1. GENERAL INFORMATION ................................................................................................................................5
1.1. KION LOGISTIC CONCEPT: SHARED COMMITMENTS ..........................................................................................5
1.2. THE SIX COMPONENTS OF THE LEAN SUPPLY CHAIN .........................................................................................6
1.2.1. Lean SUPPLIERS ...................................................................................................................................6
1.2.2 Lean procurement ...................................................................................................................................6
1.2.3 Lean manufacturing ................................................................................................................................6
1.2.4 Lean warehousing ...................................................................................................................................7
1.2.5 Lean transportation .................................................................................................................................7
1.2.6 Lean customers.......................................................................................................................................8
1.3 GLOBAL COMMUNICATION ..............................................................................................................................8
1.3.1 Contacts ..................................................................................................................................................8
1.3.2 Relevant KION business units ................................................................................................................8
1.3.3 Communication means and tools............................................................................................................8
1.4 METHODOLOGY .............................................................................................................................................9
2. PROCUREMENT MANAGEMENT...................................................................................................................10
2.1. LOGISTICS AND PROCUREMENT PARAMETERS TARGETS .................................................................................10
2.2. SUPPLIER PRODUCTION SCHEDULING ........................................................................................................10
2.3. ORDERING PRINCIPLES ................................................................................................................................11
2.3.1. Transmission mode ...............................................................................................................................11
2.3.2. Order types............................................................................................................................................12
2.3.3 Order confirmation ................................................................................................................................12
2.4. GOODS-IN/DELIVERIES SCHEDULING PRINCIPLES FOR DELIVERIES DUTY PAID (DDP).....................................13
2.5 SAFETY STOCK, CONSIGNMENT AND WAREHOUSING ......................................................................................13
2.5.1 Safety stock...........................................................................................................................................13
2.5.2 Consignment stock................................................................................................................................13
3. PACKAGING ....................................................................................................................................................13
3.1 PACKAGING REQUIREMENTS.........................................................................................................................13
3.2 CONTAINER SPECIFICATIONS ........................................................................................................................14
3.2.1 Characteristics.......................................................................................................................................14
3.2.2 Identification ..........................................................................................................................................14
3.2.3 Design ...................................................................................................................................................14
3.2.4 Management process............................................................................................................................14
3.2.5 Provision/Call off ...................................................................................................................................14
3.2.6 Cleaning ................................................................................................................................................15
3.2.7 Investment/Replacement/Repair...........................................................................................................15
4. DELIVERY DOCUMENTATION .......................................................................................................................16
4.1 LABELLING ..................................................................................................................................................16
4.2 DELIVERY NOTE ...........................................................................................................................................16
Page 3 | Logistics guidelines | 17.11.2009
1. GENERAL INFORMATION
“Our values leadership, innovation and performance make us what we are”. With more than
21,000 employees, and with branches around the world, the KION Group is the European market leader
in material handling solutions and is one of the sector’s two largest internationally active companies.
The KION Group is at the forefront of its industry when it comes to quality, innovative power and profit
success.
The KION logistic concepts shown below are fundamental to the future participation of KION
SUPPLIERS in the KION lean supply chain.
The SUPPLIERS commit themselves to work in accordance with these Guidelines and to implement the
required organisation to meet the requirements listed below. These Guidelines are common to all plants
and all Group SUPPLIERS. Logistic Guidelines will be sent to all existing KION SUPPLIERS, and
potential new SUPPLIERS. Any change will be communicated to the SUPPLIERS.
KION commitments:
SUPPLIER commitments:
KION Group is focused on lean philosophy as a major driving force for improvement, and intends to
apply this principle to the whole Supply Chain.
Each step in the warehousing process should be examined critically to see where unnecessary,
repetitive, and non-value-added activities might be so that they may be eliminated.
KION Group expects value from the products it purchases and provides value to the consumers with
whom KION Group interacts.
1.3.1 Contacts
The establishment of central and local contacts between a SUPPLIER and the KION GROUP is crucial
to the durability of the business relationship, central and local contacts must be known (see appendix):
SUPPLIER:
KION expects its SUPPLIERS to provide information about
• a daily contact
• a backup contact
• the logistics and plant manager contact (for escalation purposes)
At any time, the "who is doing what" (Daily contact, Packaging, Logistics planning, Engineering Change
Request) must be known within the KION local logistics organisation and within the SUPPLIER’s
organisation.
Orders
Daily /
backlog
Weekly
Rolling forecasts
Quaterly Logistical performance.
Yearly Yearly evaluation
Specific announcements
(Holidays, large changes in forecast
requirements, phase in/out, ….)
As required
Supplier Relationship Improvement Meetings
and related action plan
Audit results
For his part, the SUPPLIER will commit himself to inform KION of any major change in his business
which could have an impact in satisfying KION Group’s needs. In any case, transparency must be a
common agreed rule.
NB:
the inability to speak and write English might bring limitations in working with the SUPPLIER
such SUPPLIERS will remain on a local basis, with no global contract
1.4 Methodology
In principle, Logistics guidelines must be agreed with new and existing SUPPLIERS at KION Group
level.
