PROJECT :punggol cc

SUBJECT -Major Axis

cover = 30 mm
effective length of slab = 17.60 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 1200 mm
Effective depth d = 1148 mm
b = 250 mm

Main Bar
Moment M = 382 kNm
k = 0.03316 < 0.156 k>0.156
z = 1090.13
Area required = 875.6 mm2
Area provided = 2076 mm2 Provide 25+16 - 3

Distribution Bar
Min. area required = 390.0 mm2
Area provided = 942 mm2 Provide 20 - 3

Shear check
Shear = 292 kN
V = 1.02 N/mm2 < 4.73 N/mm2 ok
100As/bd = 0.72
400/d = 0.35 N/mm2
vc = 0.49
V-vc = 0.53 N/mm2
sv = 200 mm < 860.63 ok
0.87fy = 368.00 N/mm2
Ag > 72.03 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 121.26
modification tension factor tension = 1.99
modification compression factor tensi = 1.00
Actual span/effective depth = 15.34 passed!
Allowable span/effective depth = 22.60
long span factor = 0.57
PROJECT :punggol cc
SUBJECT -Beam

cover = 35 mm
effective length of slab = 2.90 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 16 mm
H = 200 mm
Effective depth d = 157 mm
b = 1000 mm

Main Bar
Moment M = 190 kNm
k = 0.22023 < 0.156 k>0.156
z = 89.92
Area required = 5279.6 mm2
Area provided = 603 mm2 Provide 16 - 3

Distribution Bar
Min. area required = 260.0 mm2
Area provided = 603 mm2 Provide 16 - 3

Shear check
Shear = 1057 kN
V = 6.73 N/mm2 < 4.73 N/mm2 fail
100As/bd = 0.38
400/d = 2.55 N/mm2
vc = 0.65
V-vc = 6.08 N/mm2
sv = 200 mm < 117.75 fail
0.87fy = 368.00 N/mm2
Ag > 3305.97 mm2

Deflection Check
Span/effective depth ratio = 7.00
fs = 2516.45
modification tension factor tension = -1.42
modification compression factor tensi = 1.00
Actual span/effective depth = 18.47 failed
Allowable span/effective depth = -9.97
long span factor = 1.00
fail

ok
PROJECT :punggol cc
SUBJECT -Beam

cover = 35 mm
effective length of slab = 2.90 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 16 mm
H = 200 mm
Effective depth d = 157 mm
b = 1000 mm
Main Bar
Moment M = 190 kNm
k = 0.22023 < 0.156
d' = 64.00
z = 121.97 x = 77.84
AS' = 1488.95 d'/x = 0.82
AS = 4246.07

As provided-Tension = 12064 mm2 Provide 32 -


As provided-Compression = 8042 mm2 Provide 32 -

Shear check
Shear = 972.0 kN
V = 6.19 N/mm2 < 4.73 or 5 N/mm2
100As/bd = 7.68
400/d = 2.55 N/mm2
vc = 1.76
V-vc = 4.43 N/mm2
sv = 250 mm < 117.75
0.87fy = 368.00 N/mm2
Ag > 3009.41 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 101.19
modification tension factor tension = 0.91
modification compression factor tension = 1.10
Actual span/effective depth = 18.47 passed!
Allowable span/effective depth = 20.10
< 0.37

15 ok 8000.00
10 ok

or 5 N/mm2 fail

fail
PROJECT :Vista
SUBJECT -1VB119

cover = 30 mm
effective length of BEAM = 9.52 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 20 mm
H = 600 mm
Effective depth d = 550 mm
b = 300 mm

Main Bar
Moment M = 85 kNm
k = 0.02670 < 0.156 k>0.156
z = 522.50
Area required = 405.5 mm2
Area provided = 402 mm2 Provide 16 - 2

Distribution Bar 202.77


Min. area required = 234.0 mm2
Area provided = 265 mm2 Provide 13 - 2

Shear check
Shear = 153 kN
V = 0.93 N/mm2 < 4.73 N/mm2 ok
100As/bd = 0.24
400/d = 0.73 N/mm2
vc = 0.41
V-vc = 0.52 N/mm2
sv = 150 mm < 412.50 ok
0.87fy = 368.00 N/mm2
Ag > 63.50 mm2
ASV/SV 0.85

