Sie sind auf Seite 1von 4

TAGUM CITY, DAVAO DEL NORTE

ITEM – I EARTHWORKS

A. DEMOLITION
20 cu.m. @ 1,000.00 cu.m. = 20,000.00
B. EXCAVATION
4 cu.m @ 500.00 cu.m. = 2,000.00
B. MOBILIZATION and WASTE DESPOSAL
------------------------------------------------------------------------------- = 15,500.00

ITEM COST = 37,500.00

ITEM – 2 FORMS and SCAFFOLDING

Materials:
40 Pieces 2” x 2” x 12’ Coco Lumber @ /bd.ft =
30 Pieces 2” x 3” x 12’ Coco Lumber @ /bd.ft =
50 Pieces 2” x 4” x 12’ Coco Lumber @ /bd.ft =
5 Rolls Nylon Rope @ / roll =
5 Kilos #1 Common Nails @ / kilo =
7 Kilos #2/1 Common Nails @ / kilo =
10 Kilos #4 Common Nails @ / kilo =

ITEM COST =

ITEM – 3 REINFORCEMENT BARS

Materials:
10 Pieces 12mm dia. X 6.00 m. Deform bars @ / piece =
30 Pieces 10mm dia. X 6.00 m. Deform bars @ / piece =
10 Kilos G.a. # 16 G.I. Tie Wire @ / kilo =
3 Pieces Hacksaw @ / piece =
15 Pieces Hacksaw Blade @ / piece =
5 Kilos Concrete Nails #4 @ / kilo =
5 Kilos Concrete Nails #3 @ / kilo =

ITEM COST =

ITEM – 4 CONCRETE WORKS (KITCHEN & TOILET)

15 Bags Cement (UNION BRABD) @ / bags =


4 Cu.m. Gravel @ / cu.m. =
2 Cu.m. Coarse Sand @ / cu.m. =

ITEM COST =
ITEM – 5 MASONRY WORKS

A. FILLER & SETTING & PLASTERING


40 Bags Cement (UNION BRAND) @ / bags =
6 Cu.m. Coarse Sand @ / cu.m. =
520 Pieces Concrete Hollow Blocks 100mm @ / piece =

ITEM COST =

ITEM – 6 SECOND FLOOR FRAMING / STAIR / RAILING

Materials:
20 Pieces 3/4" thk. Marine Plyboard @ / piece =
8 Pieces 1.2mm X 2” X 4” thk. Sq. Tube @ / piece =
26 Pieces 1.5mm X 2” X 4” thk. Tubular @ / piece =
13 Pieces 1.5mm X 2” X 6” thk. Tubular @ / piece =
Pieces 12mm X 12mm thk. Sq. Bar @ / piece =
Pieces 10mm thk. Metal Plate @ / piece =
Pieces 2” X 2” thk. Hardwood Railing @ / Lgth =
11 Pieces 2” X 8” thk. Hardwood Stair Steps @ / piece =
2 Boxes 60/13 Welding Rod @ / box =
8 Gallons Epoxy Primer @ / gallon =
4 Gallons Lacquer Thinner @ / gallon =
4 Pieces Roller Brush #4 @ / piece =
1 L.m Pre-Painted Rib Type Roofing @ / piece =
5 Pieces 10mm X 50mm X 6m Flat bar @ / piece =
8 Pieces 10mm dia. Plain Round Bar @ / piece =

ITEM COST =

ITEM – 7 CANOPY TRELLIS

Materials:
5 Pieces 1.5mm X 2” X 4” thk. Tubular @ / piece =
3 Pieces Polycarbonate Translucent Roof @ / piece =

ITEM COST =

ITEM – 8 DRYWALL and CEILING WORKS

Materials:
70 Sheets 3.5mm thk. Hardiflex @ / piece =
15 Pieces 2” X 3” Metal Studs @ / Lgth =
5 Length 2” X 3” Ceiling Channel @ / Lgth =
5 Length 2” X 3” Floor Channel @ / Lgth =
70 Length 1” X 2” Metal Furring @ / Lgth =
50 Length Carrying Channel @ / Lgth =
35 Length Wall Angle @ / Lgth =
6 Box 9/64 Steel Drill Bit @ / Piece =
30 Box G.I. Blind Rivets, 1/8” x 1” @ / piece =

ITEM COST =
ITEM – 9 DOORS
Materials:
1 Pieces 1.20 x 2.10 Sliding Door (Kitchen) @ / piece =
2 Pieces 0.80 x 2.10 Flush Door (Bedroom) @ / piece =
1 Pieces 0.70 x 0.70 Flush Door (Toilets) @ / piece =