Any special, specific arrangements will have to be managed and signed directly with KION local Plants.
All relevant parameters will be summarised within the “Product Data Sheet” (see appendix). The agreed
“Product Data Sheet” will always be the one at the latest update.
Page 10 | Logistics guidelines | 17.11.2009
2. PROCUREMENT MANAGEMENT
2.1. Logistics and procurement parameters targets
For all components purchased in Europe, and in accordance with the local ABC categories as
determined by KION Group, the logistic parameters are as follows:
For all other countries, i.e. Turkey, and elsewhere in the world, logistic parameters will have to be
discussed and agreed with the departments concerned (Purchasing, Logistics) and will be governed by
consideration of Total Cost.
The SUPPLIER must guarantee permanent transparency regarding his production capacity. The
SUPPLIER is requested to commit himself to meeting any short-notice increase in requirement by KION
Group.
The SUPPLIER must guarantee that at any time of its production, it can identify its components (batch,
series, etc…).
The SUPPLIER will always apply FIFO principle to deliver KION Group.
Page 11 | Logistics guidelines | 17.11.2009
NB:
for holidays, whether or not the SUPPLIER closes, it is his responsibility to adapt his capacity in
the early months before the closure period, to meet KION Plant needs
To reach our lean targets, the pull system will be implemented wherever possible.
For EDI, the SUPPLIER will be requested to adapt his IT system in order to enable an efficient
exchange of data with the KION IT system.
The SUPPLIER must advise the KION Group of any inability to meet this request.
Page 12 | Logistics guidelines | 17.11.2009
loose orders
delivery schedules (showing firm call-offs and forecast call-offs outside the firm period)
kanban call offs
daily sequence order
Each KION local plant will normally produce and transmit its delivery schedules weekly.
Individual KION plants will issue rolling forecasts valid for 12 months. These forecasts remain forecasts
until they become firm orders in accordance with the lead-times agreed.
order frozen
quantities
150
100
50
0
W W+2 W+4 W+6 M+2 M+4 M+6 M+8 M+10
weeks/months
NB:
delivery schedules showing cumulative receipts, backlogs and forecasts are the preferred
method
SUPPLIERS are responsible for ordering their own components from their own SUPPLIERS
KION Group plants are not to become involved in this process
Page 13 | Logistics guidelines | 17.11.2009
The delivery date on the order is the date for the goods to be delivered to the plant or to the KION local
off-site store whatever the Incoterm is (same process for DDP, EXW, and other Incoterms).
For EXW Deliveries, SUPPLIER will take into account KION carrier requirements.
This stock is SUPPLIER owned, and in that case deliveries will not be EXW.
Consignment stock management rules will be specified by the KION Local Plant in agreement with the
SUPPLIER with reference to the KION Consignment Contract. The main principle will be min/max
ordering.
Changes in requirement due to KION engineering changes will be notified by the KION local plant to the
SUPPLIER at least three months in advance, in order to avoid having to scrap material.
3. PACKAGING
3.1 Packaging requirements
3.2.1 Characteristics
Standard containers must:
be based on the use of KION Plant standard containers
ensure suitable protection of the goods
be stackable
avoid the use of wooden pallets, unless of the European type with a maximum load of one tonne
avoid any repacking on site (see container coverage targets)
3.2.2 Identification
Recyclable and specific containers must be visually identified: “Plant name” and/or “SUPPLIER”.
Pool containers (standard: for example KLT, mesh crates, etc….) do not require any identification.
3.2.3 Design
Design for any specific container will have to be validated by each KION Plant.
It is the SUPPLIER’s responsibility to propose the most suitable container to prevent the goods from
being damaged at any stage during shipment, handling, and putting into store.
A packaging sheet per component will summarise and explain how to put components in the container
(see appendix for example).
3.2.6 Cleaning
The KION local Plant is responsible for cleaning containers before each shipment (elimination of scrap
and swarf).
The SUPPLIER is responsible for keeping the containers clean.
3.2.7 Investment/Replacement/Repair
Responsibility must be agreed between the SUPPLIER and the KION Plant.
Page 16 | Logistics guidelines | 17.11.2009
4. DELIVERY DOCUMENTATION
4.1 Labelling
BASIC REQUIREMENTS
Norm UCC EAN 128 or 39
Length 210 mm (see appendix)
Height 74 or 148 mm (see appendix)
Support White paper or plastified paper
Readable
Directly readable by the operator and its barcode reader
Characteristics without removing strips and packaging
Readable by the operator and by barcode reader up to one metre away.
Barcode and relevant information on a plain surface
According to KION Plants and procedure, delivery notes shall be sent either by paper or by EDI (see
matrix above for the required fields).
4.4 Notification
Standards to be used for the delivery note and the invoicing: EDIFACT, VDA 4913, 4906.... (see
appendix)
5. SHIPMENTS
5.1 Incoterms
If the Incoterm is EXW, the SUPPLIER must contact the KION Group carrier (URBAN) using the
relevant notification form to arrange collection of the goods (see appendix).
