Sie sind auf Seite 1von 2

RATING

100% 90% 80% 70%

95% 85% 75% 65%


CHECK LIST (Completion Team)

S.No.: 1548 Dwg.No: 130000 Dwg.Name: Builder's Name


Type of Vessel: 82BC Class: NK G/A AND CAPACITY PLAN TSC
Std. Manhour: C1 spent for Preparation: C2 spent for Checking: Re-Work hours: Submission date:

STAFF
Forms according to Owner's requirement. C1 C2
What Ship No. was diverted?
1
-->
All the items mentioning in G/A for working plan mention it.
-->Tank boundary line, Tank name Bilge well, Suction well, Hold ladd.,
2 Rudder trunk, Mooring equipment and size, Draft in front view,
Turning diameter of deck crane and Other dimensions

Strength and Hold γ of each part (To be written IACS UR21, only sea load on
3 hatch cover)
-->
Hold & Tank Capacity Table (Hull & Mach)
4
-->
Confirmed the style of particulars if for Finished Plan Style
Principal particulars, date of Keel laid, Launched, Delivered.
-->

Confirmed the Hold capacity output if Grain Loading type not Bale of No. of Cars
5
Confirmed the list of COMPLEMENT in P.P. if same from room name
arrangement in acc.
D/W values in case of Multi FBD.
--> ______________________________
Confirmed freeboard (To be solid line at delivery, others dashed line in case of
6
Multi-freeboard)
7 Confirmed that should not included the D/W table and manhole basically.
Confirmed if D/W of D/W scale calculated using the final D/W.
(It should attach input data sheet in IPCA with this check list)
8
Adjust unit length of D/W scale.(5mm or 1cm) Delete row of displacement and
-->not yet calculated
Compute the correct air draft.
9
-->_________ meters from B.L.
Added items to fitted by owner's request / rule requirements.
10
-->Helicopter Landing Mark
To be include in the drawings following items:
Deck : Bulk Carrier
-->Ship name, Marks on shell, Fittings of hold access, Rail of side rolling, Pump
of mooring machineries, Stage for windlass, Rack for side rolling when cover
opened.
Deck : Tanker.
-->Not Applicable
Deck : PCC
11
-->Not Applicable
Accommodation :
Ship name board, Windows(front, side), Funnel mark(front, side) Clear view
screen, Ladder for boat davit, Name of each cabins & stores(No., Shelves &
linings in Bos'n Store & Steer. Gear RM.), Folding antenna
E/R :
Boiler, Exhaust gas economizer, Generator engine, Small tanks (to be deleted
name which no mentioned in tank capacity table)
To be written W.B. IN PORT USE to profile & bottom plan.
12 To be written height, capacity W.B. in port use to under CAPACITY PLAN.
-->
Items to be deleted:
Center line & points of machinery & out fittings (esp. chair, toil.)
Curtain of windows and bath except for accordion curtains.
Storm rails, door closer, shoes mats.
13
No. & name of wall vent., goose neck vent., mechanical vent.
Stages between decks in E/R (ladders between decks to be written)
Cross line of control room, store and work shop in E/R.
Deck side line in deep tank.

To be attached the result of checking of design document (DB)


14
modification list at sign up.
15 Rudder bulb to be mention on profile view
To be confirm whether if there are Owner's special requirement.
16
(Sample; Dimensions of SC213)
17 Confirmed the front view, plan view, and side view.
18 Attached & checked Design Input List & Feedback List

Additional, Modifications, Revisions and Etc.

Comment Detail

LEGEND:
C1: DRAWER:  -- OK
X -- With comment
O -- Comment rectified
P -- Pending
C2: CHECKER:

C3: APPROVER:

Das könnte Ihnen auch gefallen