Sie sind auf Seite 1von 5

ERICSON C.

LLAGAS
ericallagas123@yahoo.com
Tamalan St. Pinugay Rd.,
Brgy. Rizal, Baras, Rizal
09502603018/09387260586

SUMMARY OF WORK EXPERIENCE:

POSITION : PIPING/MECH FOREMAN


PROJECT LOC : PETRO, RABIGH K,S.A
EMPLOYER : AL ROBAYA HOLDING COM
DURATION : SEPTEMBER 24,2014 UP TO FEBRUARY 28,2019

DUTIES & RESPONSIBILITY:


- Maintenance work of petro rabigh.
- Ability to read drawings isometric, diagram piping plan.
- Ability to execute piping installation/erection.
- Executing structural fabrication/ different location at refinery plant.
- Involve of fabrication work. Pipe rack, reactor, structure equipment, support structure,
plate, beam, columns bracing, handrail, ladder panel and module.
- Involve of shutdown work, blinding flange, hot bolting, hydro testing, values removable,
exchanger vessel opening.
- Involve of maintenance job, steam line process line to do reinstallation due to leaks and
corroded.
- Ability to handle power tools/mechanical tools.
- Ability to handle any task of work day and day activities.
- Involve of installation pipe line, wellhead and modular skid.
- Handle of work permit certification outside pipeline.
- Handle of permit certification inside plant under oil and gas plant.
- Involve of erection chiller and air handling unit. (AHU)
- Check routing line as per drawing in and out service water line.
- Involve installation fire fighting water line/ sprinkler system
- Installation bolt require Turk as per client recommendation.

POSITION : HVAC PIPING SUPERVISOR


PROJECT LOC : BOROUGE 3 PROJECT, HIGH DENSITY POLYETHLYNE
CLIENT : KENTECH INTERNATIONAL LIMITED, ABU DHABI UAE.
DURATION : MAY 25, 2012 UP TO SEPTEMBER 2014
LOCATION : RUWAIS ABU DHABI, UAE
DUTIES & RESPONSIBILITY:

- Scheduling of work priorities in sequential order.


- Planning allocation of manpower, materials and equipment.
- Planning of all types chilled water lines, process lines, utility lines, and fire fighting line
equipment.
- Supervision of piping pre-fabrication, loading/unloading, erecting, installation.
- Handling of complete documentation and record keeping.
- Review of method statement, piping plan, procedure and requirements.
- Supervise carry out the witness inspection and surveillance.
- Establish and adjust work sequences to keep construction schedule.
- Trains and supervise workers on company policy regulation and installation procedure.
- Carries out the work in the planned time & cost.
- Permit to work updated day and day activity.
- Process report day and day monitoring, quality standard and respected.
- Support the superintendent solving technical and management problem encountered in the
area responsibilities, like site instruction as built drawing, clashing, modification, etc.
- Conduct safety toolbox talk regarding daily activity.

POSITION : PIPING FOREMAN


PROJECT LOC : KAHRAMA WATERLINE QATAR
CLIENT : KHARAMA, QATAR
EMPLOYER : BOOM CONSTRUCTION COMPANY
DURATION : AUGUST 20,2011 UP TO MARCH 2012

DUTIES & RESPONSIBILITY:


- Installation of ductile pipe prior of mainline pipe.
- Excavation of trench prior to installation of ductile pipe (mainline)
- Secure varies safety precaution at main road.
- Day and day safety toolbox talks prior to free hazard.
- Manages worker, motivating to complete schedule.
- Maintain equipment and manage paper works.
- Ensure labor and other resources necessary.
- Excellent knowledge of construction operation and equipment.

POSITION : SENIOR PIPING FOREMAN


PROJECT LOCATION : OIL RIG. 02 ODEBRECHT AND RIG. 03 DELBA II
CLIENT : SEM OFFSHORE CONTRACTORS, INC.
EMPLOYER : KENTECH INTERNATIONAL LIMITED ABU DHABI UAE.
DURATION : SEPTEMBER 28 2008 UP TO JANUARY 15 2011
LOCATION : MUSSAFAH GPC DRY DOCK, ABU DHABI, UAE.
DUTIES & RESPONSIBILITY:

- Planning and scheduling depend on daily task.


