Sie sind auf Seite 1von 2

Bridge Weight Restrictions

& Logistical Challenges

F
or more than 35 years,
Fibrebond has been a leading
ARK
Map Legend

manufacturer of integrated
Route to Texas
(additional 247 miles traveled to Texas)

equipment enclosures for


Bridges/Roads with
Restricted Weights Limits

telecommunications, data center, Haynesville


Interstates
Plain Dealing

and power industries. Some of the


Highways
Vivian
Sarepta
Fibrebond Headquarters Bernice
world’s largest companies visit Homer
Farmerville
Northwest Louisiana each year to
Lake
Clairborne

Minden
Caddo

utilize Fibrebond’s products and


Lake

Shreveport
services. Marshall
Arcadia
Bossier
City Ruston
In recent years, challenges with
our regional infrastructure have
TX Lake
Bistineau Ringgold

restricted our ability to ship


Jonesboro
Carthage
products from our Minden, La., Mansfield
facility into Texas. The route Coushatta

indicated on this map in orange Tenaha


Winnfield
shows the only route available for
Fibrebond to move products from Center
Natchitoches
our primary production facility in
Minden, La., into Texas and other
project locations to the West. Catahoula
Lake

use this route, which takes us


We are located approximately 44 approximately 100 miles off route.
miles from the Texas state line,
but due to bridges with weight When we depart our facility, we
restrictions, we currently have to must travel west on Hwy 79/80
travel 247 miles in Louisiana in to Dixie Inn, La. We cross three
order to enter Texas. The orange bridge in route to Dixie Inn, and
dots on this map indicate bridges should state/federal agencies place
with weight restrictions that restrict restrictions on any of these three
travel going in all directions. bridges, we will have no routes out
of Minden. Fibrebond would be
Additionally, in order for us to entirely restricted from shipping
ship products south, we must projects to any customer.

1300 Davenport Drive | Minden, LA 71055 | 318.377.1030 | www.fibrebond.com


Options for Travel
1 Build a connector road from
eastern end of Davenport
Drive to Hwy 371.

BENEFITS
• Direct route. Minden
• Additional economic
development.
Davenport Drive Extension Option
POWER

• Most Fibrebond
employees and all of
FWM Mechanical Inc.,
employees would have
MAIN
WAREHOUSE
PAINT

two points of access.


Currently must exit across
a single, active rail line. Map Legend

Davenport Drive Extension


(proposed addition option )

REQUIREMENTS Interstates

Highways

• Build connector road. Fibrebond Headquarters

• Repair bridge in Sibley to 1


allow continuous access
to Coushatta, across Red
River and then direct US Hwy 80 Bridge
route West.
POWER
Minden
2 Repair US Hwy 80 Bridge to
MAIN
WAREHOUSE
PAINT

Dixie Inn
allow access out via Erwin
Thompson Drive. Bridge was
derated in 2015. Repair US
Hwy 371 Sibley Bridge to
allow access via 371 South.

Map Legend

Bridges/Roads with
Restricted Weights Limits

Interstates

US Hwy 371 Sibley Bridge Highways

Sibley Fibrebond Headquarters

1300 Davenport Drive | Minden, LA 71055 | 318.377.1030 | www.fibrebond.com