Deflection Check
Span/effective depth ratio = 20.00
fs = 289.94
modification tension factor tension = 1.40
modification compression factor tensi = 1.00
Actual span/effective depth = 17.31 passed!
Allowable span/effective depth = 28.00
long span factor = 1.00

100As'/bd = 0.16
fail

ok
PROJECT :Vista
SUBJECT -1VB119

cover = 30 mm
effective length of slab = 9.52 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 20 mm
H = 600 mm
Effective depth d = 550 mm
b = 300 mm
Main Bar
Moment M = 84.8 kNm
k = 0.02670 < 0.156
d' = 63.00
z = 427.29 x = 272.69
AS' = -2107.24 d'/x = 0.23
AS = 790.38

As provided-Tension = 4825 mm2 Provide 32 -


As provided-Compression = 1473 mm2 Provide 25 -

Shear check
Shear = 153.0 kN
V = 0.93 N/mm2 < 4.73 or 5 N/mm2
100As/bd = 2.92
400/d = 0.73 N/mm2
vc = 0.93
V-vc = -0.01 N/mm2
sv = 175 mm < 412.50
0.87fy = 368.00 N/mm2
Ag > 57.07 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 47.09
modification tension factor tension = 2.00
modification compression factor tension = 1.10
Actual span/effective depth = 17.31 passed!
Allowable span/effective depth = 44.00
long span factor = 1.00
< 0.37

6 ok OK 2.68
3 ok

or 5 N/mm2 ok

ok
PROJECT :G15E-ESS
SUBJECT :GHB5-L

cover = 35 mm
effective length of slab = 5.85 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 1200 mm
Effective depth d = 1143 mm
b = 300 mm

Main Bar
Moment M = 569 kNm
k = 0.04152 < 0.156 k>0.156
z = 1085.38
Area required = 1310.0 mm2
Area provided = 1608 mm2 Provide T 32 - 2

Distribution Bar
Min. area required = 468.0 mm2
Area provided = 628 mm2 Provide T 20 - 2

Shear check
Shear = 566 kN
V = 1.65 N/mm2 < 4.73 N/mm2 ok
100As/bd = 0.47
400/d = 0.35 N/mm2
vc = 0.42
V-vc = 1.23 N/mm2
sv = 150 mm < 856.88 ok
0.87fy = 368.00 N/mm2
Ag > 150.24 mm2 10-157
13-265
AS/SV 1.00
Deflection Check
Span/effective depth ratio = 20.00
fs = 234.14
modification tension factor tension = 1.41
modification compression factor tension = 1.00
Actual span/effective depth = 5.12 passed!
Allowable span/effective depth = 28.20
long span factor = 1.00
ok

ok
PROJECT :G15E-ESS
SUBJECT :GHB5-L

cover = 35 mm
effective length of slab = 5.85 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 1200 mm
Effective depth d = 1143 mm
b = 300 mm
Main Bar
Moment M = 569 kNm
k = 0.04152 < 0.156
d' = 73.00
z = 887.59 x = 566.46
AS' = -3665.98 d'/x = 0.13
AS = 2353.16

As provided-Tension = 12064 mm2 Provide 32 -


As provided-Compression = #VALUE! mm2 Provide 32 -

Shear check
Shear = 972.0 kN
V = 2.84 N/mm2 < 4.73 or 5 N/mm2
100As/bd = 3.52
400/d = 0.35 N/mm2
vc = 0.83
V-vc = 2.01 N/mm2
sv = 250 mm < 856.88
0.87fy = 368.00 N/mm2
Ag > 409.46 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 56.08
modification tension factor tension = 2.00
modification compression factor tension = 1.10
Actual span/effective depth = 5.12 passed!
Allowable span/effective depth = 44.00
< 0.37

15 ok 14400.00
#VALUE!

or 5 N/mm2 ok

ok
PROJECT :G15E-ESS
SUBJECT :slab

cover = 20 mm
effective length of slab = 3.00 m
concrete material strength,fcu = 20 N/mm2
Main bar dia = 7 mm
H = 100 mm
Effective depth d = 77 mm
b = 1000 mm

Main Bar
Moment M = 5.7 kNm
k = 0.04844 < 0.156 k>0.156
z = 72.13
Area required = 196.4 mm2
Area provided = 385 mm2 Provide T 7 - 10

Distribution Bar
Min. area required = 130.0 mm2
Area provided = 628 mm2 Provide T 20 - 2