If the Incoterm is EXW, and in the case of any problem with the KION Group carrier, the SUPPLIER will
inform the KION plant in writing. The KION local Plant will feed this information into the SUPPLIER
Service Level calculation in order not to affect the SUPPLIER if the KION carrier is directly responsible.
Some other Incoterms might be used. For instance FOB (Free On Board) for Asia.
Page 17 | Logistics guidelines | 17.11.2009
NB:
the type of Incoterms does not interfere with the calculation of the SUPPLIER Service Level
a KION Plant may have several delivery addresses
The KION Group Target is to establish transparency, mutual trust, openness, fact based and 2-way
communication for business performance.
KION Group is keen on sharing data between SUPPLIERS and all KION Group local plants.
The common and shared goals of SUPPLIERS and KION GROUP should, therefore, be to:
achieve business process excellence
increase productivity and cash flow
improve operational efficiency and quality
increase SUPPLIER visibility
respond faster to change and opportunity
enable innovation
profit from a strong, flexible, lean supply chain
arrange discussions, formal feedback, performance management and recognition
The SUPPLIER is expected to deliver the right quantity, at the right time at the right quality. From the
logistics point of view, SUPPLIER performance will be evaluated on the points listed below.
LINESTOP : 30 %
• Whatever Incoterm is used, the SUPPLIER must deliver goods in time so that they arrive at the
KION plant at the receipt date stated in the delivery schedule. In case of shipment difficulties, it
is the SUPPLIER’s responsibility to inform the KION plant in writing, without delay.
• KION Plants only accept deliveries on the scheduled delivery day (D)
The delivery must be done on the right date, with the right quantity and with the correct
packaging to achieve full service level. Any partial delivery will be considered as not delivered for
the missing quantity and measured as not delivered.
Deliveries before or after D (D+1 or D-1) will be considered as not “on time”.
NB:
early deliveries are prohibited unless previously agreed in writing
for Just In Time deliveries, any delivery has to be delivered maximum 2 hours after the
requested “date + hour” to be “in time”
Any LINESTOP will be officially notified to the SUPPLIER, by mailing a request for a corrective action
plan through Linestop Notice (see appendix).
Target: NO linestop
Page 19 | Logistics guidelines | 17.11.2009
For all new components, a Product Data Sheet will be agreed between the SUPPLIER and KION Group
local Logistics in order to summarise all logistic parameters (see appendix for example):
Part N°
Designation
Delivery leadtime (to plant)
Minimum order quantity
Delivery frequency
Delivery address
SUPPLIER container type
Qty/container
Qty of container in the potential loop
Safety stock by SUPPLIER
Should any parameters change, the Product Data Sheet will be updated accordingly.
Any potential new SUPPLIER will be audited by a KION Team. The SUPPLIER Logistic Audit form is a
KION Standard.
All audit forms will be filled in and communicated in English.
The acceptance of a SUPPLIER as an official SUPPLIER to the KION Group as a whole depends upon
the results of the audit.
Page 20 | Logistics guidelines | 17.11.2009
NB:
Best and Worst SUPPLIERS of the month (from the Logistic point of view) are indicated at the
entrance of any KION Plant (see appendix).
Weight in yearly
evaluation (%)
Quality 40%
Logistics 40%
Purchasing and R&D 20%
As a result of this yearly evaluation, some SUPPLIERS might be asked for drastic improvements to
avoid suspension. Some others might be blacklisted.
Local blacklist:
action plan to be managed locally (SUPPLIER local Council)
awareness and support of SUPPLIER central Council
Central blacklist:
central decision about continuing or not with the SUPPLIER and potential consequences.
full support of SUPPLIER Group Council
action plan to be managed locally (SUPPLIER local Council)
full transparency for all KION factories
Page 21 | Logistics guidelines | 17.11.2009
NB:
any blacklisted SUPPLIER is liable to receive no further requests for any quotation from any
plant within the whole KION GROUP
any SUPPLIER well ranked in one KION Plant and badly ranked in another will be asked to
match his performance to the best level whatever the volume is
6.7.2 Shortages/Linestops
In case of shortage (production blocked because of late deliveries due to the SUPPLIER), an official
Shortage Notice is sent to the SUPPLIER (see appendix).
Any shortage attributable to the SUPPLIER may be invoiced at EUR 1250 per blocked truck
Any attributable malfunction could be invoiced to the SUPPLIER depending on the time wasted in the
KION plant for counting, sorting, etc…
Goods-in malfunctions are counted as a MINUS for SUPPLIER Logistic Performance.
7. APPENDIX
7.1. SUPPLIER Contact Sheet
7.4. Packaging
Packaging label
Pallet
Pallet
Multiple-way packaging One-way packaging
7.5. Labelling
SAMPLE
Page 30 | Logistics guidelines | 17.11.2009
7.8 EDI
Page 31 | Logistics guidelines | 17.11.2009
7.9 Abbreviations
LETTER OF AGREEMENT
Supplier name:
Name of the signatory:
On behalf of the above mentioned company, I hereby acknowledge the receipt of the KION Logistics
Guidelines (version 1.8) and commit to work in accordance with these Guidelines.
______________________
Place, Date
Supplier company stamp
______________________
Signature supplier