C1

Main Bar:
4-16mm diameter bar

Ties for Column:


10MM. DIAMETER SPACED AT

1- @50mm, 8- @60mm REST @ 62.5mm UP TO MIDSPAN


C2

Main Bar:
8-16mm diameter bar

Ties for Column:


10MM. DIAMETER SPACED AT

1- @50mm, 8- @60mm REST @ 62.5mm UP TO MIDSPAN


C3

Main Bar:
8-16mm diameter bar

Ties for Column:


10MM. DIAMETER SPACED AT

1- @50mm, 8- @60mm REST @ 62.5mm UP TO MIDSPAN


COLUMN SCHEDULE
FLOOR

SECOND
FLOOR
TO
ROOF
DECK

GROUND
FLOOR
TO
SECOND
FLOOR

MARK C1 C2 C3
CAPITOL UNIVERSITY
COLLEGE OF ENGINEERING
Cagayan de Oro City

CE 33
REINFORCED CONCRETE

PLATE NO. 13
COLUMN DESIGN
TITLE

DATE PERFORMED: EVALUATION RATING:

CRITERIA ACTUAL
MARCH 15, 2019 SCORE
 Promptness. Submit the plate on
DATE DUE :
time. (20 pts)
 Neatness. Calculations are organized
and written clearly and neatly with
MARCH 15, 2019 minimal corrections/erasures. (20 pts)
 Figures. Scaled figures are presented
GROUP NO. :
with set of engineering calculations.
N/A Engineering drawing principle is applied
in presenting figures/sketches. Figures aid
in explaining the details of the
calculations. (15 pts)
 Synthesis. Solutions must contain
synthesis. Synthesis is a discussion which
consists of reasoning from self-evident
proportion, laws or principle to arrive a
SUBMITTED BY : precise answer and solution. It may be
interspersed with numerical calculations
or written at the end of the solution.
Answers are also summarized and
TANDAN, SCHUBERT RYAN M. labelled. (30 pts)
STUDENT  Individual Work. Are encouraged to
consult one another or the instructor
regarding the problems encountered in the
process or working the laboratory.
However, the final work must reflect a
SUBMITTED TO : final work without doubt. The instructor
will not tolerate any attempt to cheat,
however minor in may be. An attempt to
cheat will result to zero (0) grade in the
ENGR. MARK HEINTJE A. CUANAN laboratory for both the offender and the
INSTRUCTOR student who allows his or her work to be
copied. (15pts)
TOTAL SCORE /100
REMARKS:

2nd SEMESTER SCHOOL YEAR 2017-2018


SOLVING TIES FOR COLUMN: (1ST Floor to 2nd Floor) and (2nd Floor to Roof Deck)

250mm

250mmm L = 3m

Lo = Maximum value of D1, D2, and L/6

1. D1 = D2 = 250mm
2. L/6 = 3000/6 = 500mm

Use Lo = 500 mm

Minimum Spacing for ties for Lo:

D1 250
1.   62.5mm
4 4
D2 250
2.   62.5mm
4 4
3. 6db = 6(10) = 60 mm

Therefore, use spacing of ties 60 mm

500  50
Number of Bars =  7.5 pcs say 8 pcs
60

Minimum Spacing for Midspan:

D1 D2 250
1.    62.5mm
4 4 4
2. 250mm
3. 48 (tie diameter) = 48(10) = 480mm
4. 16(main bar) = 16(16) = 256 mm

Spacing = 62.5mm

Ties for Column:

1- @50mm, 8- @60mm REST @ 62.5mm UP TO MIDSPAN