Beruflich Dokumente
Kultur Dokumente
C:\Users\Chayan Bansal\Desktop\vdsfgdgedg.png
Client
Notes :
1 DIST. BOARD DB
2 TUBE LIGHT (1X40 WATT)
5 SINGLE BULB
Ht.-3'-0" Ht.-8'-0" tube light
A.C 6 WALL LIGHT
T.V. Ht.-2'-0"
Ht.-2'-0"
Ht.-3'-0" 7 6 AMPS SWITCH & PLUG POINT
T.V.
8 16 AMPS SWITCH & PLUG POINT
tube light
9 SPOT LIGHT
10 CEILING FAN
tube light
11 EXHAUST FAN
Ht.-2'-0"
14 TELEPHONE POINT
tube light
15 BELL(BAZER)
16 T.V. ANTINA
17 MC-P
Ht.-2'-0" 18 TUBE LIGHT FTL (2X40 WATT)
19 CC .TV CAMRA
20 Side Lamp
Ht.-3'-0"
T.V.
Ht.-8'-0"
A.C Ht.-4'-6"
tube light
General Notes :
tube light
tube light
Ht.-4'-6" Ht.-2'-0" 4. Any discrepancy between the architectural/
tube light
Ht.-4'-6" structural or services drawings must
be brought to attention of Architect
Ht.-4'-6"
Ht.-2'-0"
tube light tube light Ht.-8'-0"
Ht.-8'-0" A.C
tube light tube light
Ht.-4'-6" Ht.-4'-6" Ht.-4'-6"
Ht.-4'-6"
Ht.-4'-6" Ht.-3'-0"
tube light
tube light
Project :
Proposed Residential
Building at
Scale : NTS
Date : 03-Aug-2018
Drawn By : Shubham_j.
Checked By :Husain
Sheet Title
GROUND FLOOR PLAN Electrical Layout
E-01