Sie sind auf Seite 1von 6

SCHEDULE OF NON-LOAD BEARING I.

GENERAL CONDITIONS
CONCRETE MASONRY UNIT REINFORCEMENT CELL GROUT CELL FILL A. ALL PERTINENT PROVISIONS OF THE NATIONAL STRUCTURAL CODE
OF THE PHILIPPINES, (NSCP C101-10), 2010, 6TH EDITION, SHALL BE
FLOOR SPECS STRICTLY FOLLOWED IN THE FABRICATION, ERECTION,
MARK VERTICAL HORIZONTAL
lm (psi) ALL CELL FILLED WITH REMARKS CONSTRUCTION & QUALITY ASPECTS OF THE STRUCTURE.
LEVEL SPECS SPECS SPECS fcm
Wm Hm Tm REMARKS CELLS REINFORCEMENT B. NO CHANGES, REVISIONS, MODIFICATIONS, ALTERATIONS,
lm (psi) fy (psi) (psi)
FILLED ONLY
AVR 1 AVR 2 AHR1 AHR2 ADDITIONS DELETIONS TO THE APPROVED STRUCTURAL PLANS,

150 mm
SHALL BE DONE, WITHOUT THE WRITTEN CONSENT OF THE
GRND 2.40 mpa 400 200 150 33,000 1:2:3 USE NON-LOAD FLOOR LEVEL
WF1
O.C. O.C.
3000 PEA GRADE YES
BEARING STRUCTURAL ENGINEER.
@ 250mm o.c.
2ND 2.40 mpa 400 200 150 33,000 3000 1:2:3 USE
YES
NON-LOAD C. THE STRUCTURAL ENGINEER SHALL NOT BE LIABLE FOR ANY
O.C. O.C. PEA GRADE BEARING
@ 125mm o.c. DEFECTS / FAILURES AS A DIRECT R INDIRECT RESULTS OF ANY
UNAUTHORIZED CHANGES IN THE APPROVED PLAN AND/ OR ANY
VIOLATION OR NON-CONFORMANCE WITH ANY SALIENT
@ EVERY RISER PROVISIONS OF THE NATIONAL STRUCTURAL CODE OF THE
PHILIPPINES, (NSCP C101-10), 2010 EDITION OR WITH THIS
TYP. CMU SIZE @ 150mm o.c. STRUCTURAL NOTES.
Wm 200

600
200 mm II. STRUCTURAL STEEL

800

400
A. YIELD STRENGTH, ASTM - 36 Fy = 284 Mpa

100
GROUND FLOOR B. SHOP DRAWING SHOULD BE SUBMITTED BY

200
CONTRACTOR/FABRICATOR TO STRUCTURAL ENGINEER PRIOR TO

70
FABRICATION WITH EMPHASIS ON THE "WORKING POINT" OF EACH
450 JOINT CONCERNED.
WALL FOOTING 1 C. TESTING OF ANGULAR SECTIONS SHALL BE DONE PRIOR TO
500 FABRICATION & RESULT SUBMITTED TO STRUCTURAL ENGINEER
TYP. PLAN & DETAIL OF WALL FOOTING 2 FOR EVALUATION.

300 mm
D. WELDING ELECTRODES OF E7011 SHALL BE USE FOR PENETRATION
1 NON LOAD BEARING WALL PURPOSES AND E7018 FOR FINISHING AND FINAL WELDING PASS.
S 1 SCALE : NTS. E. MILLER'S GUARANTEE CERTIFICATES SHOULD BE SUBMITTED TO
THE STRUCTURAL ENGINEER BEFORE ANY FABRICATION OF
ROLLED SHAPES (WIDE FLANGE) SHALL BE DONE.
MAIN BARS MAIN BARS MAIN BARS F. NON-DESTRUCTIVE TESTING OF ALL WELDS SHALL BE DONE IN THE
600 400 400
PRESENCE OF THE STRUCTURAL ENGINEER FOR EVALUTAION.
2 STAIR DETAIL 1000 mm (DRY PENETRANT METHOD).
S 1 SCALE : NTS.
III. STRUCTURAL CONCRETE
A. ULTIMATE COMPRESSIVE STRENGTH AFTER 28 DAYS-DAYS, F'c = 21
600