ITEM COST =

ITEM – 10 WINDOWS
Materials:
2 Pieces Awing w/ Fixed (1.20 x 1.80) @ / piece =
3 Pieces Awning w/ Fixed (0.30 x 2.10) @ / piece =
2 Pieces Fix Glass Window (0.80 x 1.20) @ / piece =
2 Pieces Awning Window @ / piece =

ITEM COST =

ITEM – 11 CABINETS

Kitchen Cabinets (Base & Hanging Cabinets) --------------------------------------------- =


Built-in Cabinets (Master’s Bedroom) ------------------------------------------------------ =
Built-in Cabinets (Bedroom - 2) -------------------------------------------------------------- =
TV Cabinet Design ------------------------------------------------------------------------------- =
Dining Console Table --------------------------------------------------------------------------- =

ITEM COST =

ITEM – 12 WALL FINISHES

Materials:
00 Pieces Stone Wall Cladding (Main Door) @ / piece =
00 Pieces Stone Wall/Ashlar (Accent Wall) @ / piece =

ITEM COST =

ITEM – 13 TILES

Materials:
00 Pieces 0.60m X 0.60m Porcelain Tiles @ / piece =
00 Pieces 0.60m X 0.60m Non-Slip Tiles @ / piece =
00 Pieces 0.30m X 0.60m Tiles (Toilet) @ / piece =
0 Bags Tiles Grout @ / bag =
00 Bags Cement (UNION BRABD) @ / bags =
0 Cu.m. Coarse Sand @ / cu.m. =
0 Cu.m. Tile Adhesive @ / Bags =

ITEM COST =

LABOR COST =

ITEM – 14 PAINTING
Materials:
Gallons Semi-Gloss Latex @ / Gal. =
Gallons Acrytic Primer @ / Gal. =
3 Gallons Neutralizer @ / Gal. =
2 Gallons Poly Tuff @ / Gal. =
Gallons Skim Coat @ / Gal. =
5 Gallons Lacquer Thinner @ / Gal. =
4 Pieces Paint Roller #4 @ / Pcs =
4 Pieces Baby Roller #2 @ / Pcs =
6 Pieces Paint Brush @ / Pcs =
4 Pieces Paint Pan @ / Pcs =
10 Kilos Waste Cotton @ / Pcs =
8 Pieces Sand Paper Assorted #120 @ / Mts =
8 Pieces Sand Paper Assorted #60 @ / Mts =
30 Pieces Masking Tape #3/4 @ / Pcs =
10 Pieces Old News Paper @ / Kgs =
ITEM COST =

ITEM – 15 PLUMBING PIPES and FITTING

A. Sanitary Pipes
5 Lgth 100mm dia. X 3.00m @ / Lgth =
5 Lgth 75mm dia. X 3.00m @ / Lgth =
3 Lgth 50mm dia. X 3.00m @ / Lgth =
5 Pieces Elbow, 90 deg. - 100mm dia. @ / piece =
10 Pieces Elbow, 90 deg. - 75mm dia. @ / piece =
5 Pieces Elbow, 90 deg. – 50mm dia. @ / piece =
3 Pieces Elbow, 45 deg. – 100mm dia. @ / piece =
5 Pieces Elbow, 45 deg. – 50mm dia. @ / piece =
10 Pieces 75mm dia. coupling @ / piece =
4 Pieces Sanitary WYE – 100mm dia. @ / piece =
6 Pieces Reducer WYE – @ / piece =
100mm dia. X 75mm dia.
2 Pieces Floor Drain Trap @ / piece =
3 Pieces Clean – Out w/ Plug – 75mm dia. @ / piece =
3 Pieces Clean – Out w/ Plug – 100mm dia. @ / piece =
2 Can 16 oz. PVC Clear Solvent Cement @ / Can =
ITEM COST =

B. Water Pipes
Materials:
1 Pieces Gate Valve 20mmØ @ / piece =
24 Pieces Elbow 90 deg. @ / piece =
8 Lgth 20mm dia. Pipe @ / Lgth =
5 Pieces Reducer Tee @ / piece =
3 Pieces Nipple Reducer @ / piece =
2 Pieces Coupling @ / piece =
5 Pieces Teflon Tape @ / piece =
2 Pieces MALE ADAPTOR 20mmØ @ / piece =

ITEM COST =

Das könnte Ihnen auch gefallen