17,090,054.68 8,474,668.37
11,629,263.87 1,612,326.58
180,000.00 -
28,899,318.55 10,086,994.95
Project : Pacific Terraces Community - East CP13 Included to Contractor but Supplied by ACM
Locaton : Brgy. Carsadang Bago, Imus, Cavite
Owner : ACM Landholdings, Inc.
Subject : HOUSING
Date : July 22, 2019 Last Billing Forwarded to Makat
Date : July 19, 2019 Last Billing Released
Date : June 14, 2019 Last NOA
%
(to date)
Original Budget Budget Contractor NOA/Variation Accomplishment
(to date) Date (Billed)
FINLAY * 100.00%
FINLAY 16-Sep-17 100.00%
R2A 6-Sep-18 68.78%
GALACIANS 24-Jan-19 DP
DIANE'S GARDEN 30-Jan-19 DP
FINLAY 13-Feb-19 23.93%
- -
Additive Deductive
Contract Amount Description Amount Description
28,727,811.17
395,553.26
1,032,684.53
355,000.00
530,000.00
747,083.93
31,788,132.89
- -
26,837,177.23 26,221,817.41
26,837,177.23 26,221,817.41
57.97%
80.00%
55.00%
Project : Pacific Terraces Community - East
Locaton : Brgy. Carsadang Bago, Imus, Cavite
Owner : ACM Landholdings, Inc.
Approved Budg
Item No. Item Description
CLARA-INNER
I. GENERAL CONTRACTOR
CP01 CSA, Mechanical, Electrical, Plumbing and Sanitary 767,778.40
II. SPECIALTY CONTRACTOR
CP02 Supply and Installaton of Roofing Materials 46,269.05
CP03 Supply and Installaton of Aluminum Glass Doors 79,156.69
CP04 Paintng Works 160,107.96
CP05 Supply and Installaton of Metal Stairs and Railings 61,069.59
III. OWNER SUPPLIED MATERIALS
CP06 Supply and Delivery of Wood Doors and Jambs 28,178.72
CP07 Supply and Delivery of Jackbilt Modular Blocks 91,344.57
CP08 Supply and Delivery of Ceramic Tiles 35,332.43
CP09 Supply and Delivery of Vinyl Tiles 8,985.02
CP10 Supply and Delivery of Electrical Devices and Accessories 13,212.47
CP11 Supply and Delivery of Plumbing Fixtures and Fittings 30,641.31
CP12 Supply and Delivery of Septc Tank 12,353.19
CP13 Supply and Delivery of Door Hardwares and Accessories 5,304.60
CP14 Supply and Delivery of Kitchen Sink and Faucet 7,830.90
CP15 Supply and Delivery of Domestc Water Pipes (Straight Pipes) 1,256.95
CP16 Supply and Delivery of Cement 88,993.73
CP17 Supply and Delivery of Rebar 111,825.77
TOTAL 1,549,641.35
COST COMPARISON
Approved Budget 1,549,641.35
Proposed Award Cost 1,350,256.10
Variance 199,385.25
Approved Budget (Revised) 1,549,641.35
Proposed Award Cost (Revised) 1,350,256.10
Variance (Revised) 199,385.25
LUCIA MODEL
18,707.87
151,013.76
58,040.35
17,324.00
12,892.53
257,978.51
Proposed Award Cost
ASSIGNED
LUCIA-INNER LUCIA-CORNER