400

400
Mpa 3000 psi) FOR ALL FOOTINGS, COLUMNS, TIE-BEAMS, FLOOR
BEAMS, ROOF BEAMS AND SUSPENDED SLAB.
B. CONCRETE TEST SPECIMENS SHALL BE UNDERTAKEN FOR ALL
50MM MAXIMUM DEPRESSION STRUCTURES IN THE PRESENCE OF THE STRUCTURAL ENGINEER.
C. CONCRETE TESTS FOR COMPRESSIVE STRENGTH SHALL BE DONE
AT 14TH DAY AND 28TH DAY OF EACH CONCRETE SPECIMEN.
C1 C2 C3 D. CONCRETE TEST RESULTS SHALL BE SUBMITTED TO THE
T STRUCTURAL ENGINEER FOR EVALUATION.
NOTE:
T E. ALL CONCRETE POURING ACTIVITIES SHALL BE DONE WITH THE
3 CONCRETE COLUMN DETAIL CONCURRENCE3 OF THE STRUCTURAL ENGINEER OR HIS DULY
AUTHORIZED REPRESENTATIVE.
S 1 SCALE : NTS. 3T

2.80 2.50 2.30 SLAB DEPRESSION DETAIL


IV. REINFORCING BARS
300 A. YIELD STRENGTHS:
1.
2.
6 SLAB DEPRESSION DETAIL 3. TESTING OF ALL DEFORMED BARS SHALL BE DONE PRIOR TO
500

S 1 SCALE : NTS. CUTTING, BENDING AND PLACEMENT INTO FORMS.


2.50
2.80

2.30

4. ALL REINFORCING BARS SHALL BE BENT COLD.


5. CONCRETE TEST RESULTS SHALL BE SUBMITTED TO THE
2000MM
@ SUPPORT STRUCTURAL ENGINEER FOR EVALUATION.
1000MM
300 V. FOUNDATION BED
A. ALLOWABLE SOIL BEARING CAPACITY IS ALLOWED TO BE NOT LESS
100MM MAXIMUM DEPRESSION THAN 143 KPa FOR MINIMUM DEPTH OF 1.50m FROM THE FINISH
500

NGL NGL NGL


D GRADE LINE, (BASEMENT LEVEL) AND TO BE VERIFIED ON SITE BY
THE STRUCTURAL ENGINEER.
1.50

1.50

1.50

B. FINAL DEPTH OF FOOTINGS SHALL BE DETERMINED BY THE


D STRUCTURAL ENGINEER UPON PROPER EVALUATION OF ACTUAL
0.50

0.50

0.40

@ MIDSPAN FTB FTB FTB


SITE CONDITIONS.\
C. ANY ADJUSTMENTS TO THE DEPTH AND SIZE OF FOOTINGS TO BE
5 @ 100; rest @ 150mm MADE BY THE STRUCTURAL ENGINEER, SHALL BE DONE SO IN
WRITING.
4 TIE BEAM DET. 5 FOOTING DETAIL 7 BEAM DEPRESSION DETAIL D. FOUNDATION DIMENSIONS AND THICKNESS MAY BE INCREASED BY
THE STRUCTURAL ENGINEER, DEPENDING ON THE ACTUAL SOIL
S 1 SCALE : NTS. S 1 SCALE : NTS. S 1 SCALE : NTS.
CONDITION / SOIL BEARING CAPACITY OF THE FOUNDATION BED.

RVR
MS.MARLENE LAMATA,President
PROPOSED WAREHOUSE MARLEY 888 CORPORATION
COLUMN STIP MIDDLE STRIP (L1/2) COLUMN STRIP
L1/4 L1/4 short span M-
continuous
short span M-
discontinuous SCHEDULE OF SLAB

100mm
SLAB REBAR SPACING (mm o.c.)