Shear check
Shear = 566 kN
V = 7.40 N/mm2 < 3.58 N/mm2 fail
100As/bd = 0.50
400/d = 5.23 N/mm2
vc = 0.71
V-vc = 6.69 N/mm2
sv = 150 mm < 57.38 fail
0.87fy = 368.00 N/mm2
Ag > 2728.08 mm2 10-157
13-265
AS/SV 18.19
Deflection Check
Span/effective depth ratio = 20.00
fs = 146.73
modification tension factor tension = 2.00
modification compression factor tension = 1.00
Actual span/effective depth = 39.22 passed!
Allowable span/effective depth = 40.00
long span factor = 1.00
ok

ok
PROJECT :G15E-ESS
SUBJECT :slab

cover = 20 mm
effective length of slab = 3.00 m
concrete material strength,fcu = 20 N/mm2
Main bar dia = 7 mm
H = 100 mm
Effective depth d = 77 mm
b = 1000 mm
Main Bar
Moment M = 5.67 kNm
k = 0.04844 < 0.156
d' = 40.00
z = 59.43 x = 37.93
AS' = -861.83 d'/x = 1.05
AS = 481.61

As provided-Tension = 12064 mm2 Provide 32 -


As provided-Compression = #VALUE! mm2 Provide 32 -

Shear check
Shear = 972.0 kN
V = 12.71 N/mm2 < 3.58 or 5 N/mm2
100As/bd = 15.77
400/d = 5.23 N/mm2
vc = 2.22
V-vc = 10.48 N/mm2
sv = 250 mm < 57.38
0.87fy = 368.00 N/mm2
Ag > 7121.59 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 11.48
modification tension factor tension = 2.00
modification compression factor tension = 1.10
Actual span/effective depth = 39.22 passed!
Allowable span/effective depth = 44.00
< 0.37

15 ok 4000.00
#VALUE!

or 5 N/mm2 fail

fail
PROJECT :chcking exsing slab
SUBJECT :slab

cover = 20 mm
effective length of slab = 3.00 m
concrete material strength,fcu = 20 N/mm2
fy = 250 N/mm2
Main bar dia = 7 mm
H = 100 mm
Effective depth d = 77 mm
b = 1000 mm

Main Bar
Moment M = 5.7 kNm
k = 0.04844 < 0.156 k>0.156
z = 72.13
Area required = 361.4 mm2
Area provided = 388 mm2 Provide T 7 - 5

Deflection Check
Span/effective depth ratio = 26.00
fs = 267.79
modification tension factor tension = 1.48
modification compression factor tension = 1.00
Actual span/effective depth = 39.22 failed
Allowable span/effective depth = 38.55
long span factor = 1.00
ok
PROJECT :chcking exsing slab
SUBJECT :slab

cover = 20 mm
effective length of slab = 3.00 m
concrete material strength,fcu = 20 N/mm2

Main bar dia = 7 mm


H = 100 mm
Effective depth d = 77 mm
b = 1000 mm
Main Bar
Moment M = 5.67 kNm
k = 0.04844 < 0.156
d' = 40.00
z = 59.43 x = 37.93
AS' = -861.83 d'/x = 1.05
AS = 481.61

Deflection Check
Span/effective depth ratio = 20.00
fs = #DIV/0!
modification tension factor tension = #DIV/0!
modification compression factor tension = 1.10
Actual span/effective depth = 39.22 #DIV/0!
Allowable span/effective depth = #DIV/0!
< 0.37
PROJECT :G8D
SUBJECT : New 150 mm thk slab

cover = 20 mm
effective length of slab = 2.35 m
concrete material strength,fcu = 40 N/mm2
fy = 460 N/mm2
Main bar dia = 7 mm
H = 250 mm
Effective depth d = 227 mm
b = 1000 mm

Main Bar
Moment M = 54.0 kNm
k = 0.02631 < 0.156 k>0.156
z = 215.18
Area required = 627.1 mm2
Area provided = 385 mm2 Provide T 7 - 10

Min. area required = 325.0 mm2


Area provided = 385 mm2 Provide T 7 - 10

Deflection Check
Span/effective depth ratio = 20.00
fs = 468.46
modification tension factor tension = 0.59
modification compression factor tension = 1.00
Actual span/effective depth = 10.38 passed!
Allowable span/effective depth = 11.73
long span factor = 1.00
PROJECT :G15E
SUBJECT : Transformer room

cover = 25 mm
effective length of slab = 6.10 m
concrete material strength,fcu = 40 N/mm2
fy = 460 N/mm2
Main bar dia = 20 mm
H = 300 mm
Effective depth d = 265 mm
b = 1000 mm

