Nokl/df0f hDdf d"No
g+=
1 Earthwork for MS angle m3 7.82 10.05 432.60 4347.63 10.05 4347.63

2 50*50 mm 10 gauge fencing wire purchase m2 195.00


195.00 565.00 110175 195.00 110175
3 MS angle (50*50*5) kg 668.80 668.80 96.05 64238.24 668.80 64238.24

4 Concreting work in M15 mix (c/s/a 1/2/4) m3 4.27


4.28 16086.43 68849.9204 4.28 68849.9204
5 Transportation Cost qnt/km 227.39 227.39 14.70 3342.633 227.39 3342.633

6 Reinforcement bar 10 mm dia. kg 401.89


401.89 116.99 47017.1111 401.89 47017.1111
7 Stone soling work m3 0.60 0.60 2881.50 1728.9 0.60 1728.9
8 Formworks m3 9.20 9.20 565.00 5198 9.20 5198
9 Metal gate ls 2.00 2.00 15000.00 30000 2.00 30000
10 Management Cost Job 1.00 1.00 3000.00 3000 1.00 3000
hDdf /sd 337,897.43 337,897.43
! of] lan jdf]lhd e'QmfgL hDdf ?= 337897.43 $
s§f ug'{ kg]{ ?=
@ hg;|dbfg 37897.43 s= k]ZsL
# afFsL lbg' kg]{ ?= 300000.00 11.22% v= dfn;fdfgsf] df]n
u= cGo
% v'b lbg'
k]z ug]{sf] ;xL M :jLs[t ug]{sf] ;xL M
bhf{ M bhf{ M
hDdf cIf?kL r]s g+= =======================af6 k||fKt eof] egL ;xL ug]{ .

eof] egL ;xL ug]{ .

Das könnte Ihnen auch gefallen