Notes :
1. Sub supplier or sub vendor means supplier to BEL supplier/vendor
2. This criteria is applicable to existing suppliers only.
3. Supplier revaluation to be carried out at least once in six months with a gap of 6 months between the two
consecutive assessments.
4. A non conformity in criteria points in Management responsibility, Production and QA is recorded by showing a score of
0 and conformance by 1. However for Quality performance criteria the conformance score is shown against each criteria
point.
5. Achieved weightage in this sheet shall be automatically picked up from the activities evaluated.
Bajaj Electricals Limited Supplier REVALUATION REFERENCE SHEET
Name of Supplier: M/s. HAC Auditor/s: RK Pandita Auditee/s: M/s. Neeraj Gupta/ Kuldeep Singh/ Naresh
Policy, Organisation Displayed in Hindi on shop floor and at other locations. The
b. Is made available / displayed at appropriate work locations
1.1 Structure and roles company is certified to ISO 9001:2015 & ISO 14001:2015. 1
in the language read/understood by operators.
definition for staff
OC doc. HAC/OC/01 Rev 0 dated 1.4.2015, approved by Plant
c. Organisation structure is documented showing all functions
Head.
and is dated & approved by Top Mgmt.
b. Material safety data sheets displayed near chemical storage MSDS pasted on walls inside the enclosure. Should be made in
and usage area and personnel aware of the same big letters on boards and placed outside the enclosure.
c. Appropriate fire extinguisher type installed
Installed outside
a. No open electrical installation like panels, switches on
machines, transformer, DG etc.
b. No loose or open joints in electric power. No broken
electrical switches / sockets, No loose / hanging wires
c. Chemicals used in production identified so and personnel
Electrical safety in entire aware of hazards and mitigation methods
1.4 ok 1
factory
Installation & use of safety Yes in list and on extinguisher.Hydraulic tests conducted on
1.5 1
equipment in entire factory c. Date of refill mentioned and next due date mentioned 30.10.16 on 30 Fes. Report dated 30.10.16 from Jalan Glass &
Allied Inds.
d. Clear access to fire extinguisher maintained
e. Personnel know the application of available type of fire Last training given to 20 members on 29.10.18. Date of
extinguisher and how to use the same training to be shown on photograph. On 27.9.18 training
provideed to 10 members on fire hydrant & Fes.
Total 5
Weighted Score 10
Bajaj Electricals Limited Supplier REVALUATION REFERENCE SHEET
Name of Supplier: M/s Home Appliances Co. - BADDI Auditor/s: Mr Harcharan Singh Auditee/s: Mr. Pushpraj
e. Appropriate racks / bins / shelves / cupboards available FG material found without pallets at FG storage area.
for storage of materials
component like Motor and jar is stored in plastic bin that is
a. Components / partly processed parts are handled in designed as per component , component is coming on line
appropriate trollies / racks / bins to ensure no damages. with the help of trolley ,so there is no chance of motor and
jar damage
No unwanted and non moving material found on line.
b. No unwanted / nonmoving material observed lying in
shop / below assy table or in passageway
2.2 Material handling & preservation Wound Armature found kept in bin instead of verticals 0
c. Painted / aesthetic / functionally important (e.g. motors,
trollieswhich may cuased damaged to winding wire
stators, blades, plastic, luminaire parts or semi processed
material) are not heaped / stored one above another in
contact with each other to avoid scratches, dents, damages
c. Walls are clean of dust and impression, no cobwebs wall are clean and there is no dust and cobwebs inside the
inside the works, good lighting as required factory, light is sufficient inside the factory
d. No tobacco stains anywhere in the factory No tobacco stain inside the factory
c. Calibration Certificates available and show evidence of calibration certificate ICLCL-1207339.18N Date 11.09.18 due
calibration of gauges, measuring and test instruments used on 10.09.19 calibrated by ICL Calibration available for above
in production shops mention detail of instrument.
a. Components / partly processed material / finished component & partly processed material and finished good
products not acceptable are identified suitably (kept in red product is identified in proper blue and red bin and tagging is
bins / boxes, identified locations, tagged / labels put on done for rejected and ok material.
lots, red color marking etc)
workmen and staff working on shop floor is aware about NC
b. Workmen / staff working in that area are aware of the
Part and material is located in identified area ON SHOP Floor
NC parts kept in that area / near assy stage
Mould records (moulds used in b. The designed shots for the mold, date of
Record is available. GX3 Main body mold was refereed.
2.09 house as well as supplied to sub commencement of production are recorded together with 1
Numbers of shot taken as on 31.10.18 were 643034.
supplier) & preservation no. of shots taken are recorded.
c. Moulds used in house are identified with ID no, and kept
in racks / stands / wooden pallets duly oiled and preserved No mould used in house, moulding procured from Delhi &
well. Baddi
c. Latest copies of component and production (where Drgs recd- Original copies- controlled available.d from BEL
applicable) drawings and Bill of Material are available and under index dated 20.9.18. Some new drgs received dated
controlled 14.8.18.