MIDDLE STRIP COLUMN STRIP


short span M+ SLAB M-Continuous edge M+Midspan M-Continuous edge M-Continuous edge M+Midspan M-Discontinuous
exterior (middle strip) interior edge
Number short-span long-span short-span long-span short-span long-span short-span long-span short-span long-span short-span long-span
beam beam
8 L 8 L 8 L 8 L 8 L 8 L
long span M+
(middle strip) 1 100 225 200 300 375 375 175 350 300 375 375 375 30MM THK STEEL - -
short span M+ CORBEL
2 100 300 250 375 375 375 175 375 375 375 375 375 2
L1/5 (column strip) L1/5
L1 NOTE: FOR CANTILEVER SLAB, ADOPT REBAR SPACING AS FOLLOWS:

@ SECTION A-A CANTILEVER SLAB THICKNESS :100mm


0.40
COLUMN STIP MIDDLE STRIP (L1/2) COLUMN STRIP SCHEDULE OF SLAB
L1/4 short span M-
L1/4 short span M-
SLAB REBAR SPACING (mm o.c.)
BLOW-UP DETAIL (1)
( middle strip) (continuous)
short span M-
discontinuous MIDDLE STRIP COLUMN STRIP

100mm
M+Midspan M-Discontinuous
SLAB M-Continuous edge M-Continuous edge M-Continuous edge M+Midspan
edge
Number short-span long-span short-span long-span short-span long-span short-span long-span short-span long-span short-span long-span
8 L 8 L 8 L 8 L 8 L 8 L
0.40

1.30
1 100 125 125 150 125 150 200 250 300 300 300 300
long span M- short span M+ interior
exterior (middle strip) long span M- 2 125 150 150 200 300 300 200 250 300 300 300 300
L1/5 discontinuous beam continuous
beam (column strip) long span M+ NOTE: FOR CANTILEVER SLAB, ADOPT REBAR SPACING AS FOLLOWS:
(middle strip)
short span M+
L1/5 (column strip) L1/5 CANTILEVER SLAB THICKNESS :100mm

L1

@ SECTION B-B
4 CUT SECTION GRID 2
S 2 SCALE : NTS.

200
VARIES 400

BLOW-UP DETAIL (2)


4'' CHB
PARAPET WALL
BEAM BEAM
LINTEL BEAM
ROOF LONG SPAN - -
COLUMN

COLUMN
1 CONCRETE GUTTER
C-PURLINS

COLUMN
W/ WATER PROOFING

2.99
G.I. GUTTER TG3
DETAIL OF BEAM STIFFENER PLATES LINTEL BEAM
CONCRETE GUTTER WITH
WATER PROOFING
4'' CHB

1.75
0.40
6'' CHB W/ PARAPET WALL
MIN.300MM ABOVE 4'' CHB
400 PLASTERED FIN. THE ROOF PARAPET WALL
MIN.300MM ABOVE
T3 THE ROOF T3
30MM THK STEEL 30MM THK STEEL
CORBEL CORBEL

COLUMN
BEAM BEAM CANTILEVER BEAM
2.70

1.70
LINTEL BEAM LINTEL BEAM
2.82
COLUMN

6'' CHB 6'' CHB


COLUMN

0.30
COLUMN

LINTEL BEAM
LINTEL BEAM

4.50
GLASS
TYPICAL DETAIL OF TYPICAL DETAIL OF BEAM TYPICAL DETAIL OF TYP. DETAIL OF COLUMN
PLANTED COLUMN COLUMN CONNECTION CANTILEVER BEAM STIFFENER PLATES

2.80

2.80
LINTEL BEAM

6'' CHB 6'' CHB


6'' CHB W/
PLASTERED FIN.
1 COLUMN, CANTILEVER BEAM, & STIFFENER PLATE DET.
S 2 SCALE : NTS. (AA) (BB)
2 CUT SECTION GRID 1 3 CUT SECTION GRID 9
S 2 SCALE : NTS. S 2 SCALE : NTS.

