Sie sind auf Seite 1von 2

2).

Clear dust inside and outside the hole,


insert an expansion pipe vertically into
the hole, use hammer to knock until it is
in the hole entire.
KSG-3.2K/3.6K/4K/4.6K/5K-DM 3).Then screw a tapping screw into the
pipe and keep around 10mm outside the
pipe.
Solar Inverter 4).Hang the inverter on the screws,
check right and left sides, make sure the
it is hung in the right position, then screw
the screws tight.
User Manual
3.Electric connection
Danger
High voltage is present inside inverterit may do harm to human safety!
Before doing connection,make sure there are not power present in
DC and AC cables.
1.Unpack And Check Before finishing connections, DON'T switch on DC and AC breaker.

注意
Notice Warning
In any case, this guidance is not intended to replace the user manual or safety + and - of PV are not allow to be grounded, otherwise the inverter may be
instructions of the product. d a m a g e d R e c o m m e n d e d o p e n c i r c u i t v o l t a g e o f P V a r r a y.
Make sure that you have read completely and understand fully, and carefully follow
the user's manual and relevant specifications before any operation. Recommend the PV array open-circuit voltage(25°C).
Otherwise, it will result in casualties and equipment damage. 1K: 160. . . 200V 1.5K: 200. . . 250V 2K/3K: 250. . . 450V

1).Unpack and take out inverter and accessories.


2).Please check if model of received inverter is correct and items listed in packing list 3.1 AC cable connection
are all included. R e c o m m e n d a t i o n o f A C c a b l e : i n n e r d i a m e t e r i s 1 2 AW G ( 4 m m ² ) , o u t e r d i a m e t e r
3).Please contact your local distributor if the inverter is found damaged or is Ø10mm.
accessories found not comply with packing list, don't try to install it.
1. disconnect the connection to the power grid (disconnect the
circuit breaker) to ensure that the connection will not be

2.inverter fixation reconnected by accident.

2. The stripping and crimping terminals: strip the cable until


1).Please refer to inverter user manual to select proper position to install the inverter. about 26-28mm are exposed with wire striper, then strip the skin
Keep enough space for heat-dissipation when there are a few inverters to be of the wire until 8.5 + 0.5mm are exposed, finally press and
installed, at least 0.3m. crimp the terminals together(recommend six side crimping
pliers).
2).Pay attention to human and inverter safety when moving the inverters.
3). follow the steps below to fix the inverter. 3. Open waterproof connector, wires are connectedsequentially
through the lock nut, wire sealing body and sleeve.

4. insert three wires (L, N, PE)into the pin hole correspondingly,


when hearing a click, means it is clamped in place, try to pull out
the cable,make sure cable is firmly connected.
1).Paste the installation
5. fix the sleeve in order, then tighten the nylon waterproof
template on wall, drill holes by connector, finally tighten the nut line.
following its guided locations,
use a Ø10 impact drill to make 6. connect the plug and socket, screw clockwise, when hearing
the locking buckle click two times, means it is clamped in place.
it as precise as possible.
7. disassembly connector: push the lock upward, then
counterclockwise screw plug, you can pull the plug out.
3.2 PV Input Connection 3.3 communication connection
3.2.1installation instructions of PV terminal connection & disconnection The inverter is equipped with standard RS232 and RS485 communication ports,
( Te r m i n a l h a s p o l a r i t y, p a y a t t e n t i o n t o t h e " + " " - " l o g o o n t h e b o d y ) and the RS232 communication port is mainly used for the software upgrade, RS485
communication port is for inverter cable monitoring.
█ Recommendation of PV input cable: inner diameter is 12AWG (4mm²),outer diameter is Ø6mm.
█ Connection of the RS485 port connected to remote communication products (GPRS/WIFI).
█ Connecting Process of Connector.
1. Insert stripped cable with capacity: 逆变 器 485端子 WIFI RJ45
2.5mm-6mm outer diameter:
1 5.0mm-8.0mm strip length: Pin NO. RS485 Pin NO. RS485
4 2
15mm 1 (A)R/T+ 1 (A)R/T+
2 (A)R/T- 2 (A)R/T-
2. Press the spring with the thumb or pliers:
please make sure that the spring is closed 3 NC 3 NC
15# (refer to the second step in the figure). 4 NC 4 NC
3 5 GND 5 GND
3. Docking connector (refer to the figure)
fastening cable fasteners. 6 GND 6 GND
Tighten the fastening ring to the O type ring 7 5V 7 5V
and then forcibly lock (if using installation
tool, the torque can be set to 2Nm). After 8 5V 8 5V
docking, the operation is completed.
█ Disconnecting Process of Connector 4.Running setting
C h e c k a l l c o n n e c t i o n s a g a i n b e f o r e s t a r t i n g t h e i n v e r t e r, e n s u r e P V i n p u t w i r e a n d
1) Insert the word screwdriver or test pen into the AC output wire connection is OK.
2
place as the schematic. To s t a r t t h e i n v e r t e r, p l e a s e s w i t c h o n A C b r e a k e r f i r s t , t h e n s w i t c h o n t h e D C
1 s w i t h ( I f t h e r e ) o n i n v e r t e r. I f a l l c o n n e c t i o n s a r e c o r r e c t a n d P V c o n f i g u r a t i o n s a r e
2) Pull out the connector at the same time pulling c o r r e c t , L C D w i l l b e o n , " Wo r k " L E D w i l l b e o n , i n v e r t e r w i l l b e s t a n d b y f o r G r i d -
out the screwdriver. tied connecting.
1. Safety standard setting
Factory default setting of inverter is a wide range of local grid standards. when
█ line Drawing Process the grid standards and local power grid requirements do not match, the safety
standards can be set in accordance with the local power grid standard through
the machine panel (Set). There is a "MENU" list in the LCD display interface for
1) Unscrew the fastening cable.
safety standard setting, specific method as below:
2) Use a screwdriver to pry locking device press the panel button to enter the setting interface "Setting Option", move the
33 (the 2nd steps shown in Figure). cursor to the first option "1.Grid SPEC", press the button to enter the password
" PA S S W O R D " i n t e r f a c e , m o v e t h e c u r s o r, e n t e r t h e p a s s w o r d " 1 2 3 " , e n t e r t h e
11 safety standard selecting interface "GRID SPEC", moves the cursor to select
3) Pull out the core of the connecting wire.
4 safety front, long press panel key lock safety standard, and there will be a black
4
22 4) Pry open the spring device and exit cable with box in front of the safety standard. Move the cursor to the top of the "GRID SPEC",
a screwdriver. press the button to exit the safety set. confirm the OK and restart the machine,
finally the setting is done.
2. RS485 address setting
The factory default address of the inverter is 1, for single communication, there is
3.2.2 Connect the PV wire to the positive PV and negative PV terminals accordingly. no need to set, and for the multi machine communication, needs to set the address
of the inverter in turn. In the LCD, when it shows "MENU" option in the screen, the
safety standards can be set, specific method as below:
PV1
RS-485/WLAN/GPRS press the panel button to enter the setting interface "Setting Option", move the
OFF cursor to the second option "2.COMM Address", press the button andenter the
AC
DC- address setting interface "COMM Address", move the cursor to the address, set
PV2 Switch
RS-232 t h e a d d r e s s b y t h e k e y. S e t t h e O K a d d r e s s , t h e n m o v e t h e c u r s o r t o t h e a d d r e s s
ON
Dry column, set the address through the button.When setting is finished, move the
Contact cursor to the top of "COMM Address", press the button to exit the address settings.
confirm the OK and restart the machine, finally the setting is done.

Das könnte Ihnen auch gefallen