REPORT OF EXAMINATION EP200703201165

Vessel, Tank, Heat Exchanger Report No. TA-V-1456

Date of Examination: 03/03/07 Installation/Site: Tern Alpha F/Loc: GB.TEA.TA-E-92106

Equipment Description: Heat Exchanger for Mud Pumps (M7 Sack store) Tag No: E-92106
Unique No: 30103-36890

Type of Inspection Performed: WI/ Attention lists used: SAP Maintenance Plan: N/A
Internal / External Visual Appendix 3.1 Work Order No: Opportune

Date of Construction: Design code: Type of last inspection: Date of Last Report: Safety Critical Element:
2001 Unknown Unknown Unknown Yes / No / N/A
Report on Condition:
External
Alpha Laval (Type M10 B70) Heat Exchanger. No specific Tern ID found for this equipment.
External shell is carbon steel and painted.
No mechanical damage noted to external shell.
2 x Inlet and Outlet nozzles are carbon steel and in good condition with no corrosion evident.
2 x Inlet and Outlet nozzles are Cunifer and in good condition with no corrosion evident.
Vessel supports are carbon steel painted and in good condition.
2 x End Plates are carbon steel, painted and in very good condition.
The Temperature gauge located on nozzle (S1) is broken.
Earthing bond fitted and secure.
ID plate clear and in good condition.
Limitations: None
Internal:
Both end plates are in very good condition with no pitting or corrosion noted.
All Inlet/Outlet nozzles internally are in good condition.
Limitations:

Tube side: N/A.


Limitations:
Level trim / Fittings
Heat exchanger is fitted with Titanium plates, in good condition at time of inspection.

Limitations:
Safety Relief Valve Details: N/A

W.T. measurements: See NDT Report: - N/A Remaining Corrosion Allowance: N/A

Procedure / limitations: N/A


MCDR N/A SAP Notification No. N/A

Inspector Remarks:
In good order at the time of inspection, fit for continued service.
No record offshore of previous inspection.
Remedial Action Required Due Date for
N/A Completion N/A

Next Inspection due on or before N/A Change of Inspection Interval? Yes/No

Are any changes required to the Written Scheme of Examination? (UK Onshore Plants only): Yes / No

Signed: (Authorised Inspector) Date Reviewed and Approved: (Sen. Inspection Date
Engineer (Area inspector)
Jonathan Press 04/03/07 Martin Broomfield /
Alan Standerwick