RVR
MS.MARLENE LAMATA,President
PROPOSED WAREHOUSE MARLEY 888 CORPORATION
150 mm THCK
CHB WALL MAX. CLEAR CONCRETE COVER = 20mm
300mm
CHB WALL

1.15m 1.15m 1.15m

t
150mm
0.40m
MAX. CLEAR CONCRETE
1.15m

FWF FWF FWF FWF COVER = 20mm STIFFENER COLUMN


C/F C/F C/F SIZE = 150mm x 300mm
ADDITIONAL DET. FOR SLAB REINFORCEMENT
2 SHOWING MAXIMUM CLEAR CONCRETE COVER
PERIMETER FENCE PLAN S 3 SCALE : NTS.

3.00m 3.00m
DETAIL OF SC-1
0.20

EXTERIOR SPAN (L1) INTERIOR SPAN (L2) 1.61

L 1/4 L 1/4 L 2/4 L 2/4 L 3/4

2.00m
LEFT SUPPORT MID SPAN RIGHT SUPPORT
TOP BARS TOP BARS TOP BARS

150 mm THCK 150 mm THCK


CHB WALL CHB WALL 3.00max.

D
WEB BARS
(AS SPECIFIED_

STIFFENER
BEAM
B
0.40m 2.60m 0.40m 2.60m 0.40m L 1/5 L 1/5 L 2/5
MID SPAN
BOTTOM BARS L 1/5 L 3/5 SECTION @ MIDSPAN
LB-2

LEFT SUPPORT RIGHT SUPPORT


BOTTOM BARS BOTTOM BARS
PERIMETER FENCE ELEVATION
1.15 0.40 3 TYP.CONVENTIONAL BEAM DETAILS
0.15 S 3 SCALE : NTS.
0.15

0.20

STIFFENER

STIFFENER
3.00

COLUMN

COLUMN
SC-1

SC-1
1@50, 5@100, REST L CHB WALL

1@150mm O.C. @ 200mm


L/4 LOCATION FOR L/4 B
1.15

FENCE COLUMN PIPE SLEEVE


C/F O.C. B.W. TOP BEAM
0.40 STIFFENER
BEAM
LB-2
0.20

H
PLAN 1@50, 5@100, REST
1@150mm O.C.

GATE COLUMN LAYERS HORIZONTAL


0.40 N.G.L.
@ EVERY 500mm VER. TRIMMER BARS
(TOTAL OF 8 BARS)
ELEVATION
0.40

GIRDER/COLUMN
0.60

N.G.L. WALL FOOTING NOTES ON PIPE SLEEVE: 5 STIFFENER BEAM & COLUMN DETAIL
1.) MAXIMUM PIPE SLEEVE DIAMETER SHALL NOT BE GREATER THAN 20% OF THE DEPTH OF BEAM. S 3 SCALE : NTS.
@200mm O.C. 2.) PIPE SLEEVE SHALL BE LOCATED AT L/4 OR WITHIN THE MIDDLE HALF OF THE BEAM SPAN.
MAIN BARS 0.40 3.) CENTER OF PIPE SLEEVE MUST BE LOCATED AT BEAM MID-DEPTH.
1.20

1 @ 50, 5@100, REST 4.) DISTANMCE BETWEEN SUCCESSIVE PIPE SLEEVES MUST NOT BE LESS THAN 0.65M.
1@ 150mm O.C. FENCE WALL FOOTTING
(FWF)
0.24

COLUMN FOOTING
4 TYP. PIPE SLEEVE DETAILS
O.C. B.W. 1 PERIMETER FENCE DETAILS S 3 SCALE : NTS.
S 3 SCALE : NTS.
1.15 C/F SECTION

