This paper consists of five questions. Attempt question one and any other Two.
(e)Explain the term “tunnelling” giving two advantages over open cut method of excavation.
(3 marks)
Question Two
(a) State three uses of a caisson.
(b) With the aid of a sketch describe a box caisson (11marks)
(c) (i)List four functional requirements of a cofferdam. (4marks)
(d) Using neat sketches, explain the construction of a crib cofferdam. (5 marks)
QUESTION THREE
(a) State Four causes of deterioration of a road pavement (4marks)
(b)Define dolphins as water front structures;
(c) Outline four types of dolphins as waterfront structures. (9marks)
(d) Explain the importance of the following in pavement construction:
i. Pavement drainage
ii. Culverts
iii. Road kerbs (7marks)
1|Page
QUESTION FOUR
(a) State five challenges encountered when tunnelling. (5 marks)
(b) With the aid of sketches describe three types of joints incorporated in concrete
construction works. (6 marks)
(c) Make five comparisons between rock tunnelling and tunnelling in soft ground.
(5 marks)
(d) State four purposes of shafts when constructing tunnels. (4marks)
QUESTION FIVE
(a) (i) List Six types of fencing. (3 marks)
(b) Sketch the sectional elevation for the following types of fencing with concrete posts:
(i)Chain link fencing
(ii)Close boarded fencing. (6 Marks)
(c) Outline the procedure of construction of footpaths using precast concrete paving
slabs. (6 marks)
(d) State five merits of precast concrete construction compared to in-situ construction.
(5 marks)