- Responsible to inspect, materials as per specification.
- Flange rating correct, materials correct.
- Branches located correctly.
- High point vent installed, low point drain installed.
- Reducer correctly located.
- Items to be checked on instrument equipment.
- Correct all valve installed (control valve)
- Check flow direction.
- Check pipe spool cleanliness at the close of work confirm open ends are sealed.
- Line checking and punched cleared.
- Conduct daily toolbox talk before start the work
- Responsible to make daily time progress report as per joint fit up erection of spool.
- Involve of installation tubing 12mm dia to 38mm dia inch tubing work on hydraulic bending.
- Coordinate the client regarding inspection.

POSITION : PIPE FITTER


PROJECT LOCATION : KORSAKOV, SAKHALIN ISLAND RUSSIAN FEDERATION
CLIENT : CTSJ CHIYODA TECHNIF
EMPLOYER : DAEWOO ENGINEERING AND CONSTRUCTION CO., LTD
DURATION : AUGUST 10,2006 UP TO JUNE 28, 2008
LOCATION : SAKHALIN RUSSIA

DUTIES & RESPONSIBILITY:

- Check isometric drawing


- Involve of fit-up heavy wall ss pipe tie in connection of vessel.
- Preparing of pipe spool.
- Cutting, grinding and welding.
- Check isometric orientation.
- Check support location.
- Fit up pipe spool as per isometric drawing.
- Check orientation of valve location as per drawing.
- Check pipe spool as per need the drawing.
- Understand cutting and grinding.
- Understand permit to work system.
- Understand fire watcher and high elevated work system.
- Understand safety rules and regulations.
- Mandatory safety tool box talk before start of work.

POSITION : LEAD MAN PIPING


PROJECT : YANPET DBN-1PROJECT
CLIENT : FLOUR ARABIA, LIMITED
EMPLOYER : MS AL SUWAIDI
DURATION : DECEMBER 05 2004 UP TO APRIL 21, 2006
LOCATION : YAMBU SAUDI ARABIA

DUTIES & RESPONSIBILITY:

- Preparation of pipe spool.


- Cutting, grinding and welding.
- Check isometric orientation.
- Check support location.
- Fit up pipe spool as per isometric drawing.
- Check orientation of valve location as per drawing.
- Check pipe spool end to end close of cover
- Preserve pipe spool location and cleanliness.

POSITION : PIPE FITTER


EMPLOYER : AM SARMIENTO
CLIENT : SHELL PHILIPPINES
DURATION : JANUARY 1997 UP TO 1999
LOCATION : PILILLA, RIZAL

DUTIES & RESPONSIBILITY:

- Preparation of mechanical power tools and hand tools.


- Check isometric drawing.
- Check pipe spool as per need the drawing,
- Understand cutting and grinding.
- Understand permit to work system
- Understand the watcher and high elevated work system.
- Understand safety rules and regulations.
- Mandatory safety tool box talk before start of work.

PERSONAL DETAILS:
AGE : 45 years old.
DATE OF BIRTH : December 21, 1972
HEIGHT : 5ft. 8 inch.
WEIGHT : 72kg.
NATIONALITY : Filipino
RELIGION : Roman Catholic

EDUCATIONAL BACKGROUND:

EDUCATIONAL LEVEL:
University of Rizal System
2 years Automotive
GRADUATED

Morong Rizal, Ph
Graduated (1991-1992)
Seminar Training
Swagelock Tube Fitting Installation and Safety

Rizal Technological Polytechnic Institute, High School


Secondary Level

Morong Rizal Ph.


Graduated
1999-1990
Welding, Driving and Carpentry works

Das könnte Ihnen auch gefallen