RVR
MS.MARLENE LAMATA,President
PROPOSED WAREHOUSE MARLEY 888 CORPORATION
C-Purlin 50mm x 200m x2mm
@600mm O.C. on L 38x3mm
purlin cleats
20.00 60.00
20.00
60.53
19.36 20.00
3.54 3.00 20.02
3.00 3.00 3.00 3.54
sc
4.00 3.00 3.00
21.15 RB-1
sc 3.00
2.35
sc sc 3.00
sc
sc
4.00 TG-3 RB-1
sc
RCB
sc
sc sc sc TG-3 RCB
RCB
8.00

sc

RB-1
8.00
3.00

sc
sc

3.80

2.45
sc

RCB
2.35

sc

sc
SEE DETAIL 2/S1

RCB
3.00
DECK

T-3

T-3
3.89

T-3
2.56

T-3
3.72

sc
3.00

T-3
3.00 3.00
sc

T-4
3.00 3.00

2.22
sc 3.00 3.00 3.00
8.00

sc

RB-1
sc 3.00 sc
3.09

sc sc sc
3.00 3.00 3.00 sc RCB
sc sc 3.00 3.00 sc sc RCB RCB
sc sc 3.49

2.79
sc sc
sc

sc sc sc

T-3
sc
2.35

T-3
19.06

sc
sc

T-3
2.99

sc

RB-1
T-4
20.00

9.21
TG-3

3.00
2.65

sc sc
TG-3

2.05 2.05

sc
sc
sc

sc sc

sc

2.22
TG-3
8.00

RB-1
3.00

5.43 5.43

2.78
sc sc
sc

sc

T-4
2.01 2.01 2.14
sc
2.35

sc
sc
sc

RB-1
3.00

T-3
sc
2.65

T-3
16.00

T-3

T-3
sc
16.02

T-3

T-4
sc

T-3
2.22

T-3
8.00

sc

T-3
RB-1
sc TG-2
3.00

sc sc sc
2.07 2.92 2.80 2.80 2.21

2.83
sc
2.35

sc
19.08

T-
3.00
64.85

3.00
CL

64.85

2
3.00

RB-1
2.92

2.97
20.00
sc

sc sc
2.65

sc
TG-3
3.

sc
4

C-1
1
sc

TG-3

2.20
sc
8.00

RB-1
C-1
3.00

TG-3
3.

T-2
62
sc

sc

T-4
2.37

sc
3.

T-3

RB-1
62

T-3

T-3
2.50

T-3
2.63

T-3
T-2
16.00
sc

T-3
sc

T-3
sc

T-3
2.28

T-4
3.91
8.00

RB-1
3.00

T-2
sc

3.15
sc
2.35

3.91

sc

RB-1
2.65

TG-3
sc

sc

C-1 TG-3 T-2


sc

sc sc
8.00

RB-1
sc
3.00

sc sc sc TG-3

3.29
sc

@ 15.35

13.98
sc
2.35

sc

sc

sc

sc

sc
sc

RB-1
3 EQ. SPACES @

T-2
3 EQ. SPACE

2.84
2.65

RB-1
sc
sc

T-4
1.87

T-3
sc

T-3

T-3
T-3
sc

T-3
sc

sc

T-3
sc
3.00
8.77

T-3

T-3
sc

T-4
T-2
sc

RB-1
4.42

S6
2.82

T-2

RB-1/LB RB-1/LB RB-1/LB RB-1/LB RB-1/LB RB-1/LB RB-1/LB

6.37 6.37 6.37 4.00 12.00 4.00 6.92 6.92 6.92


8.00

8.00
GENSET

@ midspan of purlins
sc

std turn buckles (top chord to


Bottom chord connection)

2 ROOF FRAMING PLAN


1 FOUNDATION PLAN S 4 SCALE : 1:250 METERS
S 4 SCALE : 1:250 METERS

RVR
MS.MARLENE LAMATA,President
PROPOSED WAREHOUSE MARLEY 888 CORPORATION
C
Note: For T-4 adopt Truss Members: Provide Gusset Plates L
same truss configuration T & BC 2 75mm x 9mm @ every joint
but change to: VWM 2 50mm x 6mm thickness= 6.00mm
TC & BC : 2 50mm x 6mm DWM 2 50mm x 6mm Min Dimension=250mm
Vwm : 2 38mm x 6mm Bracing angles: 2 25 x 3mm
Dwm : 2 38mm x 6mm