Main Bar
Moment M = 200.0 kNm
k = 0.07120 < 0.156 k>0.156
z = 242.05
Area required = 2064.7 mm2
Area provided = 2513 mm2 Provide T 20 - 8

Min. area required = 390.0 mm2


Area provided = 664 mm2 Provide T 13 - 5

Deflection Check
Span/effective depth ratio = 20.00
fs = 236.18
modification tension factor tension = 1.09
modification compression factor tension = 1.10
Actual span/effective depth = 23.02 passed!
Allowable span/effective depth = 23.88
long span factor = 1.00
PROJECT :punggol cc
SUBJECT -Major Axis

cover = 35 mm
effective length of slab = 17.60 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 1200 mm
Effective depth d = 1140 mm
b = 300 mm

Main Bar
Moment M = 382 kNm
k = 0.02802 < 0.156 k>0.156
z = 1082.53
Area required = 881.8 mm2
Area provided = 1473 mm2 Provide 25 - 3

Distribution Bar
Min. area required = 468.0 mm2
Area provided = 1473 mm2 Provide 25 - 3

Shear check
Shear = 292 kN
V = 0.85 N/mm2 < 4.73 N/mm2 ok
100As/bd = 0.43
400/d = 0.35 N/mm2
vc = 0.41
V-vc = 0.44 N/mm2
sv = 200 mm < 854.63 ok
0.87fy = 368.00 N/mm2
Ag > 72.24 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 172.15
modification tension factor tension = 1.90
modification compression factor tensi = 1.00
Actual span/effective depth = 15.45 passed!
Allowable span/effective depth = 21.60
long span factor = 0.57
ok

ok
PROJECT :punggol cc
SUBJECT -Major Axis

cover = 35 mm
effective length of slab = 17.60 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 1200 mm
Effective depth d = 1140 mm
b = 300 mm
Main Bar
Moment M = 382 kNm
k = 0.02802 < 0.156
d' = 73.00
z = 885.26 x = 564.97
AS' = -4088.15 d'/x = 0.13
AS = 1915.19

As provided-Tension = 12064 mm2 Provide 32 -


As provided-Compression = #VALUE! mm2 Provide 32 -

Shear check
Shear = 972.0 kN
V = 2.84 N/mm2 < 4.73 or 5 N/mm2
100As/bd = 3.53
400/d = 0.35 N/mm2
vc = 0.83
V-vc = 2.02 N/mm2
sv = 250 mm < 854.63
0.87fy = 368.00 N/mm2
Ag > 410.72 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 45.64
modification tension factor tension = 2.00
modification compression factor tension = 1.10
Actual span/effective depth = 15.45 passed!
Allowable span/effective depth = 44.00
< 0.37

15 ok 14400.00
#VALUE!

or 5 N/mm2 ok

ok
PROJECT :punggol cc
SUBJECT -Major Axis

cover = 35 mm
effective length of slab = 17.60 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 1200 mm
Effective depth d = 1140 mm
b = 300 mm

Main Bar
Moment M = 165 kNm
k = 0.01210 < 0.156 k>0.156
z = 1082.53
Area required = 380.9 mm2
Area provided = 942 mm2 Provide 20 - 3

Distribution Bar
Min. area required = 468.0 mm2
Area provided = 942 mm2 Provide 20 - 3

Shear check
Shear = 200 kN
V = 0.59 N/mm2 < 4.73 N/mm2 ok
100As/bd = 0.28
400/d = 0.35 N/mm2
vc = 0.35
V-vc = 0.23 N/mm2
sv = 200 mm < 854.63 ok
0.87fy = 368.00 N/mm2
Ag > 65.22 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 116.18
modification tension factor tension = 2.00
modification compression factor tensi = 1.00
Actual span/effective depth = 15.45 passed!
Allowable span/effective depth = 22.73
long span factor = 0.57
ok

ok
PROJECT :punggol cc
SUBJECT -Major Axis

cover = 35 mm
effective length of slab = 17.60 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 1200 mm
Effective depth d = 1140 mm
b = 300 mm
Main Bar
Moment M = 165 kNm
k = 0.01210 < 0.156
d' = 73.00
z = 885.26 x = 564.97
AS' = -4596.57 d'/x = 0.13
AS = 1406.77

