Dear Sir:
This is to quote you the following scope of works to be mobilized and estimated for completion
within 15 days (for partitions and doors only) with 12 workers.
6. CHB wall Cutting and Installation of exit door and exit stair.
7. CHB wall Cutting and Installation of 2-panel glass door at GMG Bldg. main hallway.
8. Installation of Steel wide flange beams and joists for the additional steel mezzanine
floor.(to be confirmed)
9. Installation of steel plate mezzanine slab. (to be confirmed)
10. Rust protection and Painting of steel mezzanine floor. (to be confirmed)
Labor and Material Cost Estimate:
For any questions and clarifications regarding this proposal please don’t hesitate to contact us
at the contact numbers given above.
Thank you,
Christopher Marquez
CONTRACTOR
APPROVED BY