0.30 30MM THK STEEL


CORBEL

TG-3 TG-3 MIRROR IMAGE


5
8 panels @ 2.00m=16.00m C-1 8 panels @ 2.00m=16.00m C-1 @ THE OTHER SIDE
S 6
TG-3 1 TRUSS-3 DETAILS Box Purlin strut
C-1 2-50x200x2mm purlin (boxed) C
S 5 SCALE : 1:60 METERS L
T-3 T-3 T-3 T-3
Truss Members:
T & BC 2 100mm x 12mm

2.00
VWM 2 63mm x 6mm
DWM 2 75mm x 9mm
Bracing angles: 2 38 x 3mm
NOTE:
C-1 C-1 Provide Gusset plates @ every joint
thickness=6.00mm
30MM THK STEEL 20 panels @ 1.00m = 20.00m min dimension= 250mm x 250mm
CORBEL
2 TG-3 DETAILS
BLOW-UP DETAIL S 5 SCALE : 1:60 METERS
(verify architectural)

TG-1
TG-2 Truss Members:
TG-1

0.30
1.50

TG-2 Top & bottom chord :

0.20
1.00
2 50mm x 6mm
Vertical web members :
C-1 2 38mm x 6mm
C-1 C-2 C-3 Diagonal web members :
(verify architectural)
(verify architectural) (verify architectural) 2 50mm 6mm
(verify architectural) (verify architectural) Bracing angles: 2 25 x 3mm
NOTE:Gusset plates are not necessary
Truss Members: NOTE:
Top & bottom chord : 2 75mm x 9mm Provide Gusset plates @ every joint 3 TRUSS 2- DETAILS 5 TRUSS-1 DETAILS
Vertical web members : 2 50mm x 6mm thickness=6.00mm S 5 SCALE : 1:60 METERS S 5 SCALE : 1:60 METERS
Diagonal web members : 2 50mm 6mm min dimension= 250mm x 250mm
Bracing angles: 2 25mm x 3mm
Truss Members:
T-1 T-1 T-1 T-1 T-1 T-1 T-1 TG-2 TG-2 TG-2 Top & bottom chord : 2 75mm x 6mm
Vertical web members : 2 50mm x 6mm
Diagonal web members : 2 63mm 6mm
Bracing angles: 2 38 x 3mm

C-3 C-3
C-1 C-1
(verify architectural) NOTE:Gusset plates are not necessary
(verify architectural)
4 TG-2 DETAILS 6 TG-1 DETAILS
S 5 SCALE : 1:60 METERS S 5 SCALE : 1:60 METERS

RVR
MS.MARLENE LAMATA,President
PROPOSED WAREHOUSE MARLEY 888 CORPORATION
21.15 PARAPET 0.30 0.30
WALL
0.55

0.40

0.40
1@ 50; 10@ 100; 10
150 M REST @ 280
CONCRETE
0.10 0.40 GUTTER

0.15 0.15
TRUSS

0.40

0.40
2@ 50MM : 9@100MM
REST @125MM
8.00

RB
SEE
CORBEL 0.25 0.25
DETAIL
CHB

1.10

0.50

0.50
LINTEL
BEAM(LB)
0.40

0.30
DOOR
HEADER

0.40
5.20
0.25 0.25
C3-F3

0.50

0.50
1 MECHANICAL ROOM FOUNDATION PLAN

2.80
S 6 SCALE : 1:100 METERS GLASS PANEL

0.25 0.25

0.45

0.45
MALL F.F.L
2 BLOW - UP PLAN @ MAIN ENTRY
S 6 SCALE : 1:100 METERS 3 BLOW - UP DETAIL CONNECTION @ MAIN ENTRY
S 6 SCALE : 1:25 METERS

4.42
S6
2.82

6.37 6.37 6.37 4.00 12.00 4.00 6.92 6.92 6.92


8.00

RVR
MS.MARLENE LAMATA,President
PROPOSED WAREHOUSE MARLEY 888 CORPORATION

Das könnte Ihnen auch gefallen