As provided-Tension = 12064 mm2 Provide 32 -


As provided-Compression = #VALUE! mm2 Provide 32 -

Shear check
Shear = 972.0 kN
V = 2.84 N/mm2 < 4.73 or 5 N/mm2
100As/bd = 3.53
400/d = 0.35 N/mm2
vc = 0.83
V-vc = 2.02 N/mm2
sv = 250 mm < 854.63
0.87fy = 368.00 N/mm2
Ag > 410.72 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 33.53
modification tension factor tension = 2.00
modification compression factor tension = 1.10
Actual span/effective depth = 15.45 passed!
Allowable span/effective depth = 44.00
< 0.37

15 ok 14400.00
#VALUE!

or 5 N/mm2 ok

ok
PROJECT :G15E
SUBJECT -STAIRCASE BEAM

cover = 30 mm
effective length of slab = 7.00 m
concrete material strength,fcu = 35 N/mm2
Main bar dia = 25 mm
H = 600 mm
Effective depth d = 545 mm
b = 300 mm

Main Bar
Moment M = 22 kNm
k = 0.00707 < 0.156 k>0.156
z = 517.28
Area required = 106.3 mm2
Area provided = 402 mm2 Provide 16 - 2

Distribution Bar
Min. area required = 234.0 mm2
Area provided = 402 mm2 Provide 16 - 2

Shear check
Shear = 46 kN
V = 0.28 N/mm2 < 4.73 N/mm2 ok
100As/bd = 0.25
400/d = 0.73 N/mm2
vc = 0.41
V-vc = 0.00 N/mm2
sv = 200 mm < 408.38 ok
0.87fy = 400 N/mm2
Ag > 59.97 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 75.98
modification tension factor tension = 2.00
modification compression factor tensi = 1.00
Actual span/effective depth = 12.86 passed!
Allowable span/effective depth = 40.00
long span factor = 1.00
PROJECT :G15E
SUBJECT -STAIRCASE BEAM

cover = 25 mm
effective length of slab = 5.56 m
concrete material strength,fcu = 30 N/mm2
Main bar dia = 20 mm
H = 400 mm
Effective depth d = 365 mm
b = 250 mm

Main Bar
Moment M = 142 kNm
k = 0.14162 < 0.156 k>0.156
z = 293.60
Area required = 1204.3 mm2
Area provided = 1257 mm2 Provide 20 - 4

Distribution Bar
Min. area required = 130.0 mm2
Area provided = 664 mm2 Provide 13 - 5

Shear check
Shear = 46 kN
V = 0.50 N/mm2 < 4.38 N/mm2 ok
100As/bd = 1.38
400/d = 1.10 N/mm2
vc = 0.76
V-vc = 0.00 N/mm2
sv = 200 mm < 273.75 ok
0.87fy = 400 N/mm2
Ag > 49.98 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 275.52
modification tension factor tension = 0.88
modification compression factor tensi = 1.00
Actual span/effective depth = 15.23 passed!
Allowable span/effective depth = 17.52
long span factor = 1.00
ok

ok
PROJECT :G15E
SUBJECT -STAIRCASE BEAM

cover = 25 mm
effective length of slab = 5.56 m
concrete material strength,fcu = 30 N/mm2
Main bar dia = 20 mm
H = 400 mm
Effective depth d = 365 mm
b = 250 mm
Main Bar
Moment M = 141.5 kNm
k = 0.14162 < 0.156
d' = 58.00
z = 283.56 x = 180.97
AS' = -116.99 d'/x = 0.32
AS = 1485.48

As provided-Tension = 12064 mm2 Provide 32 -


As provided-Compression = #VALUE! mm2 Provide 32 -

Shear check
Shear = 972.0 kN
V = 10.65 N/mm2 < 4.38 or 5 N/mm2
100As/bd = 13.22
400/d = 1.10 N/mm2
vc = 1.62
V-vc = 9.03 N/mm2
sv = 250 mm < 273.75
0.87fy = 368.00 N/mm2
Ag > 1533.41 mm2

Deflection Check
Span/effective depth ratio = 20.00
fs = 35.40
modification tension factor tension = 1.26
modification compression factor tension = 1.10
Actual span/effective depth = 15.23 passed!
Allowable span/effective depth = 27.83
< 0.37

15 ok 4000.00
#VALUE!

or 5 N/mm2 fail

ok

Das könnte Ihnen auch gefallen