Beruflich Dokumente
Kultur Dokumente
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
Customer: Nomac
Rev. No.
Name
Date
Sign
Page 1 of 8
METHOD STATEMENT OF GATE Affective
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
TABLE OF CONTENT
3. Responsibilities...................................................................................................................3
4. Equipment’s........................................................................................................................3
8. Inspection for the Gate Valves ......................................... Error! Bookmark not defined.
Page 2 of 8
METHOD STATEMENT OF GATE Affective
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
1. Scope of Work
The purpose of this Method statement is to provide a controlled procedure for overhauling and
testing of gate valve in line with industry standards.
3. Responsibilities
A. Test Engineer
Coordinates with the client. Supervises the overall activities. Allocating time for each job and
maintaining the outage time
B. Supervisor
Identifying the nature of repair work to be carried out. Execution of job. Maintaining the right
methodology of work. Coordinating work, the technicians and the engineer. Recording all the
work carried out.
C. Technician
4. Equipment’s
Lapping machine
Multimeter
Hart Communicator.
General Spanners
Box spanner
Chain Block
Page 3 of 8
METHOD STATEMENT OF GATE Affective
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
Eye bolt
Torque wrench
Gland puller
Seat ring puller
V block
Magnetic stand
Dial gauge
5. Consumables
6. Type of Actuator
7. Precautions
Before dis assembling the valve , make sure there is no pressure in the valve body.
Removing the packing without removing the actuator is difficult and is not recommended
Do not try to blow out the old packing rings by applying pressure to the lubricator hole in
the bonnet.
Careful that the stem threads do not damage the packing rings
Stem threads should not be damaged while working
While boxing up make sure the inside should be free of foreign particles which will
damage the seat
Page 4 of 8
METHOD STATEMENT OF GATE Affective
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
i. Initial Functional Test
Actuator functional test is carried out first. The actuator will be given min and max
operating pressure. The findings will be recorded
Stroke test is carried out for positioners and the travel of the valve stem is noted at open
and close by giving 4-20 mA signal through the feeder.
ii. Disassembling
All the parts will be carefully inspected and the inspection findings will be entered in the report.
Necessary repair work will be carried out.
a) Internal Inspection
Page 5 of 8
METHOD STATEMENT OF GATE Affective
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
b) Body inspection:
External and Internal body is carefully examined for cracks and cavitation.
Examine seat pocket area.
Examine gland area and gland packing. Replace gland packing if necessary.
Examine gland studs, gland follower, gland bush.
Examine all the greasing point and apply grease where ever necessary.
Examine body studs and nuts.
c) Actuator Inspection:
All parts will be placed in separate trays. Trays will be tagged by the valve tag No or serial number
for identification. Heavy valve body will be placed in separate stand in upright position.
Page 6 of 8
METHOD STATEMENT OF GATE Affective
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
a) Cleaning
All the parts will undergo cleaning by using appropriate cleaning agent.
b) Soft spares:
Bonnet Gasket
Packing
c) Assembly
d) Final Testing
Actuator functional test is carried out first. The actuator will be given min and max
operating pressure. The findings will be recorded
Record the readings for full open and full closing for the valve
The findings will be recorder in test report.
Page 7 of 8
METHOD STATEMENT OF GATE Affective
Date
VALVES AUG 19, 2019
Project Title Document
Code
SHUQAIQ IWPP ARC-102-MS-002
Page 8 of 8