Infrastructure and Control on d. Documents preserved / maintained properly as per the
3.1 Ok 1
BEL released documents index
a. Product requirements in terms of drawings, quality plans, Drawing for parts released to vendors- refer 3.1e. Corrugation
specifications, reference samples & process parameters where shade cards & printing material supplied by BEL to sub vendor -
required are provided to sub suppliers copy to HAC.
Technical information to sub b. Upon any change in product design and/or document, the
3.5 1
Supplier same is released to sub supplier and his confirmation of ok
receipt obtained.
Jar spindle 29.5mm round cap, 1500 recd from Abhi Electricals
a. Inward Inspection reports are available for rejected /
and inspected vide IR452 dated 23.6.18, rejejcted for fitment
repaired / reworked lots
improper (spindle dia oversize).
Recorded in above IR
Identification & record of NC b. Non conforming Parts at inward stage are recorded with
3.9 quantity and reason of defects on an inspection report. 1
product
Rejection report issued and traceability is maintained.
c. NC products are clearly identified and kept separately and Kept separately identifed.
away from accepted or under inspection material
a. Material resorted, repaired for use is reinspected and Refer 3.9: Lot sent to vendor vide debit note no. 325 dated
recorded on IR. 25.6.18 alongwith IR.
b. Inspection report shows the disposal action taken and its
authorisation by QA head.
b. Sub supplier communicated (via e mail / report sent thru E mail sent to vendor dated 23.6.18.
Disposal action on NC courier etc) upon rejection of lot, partly used after
3.1 1
product sorting/repairs
c. Traceability of reinspection to earlier inspection is Maintained
maintained
NA
d. Lot accepted under deviation after obtaining approval from
BEL QA as per BEL QA procedure. Deviation copy maintained.
c. Audit reports jointly signed by supplier and sub supplier Mail sent to sub vendor on 11.9.18 to improve. No further
Sub vendor signature not on the report.
representatives action taken.
d. Corrective actions planned by sub supplier are received and Subsequnelty checked for some more audits on other suppliers,
monitored for their status. audit findings recorded well with CA.
e. Where changes in BOM/drg/process parameters are
required, the same is carried out and available with supplier NA
after obtaining BEL QA or DD approval.
a. Process audit check sheets available and process audits Daily internal process audits conducted twice/shift. On
carried out by QA on all production processes at defined 15.10.18: checks conducted on all processes and recorded on
interval as per check sheet QA/F/61.
b. Nonconformity observed (in product / process) during audit
Rotary switch knob fitment incorrect recorded. Action: 2 nos
is recorded on audit check sheet and action taken to ensure
3.12 Process audits repaced, segreggation carried out and informed to QA/prodn. 1
process / product nonconformity is corrected.
c. Where required, upon observation of any nonconformity,
components & partly processed products produced prior to
this observation are checked and conformed for acceptance.
Record of same is maintained
Inspection log book maintained - product wise sheets. Details
a. Inspection log book showing products, quantity, rejected
of inspection recorded with IR no, MDCC no. Rejn quantities
qty., nature of rejections, accepted quantity, IR no. and
also shown with reasons.
material dispatch clearance no. from BEL QA maintained
d. Internal inspection for the lot is carried out and only BEL IR 348 dated 31.7.18 for 2196 nos. GX1 - all test
accepted lots offered to BEL. conducted, accepted, Vendor IR 376/378 shown on IR.
e. Where required serial nos. of products accepted also serial nos. 0718- 03991-06186.
mentioned
a. Non conforming / rejected lots at Final Inspection are BEL IR 396 dt. 21.8.18 for 1000 nos. Neo JMG JX4 rejected due
identified suitably and kept such that it does not get mixed to wrong modelname on manual enclosed and scratches on top
with other products cover. HAC IR 438.
b. Record of disposal action on non conforming products/lots
Maintained in documentation.
rejected in Final (internal / BEL QA) inspection maintained
c. Internal re-inspection reports are available for lot/s HAC reinspection after 100% checking - all warranty cards
(rejected internally) which are Segregated / Salvaged / replaced,top cover changed in 15 mixers.HAC IR 462. BEL
3.14 Control of NC products Reworked and than offered for final inspection to BEL QA. reinspection IR 418 dated 27.8.18. Traceability maintained. 1
Traceability of re-inspection report to previous internal report
available
d. BEL QA re-inspection reports are available for lot/s
(rejected by BEL QA) which are Segregated / Salvaged /
Reworked and re -offered for final inspection to BEL QA.
Traceability of re-inspection report to Supplier QA re-
inspection report available.
e. Disposal action is approved by QA yes
Aug summary - BEL QA: Aug 18: 1.1% lot rejejction, sample
a. Monthly final inspection rejection - internal inspection data
rejn= 4.1%. Pareto for last 6 months carried out.
tracked for internal rejections and reports available. Inspection
rejection data received from BEL QA and reports maintained
Sr No Check
Situation Score
CRITERIA SCORE
Lot rejection - BEL - ( 10 Marks )
0%-1% 10
1%-2% 8
2%-4% 6
4%-7% 4
7 % - 10 % 2
> 10% 0