Beruflich Dokumente
Kultur Dokumente
End Point
8+525
Start Point
-1+700
China Road And Bridge Corporation - PT. Adhi Karya (Persero) Tbk
Joint Operation
Structures of the project JI Gentang Overpass
(STA 7+593) DED Cipeles Bridge
(STA9+090~-9+355)
JI Cipendeuy Overpass
(STA 5+683)
JI Unpad
(STA 3+909)
JI Karanganyar Overpass
Bridge (STA 8+320)
(STA7+956~8+126)
JI Cibeusi Overpass
(STA 2+575)
JI Cikeuyeup Overpass
(STA 5+399)
JI Cijotang Overpass
(STA 7+219)
JI Citeureup Overpass
(STA 6+190)
Cileunyi Intersection
(STA -0+996~-0+041)
China Road And Bridge Corporation - PT. Adhi Karya (Persero) Tbk
Joint Operation
Work Site Layout
Natio
nal
Road
Access Road 2
1
Local Road
-5
Ramp
Ramp-3
Ramp-6
Ramp-4
2
l Road
Loca
-1
Ramp
1
Road
Ramp-3
Nati
ona
Access
l Roa
d
Ram
p-2
China Road And Bridge Corporation - PT. Adhi Karya (Persero) Tbk
Joint Operation
Interchange Ciluenyi: Sta.-1+700~Sta.-0+500
There is 4 ramps, 2 accesses and 1 main bridge in this part according to the below drawings.
Access 2
Ramp 5
Ramp 6
Access 1
Ramp 3
Ramp 1
Ramp 2
China Road And Bridge Corporation - PT. Adhi Karya (Persero) Tbk
Joint Operation