Sie sind auf Seite 1von 2

PERFORMANCE REPORT

Thailand: RHADIANT fluid system provides


stable properties in ultra-HTHP environment
“In the presence of ultra-HTHP conditions, RHADIANT† fluid system
performs when conventional drilling fluids cannot. The RHADIANT fluid
system met all operator KPIs for the well.
Shawn French, Business Development Manager

Well Information
Location ........................................................................................................................................................................................... Offshore, Gulf of Thailand

Well type .................................................................................................................................................................................................................Gas producer

Hole size ......................................................................................................................................................................................................................... 6 1/8 hole

Open interval length............................................................................................................................................................................. 4,043 ft (1,232.6 m) MD

The Situation
Operators working in the Gulf Of Thailand have many obstacles to deal with. High ROP, acid gases, and extreme temperature gradients
are just a few of the issues in the area. Bottom Hole Static Temperatures (BHST) in excess of 450° F (232.2° C) can wreak havoc on a
drilling fluid system and cause numerous days of NPT along with poor quality well logging data.

The Solution
The RHADIANT fluid, the new ultra-HTHP non-aqueous drilling fluid from M-I SWACO, was the perfect solution. The RHADIANT fluid
system was lab tested to 150° F (232° C), and put to use in the field for another operator in the area. The performance on this well was
just as outstanding as on previous wells. The RHADIANT fluid provided a quality wellbore, and allowed logging without issues at BHST
of 428° F (220° C).

The Results
The RHADIANT fluid with Sarapar-147 base fluid confirmed the expected performance, delivered excellent filtration control and filter
cake quality with stable rheological properties while drilling the 6-1/8” interval. Good hole condition was recorded while tripping several
times with minimal tight spots. Hole cleaning was able to reach and maintain the optimum range with good drilling practices. Six RPM
of 10 - 12 provided good to very good hole cleaning according to VIRTUAL HYDRAULICS† simulation. Addition of different sizes of
Lost Preventive Material (LMP), including G-SEAL PLUS† and G-SEAL HRG FINE† graphite products, to the active system successfully
controlled seepage losses through the expected weak formation on bottom parts of the well. This graphite also helps to avoid excessive
torque and drag.

The trips were smooth and the open hole wireline logging (three runs in total) were performed with minimal issues for over 20 hours of
static condition comparing with wells with the same temperature range.
The Details
The logging runs were successful due to great filter cake quality and good rheological properties provided by the RHADIANT system.
Below are the comments and BHST from the logging runs. Also shown are the six RPM and the LGS of the fluid for the open hole section
of the well.

Logging Comments

TD Depth Logging Comments

13,387 ft (4081 m) HSFT Tool went down to bottom. Max BHST – 410° F (210° C)

14,000 ft (4268 m) Quad Combo Tool went down to bottom. Max BHST – 420° F (215.5° C)

14,000 ft (4268 m) HSFT Tool went down to bottom. Max BHST – 428° F (220° C)

Rheological Properties

Depth (ft./m) MW (ppg) PV (cP) YP (lb./100ft2) Gel Strength (lb./100ft2) 6 RPM

12,173 ft (3,711.3 m) 13.4 38 18 11/21/25 11

12,787 ft (3,898.5 m) 14.0 39 19 12/23/28 12

14,000 ft (4,268 m) 14.4 42 20 11/20/24 11

Summary
RHADIANT fluid thermally stable drilling fluid to greater than 450° F (232° C).

■■ HTHP interval successfully drilled with no NPT


■■ Good wellbore was recorded while tripping with no tight spots
■■ No NPT recorded during the logging operations

Questions? We’ll be glad to answer them.


If you’d like to know more about our RHADIANT and how it’s are performing for our other customers, please call the
M-I SWACO office nearest you.

This information is supplied solely for informational purposes and M-I SWACO makes no guarantees or
P.O. Box 42842
warranties, either expressed or implied, with respect to the accuracy and use of this data. All product Houston, Texas 77242-2842
warranties and guarantees shall be governed by the Standard Terms of Sale. Nothing in this document
is legal advice or is a substitute for competent legal advice.
www.miswaco.com
Email: questions@miswaco.slb.com
©2012 M-I L.L.C. All rights reserved. †Mark of M-I L.L.C.
FPR.1851c.1208.R1 (E)

Das könnte Ihnen auch gefallen