Transmittal / Document Title MSD - Central Battery System Status Code Code 3
Disclaimer : Permission to proceed does not constitute acceptance or approval of design details, calculations, analyses, test methods or materials developed or selected by the subcontractor/supplier and does not relieve subcontractor/supplier from full compliance with contractual obligations or
release any "holds" placed on the contract.
BACS Status Codes : 1 - Work may proceed; 2 - Revise and Resubmit. Work may Proceed Subject to Resolution of Indicated Comments; 3 - Revise and resubmit. Work may Not Proceed; 4 – Review Not Required. Work may Proceed; Rejected – Rejected. Work may Not Proceed
RMTC Status Codes : A - Reviewed; Work may proceed; B - Reviewed with comments; Revise & resubmit. Work may proceed subject to incorporation of comments; C - Objection; Revise & resubmit; Work not proceed; D - Rejected; E - Review not required; Work may proceed
Note to Supplier/Subcontractor: Approval coding by BACS is for information only. Final approval to be provided by RMTC.
BACS Review
No. Document Number Rev BACS Comments (Designer, ICE, other) Comments Made by Initial Status Supplier / Fabricator / Subcontractor Response Responded By Revised Status
6 002 All BMS and FA cable trays are to be cable trunks. Najib Khneisser Code 3 Complied
7 002 Cable containment must be coordinated with all MEP services. Najib Khneisser Code 2 Noted & Complied
8 002 The text in the drawings need to be clearer. Najib Khneisser Code 2 Noted. The issues related to presentation are improved in this revision
10 001 The text in the drawings is not very clear. Najib Khneisser Code 2 Noted. The issues related to presentation are improved in this revision
Proper shop drawing for the electrical rooms shall have more
details. Ex: panels shall be drawn in its full details including
complied and please refer M-BNR-1F8DS0-CELD-SDR-040331, M-
11 001 showing all compartments, dimensions, … Najib Khneisser Code 3
BNR-1F8DS0-CELD-SDR-040332
M-BNR-1F8DS0-CELD-SDR-040310 This drawing just shows a representation of the room and cannot
M-BNR-1F8DS0-CELD-SDR-040311 be viewed as an electrical room shop drawing.
The panel boards in the electrical room should be drawn as per
complied and please refer M-BNR-1F8DS0-CELD-SDR-040331, M-
12 001 panel selection in the shop drawing. Do we have selected Najib Khneisser Code 3
BNR-1F8DS0-CELD-SDR-040332
panels?
These sections are unacceptable:
- section just exported from revit with no adjustments Many sections with the required information had been added in each
13 001 Najib Khneisser Code 3
- trays, trunks and supports should be drawn as per actual floor in order comply with BACS requirments
M-BNR-1F8DS0-CELD-SDR-040312 selection. (proper shop drawing)
M-BNR-1F8DS0-CELD-SDR-040313
M-BNR-1F8DS0-CELD-SDR-040314 Minimum clearance between layers of 250mm should be
14 M-BNR-1F8DS0-CELD-SDR-040315 001 between the top of the tray in the lower layer to the bottom of the Najib Khneisser Code 3 Complied
tray in the upper layer.
15 001 The text in the drawings need to be clearer. Najib Khneisser Code 2 Noted. The issues related to presentation are improved in this revision
Please
RMTC Review Required Yes/No
Select
RMTC Review
1 Please Select