STAGE II : PA SYSTEM UNIT 1 (ZONE 2)

COMMUNICATI LOUDSPEAKER
S NO OPERATION REMARKS TARGET REMARKS / DETAILS AFTER ATTENDING DEFECT
ON STATUS STATUS
22.07.2019 22.07.2019 22.07.2019 22.07.2019 DATE
1 0m CPU OK OK OK OK NA
2 0m DMCW OK OK OK OK NA
Checked on 25.07.2019, Connector tightened, Now working
OK.
3 3.5m HT SWGR OK OK OK 24.07.2019
Informed to Operation Mr.Bhumi Choudhary
Also it is common to Unit 1 & 3, Phase wise.
8.5m ups & BATTERY room
System Not ups & BATTERY room phase wise
4
Available New Requirement
5 12m LT SWGR OK OK OK OK NA
6 8.5m MOT OK OK OK OK NA
7 17m TDBFP OK OK OK OK NA
8 24m APRDS OK OK OK OK NA
9 0m Boiler mill RHS OK OK OK OK NA
10 0m Boiler mill LHS OK OK OK OK NA
RECIEVER NOT
This is Portable PA System (PPS) all- in-one not separate
AVAILABLE
11 0m PA/FD Fan side OK OK OK NA Reciever Required.Informed to Operation Mr.Bhumi
(Different
Choudhary/Mr Rajesh Mohanty
Model)
12 22m BLR Front Side OK OK OK 24.07.2019 Checked on 25.07.2019, Found working OK.
13 22m BLR Feeder Floor RHS OK OK OK OK NA
14 22m BLR Feeder Floor LHS OK OK OK OK NA
15 49m Boiler OK OK OK 24.07.2019 Checked on 25.07.2019, Found working OK.
RECIEVER NOT
This is Portable PA System (PPS) all- in-one not separate
AVAILABLE
16 79m Boiler OK OK OK NA Reciever Required.Informed to Operation Mr.Bhumi
(Different
Choudhary/Mr Rajesh Mohanty
Model)
17 ID Fan side NOT OK NOT OK OK NOT OK 25.07.2019 Checked Call master N/W, UNDER PROGRESS
PA Systems are Available as 01 Set For Pass-A&B , 01 Set
System Not For Pass-C&D and one Plug Point for future use of
18 ESP 12m NA
Available Portable PA system as & when required.
ESP 12 M will be a New Requirement.
19 BOILER FILL PUMP AREA OK OK OK OK NA