PRELIMINARY COMPLETION/ JOINT MEASUREMENT

Date:
Contractor:
Contract:
ACECO Work Order No.:

Scheme No.: Area:


Item No. Description Unit Size Qty Comments
Installation of Ancillary Items

9.2.6 Installation of Warning Tape Mtrs.

9.2.10 Installation of LV cable cover tiles Nos.


Length Depth Width

11.1.1 Excavation in Al Ain City 3


M

NEW TRENCH

Recovery Trench

EQUIPMENT
Trench excavation (Excavation, Backfilling in Ground of any Nature
Excavate trench for rad crossing, lay PVC (Class 16) pipes, embed in concrete backfilling consolidate

11.2.1 PVC gate crossing Pipe location(1way) Mtrs.

11.2.2 PVC gate crossing Pipe location(2way) Mtrs.


Provide ducts by horizontal thrust boring including supply of PVC (Class 16) pipes
11.4.1 Thrust boring /NDRC(1 way) Mtrs.

11.4.2 Thrust boring/NDRC(2 way) Mtrs.

Removal & Reinstatement of Auxillary items as per Muncipality specifications

11.6.2 Interlocking tiles m2

11.6.4 Green Area m2

Installation of Cu Low Voltage Cable (XLPE, Steel wire armoured)

12.1.2 Laying 4 Core Cables Mtrs 4Cx240SQ. MM

12.1.3 Laying 4 Core Cables Mtrs 4Cx185SQ. MM

12.1.4 Laying 4 Core Cables Mtrs 4Cx150SQ. MM

12.1.5 Laying 4 Core Cables Mtrs 4Cx120SQ. MM

12.1.6 Laying 4 Core Cables Mtrs 4Cx70SQ. MM

12.1.7 Laying 4 Core Cables Mtrs 4Cx50SQ. MM

12.1.8 Laying 4 Core Cables Mtrs 4Cx25SQ. MM

12.1.9 Laying 4 Core Cables Mtrs 4Cx16SQ. MM


Installation of Cu. Through joint for Low voltage Cables (XLPE, Steel wire armoured)
13.2.1 ST/ Joint Nos. 4Cx240SQ. MM

13.2.2 ST/ Joint Nos. 4Cx185SQ. MM


Installation of Termination for Low voltage Cables (XLPE, Steel wire armoured)
14.1.2 4 Core Copper Cable Nos. 4Cx240SQ. MM

14.1.3 4 Core Copper Cable Nos. 4Cx185SQ. MM

14.1.4 4 Core Copper Cable Nos. 4Cx150SQ. MM

14.1.5 4 Core Copper Cable Nos. 4Cx120SQ. MM

14.1.6 4 Core Copper Cable Nos. 4Cx70SQ. MM

14.1.7 4 Core Copper Cable Nos. 4Cx50SQ. MM

14.1.8 4 Core Copper Cable Nos. 4Cx25SQ. MM

14.1.9 4 Core Copper Cable Nos. 4Cx16SQ. MM


Installation of Dismantled LV Cables & Retermenation with equip. including supply of any required accessories (if required).
14.2.1 4 Core Copper Cable Nos. 4Cx240SQ. MM

14.2.3 4 Core Copper Cable Nos. 4Cx150SQ. MM

14.2.7 4 Core Copper Cable Nos. 4Cx25SQ. MM

Recovery of Equipments/ cables

15.2.6 Recovery Of CU LV Cables Mtrs 4Cx70SQMM

Installation of Equipments
16.17 6- Way (Type-A) FP Nos.

16.18 8- Way (Type-B) FP Nos.

16.19 Service Turret Nos.

20.5 Supply of nameplates for Feeder Piller/Service Turret Nos.

20.6 Installation of nameplates for FP/ServiceTurret Nos.

16.23 1 Phase Digitel Energy meter(100A) including wiring & taggin Nos.

16.24 3 Phase Digitel Energy meter(10 - 100A) including wiring & t Nos.

16.25 3 Phase Digitel Energy meter(200 - 800A) including CT`s wirin Nos.
Three Phase Digital Energy Meters (800 A or above) with
16.26 CT's, wiring and tagging
Nos.

18.2.1 Mechanical / Digital Energy Meter Nos.

Contractor`s Representative O&M Site Supervisor LV O&M Head of Unit