Sie sind auf Seite 1von 1

V'

U'
KEY PLAN

T'
855
001-101
001-101
001-101
001-101
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
4833 5678 2322 3920 8080 8000 8000 7900 3400 3800 3250 3770 2385 3600 7895 8000 8040 3960 11500

S'
800

200
800 800 800 800

200

200

200

200

200

200
800

200

200

200
800

A A

800

800

800

800

800

800
600

200600

600

600

600

600
3754 7680
7680 7200 7200 27200 7200 7200 STAIRWELL
HOTEL
7640 COMMS
PRESSURIZATION
ROOM 2 3320 10940 4881

1200
PRESSURIZATION
IWS-04 STORAGE STORAGE

600
600 IWS-04 IWS-04 IWS-04 295 IWS-04 B2-02 IWS-04 IWS-04

600

800

800

600
B3-10 STORAGE STORAGE B3-05 FAN MOUNTED AT H.L.H-SPF-2D

300
480 320 -10.21
IFS-01
m FFL

PRESSURIZATION
21 -13.51 m FFL 400 B3-10
400 400 400 IFS-01 505 B2-03
400 400 400 400 B3-04 600 200
200 1.01 400 400 200 IFS-01 m FFL
-13.51 IFS-01

3370
-13.66 m SSL -13.51 m FFL IWS-03 -10.21 m FFL -13.51 m FFL

3420
48 48
2900 IWS-04 3920 -13.66 m SSL

300
49
49
67
47 1.08 -13.66 m SSL -10.36 m SSL -13.66 m SSL 67
47
1.03 1.04 3100 -10.36 m SSL

4320

4346
51 50
46 68 68
50
66 69 300 IWS-03 66
46 69 IWS-03
65
45 1.09 1.05 1.02 202 200 (FIRE) 65
45 51
MECHANICAL SHAFT 3000
MECHANICAL SHAFT

5095

2350
52
70 70
52
HOTEL STORAGE 44 1.07 LIFT 05 -10.36 m SSL 44
STAIRS

1350

1600
71
53
43 43 71
53
B2-07 1.10 (B6-L8)

380

1266
82 82
PRESSURIZATION STAIRS
B3-S2

6617

55 54
72 72
54

21 ris.x17.52cm

21 ris.x17.52cm
-10.21 m FFL STAFF IWS-04 IWS-07 3100
IFS-01
81
61 73
1.15 CANTEEN -13.51
B2-S2m FFL MAIN DATA RACKS (HOTEL+ LANDLORD) 81
61 73

300

50
60 55
MECHANICAL SHAFT -10.36 m SSL STORAGE

300
56
80 74 80
60 74
56
600 1.13 -10.21 m FFL
79
59
-13.66 m SSL No of racks to be confirmed by specialist 79
59
B3-03

8066

5600

8066
57
75 75
57
1.16 -10.36B3mTOSSL 700

0
8891
78
58 B3 TO B4 B2 78
58 B3 TO B4
3400 FIRE FIGHTING STORAGE
76
1.15 after finalising the active components 76
-13.51 m FFL

300
B3 TO B2 B2 TO B3 B3 TO B4
LIFT LOBBY
77 58 77 B3 TO B2 B2 TO B3
IWS-03 -10.36 m SSL 1.12 B2-01

57
B2 TO B1 B2 TO B1
59 FIRE FIGHTING 3100 IFS-01 -13.66 m SSL
STAIRS 1.19 2458 800 LIFT 02 LIFT 04 B3-08 STAIRS -10.21 m FFL

55 56

PRESSURIZATION
1.20 LIFT LOBBY LIFT LOBBY LIFT 06 IWS-02

2200

2200
B2 TO B1 60
B2-S1
IFS-01 1.18 HOTEL GUESTS HOTEL GUESTS 100 B2-S6 400 -10.36 m SSL

2350
STAFF RESTAURANT 77
61

21 ris.x17.52cm

PRESSURIZATION
2512 LIFTB3-06
LOBBY 300 -13.51
B2-S2m FFL (B6-L8) 250 350 IWS-04

54
76 B2 TO B3
-10.21 m FFL1.21 400 (B6-L8) 78 -10.21 m FFL IWS-05 3800
538 1.14 400 175 275 325 250 BOH CORRIDOR (B6-L8) -13.51
B2-04m FFL -10.21 m SSL
-13.66 FFL 600 IWS-03

53
IWS-03
3050 IWS-04 1.22 B2-06 75 43
400

300
79
44
-10.36 m SSL B2-05 -13.66 m SSL -10.36 m SSL IWS-02 350

4916

300

3520
55 54
74
-10.21 m FFL 1995 -10.36 m SSL 400

249
80
45
STORAGE -10.21 m FFL IWS-06

300
73 81
46
-10.36 m SSL -10.36 m SSL 1300

https://www.youtube.com/watch?v=-tJpcjEagzY
5801

300
56
B3-12 STAIRS IWS-03
72
IWS-02 STAIRS ELV CABLE RISE

R'
CHEF OFFICE STEWARD

200
82
47
MEP 2900

57
-13.51
B2-08 m FFL 200 STORE B3-S1 3100IFS-01 -10.36
IFS-01
m SSL MEP
71
B3-S6 TO UPPER FLOOR

2000

2000

2000
FHC
48
10.02 B2-10 SMOKE LOBBY B3-05 IFS-01 3600 IWS-05

2000

1300
70
1000 -13.51 m IWS-03
FFL 200 MEP B3-07 MEP
MEP
IFS-01 -13.51 m FFL

500
26.01 1.241.25 1.241.25 1.241.25

2000

2000

500

1500
65
-13.66 m SSL DRY STORE B2-S1 -13.51 m FFL 600 2000 SMOKE
-10.36LOBBY
m SSL

2192

269

2192

3751500
69
B2-09 -13.66 m IFS-01
SSL MEP B2-41
-13.51 m FFL 400 B2-40
B4-07 -13.66 mIWS-03
SSL

2075

1875

1892

200

193
-10.21 m FFL TV TV -13.66 m SSL
68
IFS-01
66
B2-S6

2100

1592

1536
FHC
67
10.01 -10.36 m SSL B2-42 -10.21
-13.66
m FFL
m SSL 300 -10.21
-13.51
m FFL
m FFL

473
1.26

2146

1392
-10.21 m IFS-01
FFL

321

321

2061
-10.36 m SSL -10.36 m SSL -10.36 m SSL -10.36
-13.66
m SSL
m SSL

826
1 2 FHC 3 4 5 6 7 8 9 10 11 12 -10.21 m FFL 13 14 600 15 16 17 18 19 FHC 20 21 22

521

76

573

573

573

625

626

573
1200 FHC IFS-02

525
B 600 IWS-04
FHC m SSL
-10.36
8 9 10
B

300
IFS-04 300 300

775
400 11
700 400 1 2 3 4 5
300 3320 300 6 DP4

225

7
4.10 700
DP4A DP4A DP4A DP4A DP4A DP4A DP4A

1.01
doorIWS-01
inserted IWS-01 IWS-01 PEDESTRIAN PATH
3.01 3.04 1.03 7.01 7.02 7.02 IWS-05 IWS-05 IWS-06 IWS-01
door relocated IWS-05
64 23
door relocated DRIVEWAY 12

6539
3.02 DRIVEWAY

SERVICE
-13.51 m FFL -13.61 m FFL

RETAIL
3.06 4.02 7.03 7.03

VALET
1.02 BAKERY BAKERY
HOLDING CHILLER -13.66 m SSL -13.66 m SSL
CHILLER FREEZER DRIVEWAY
3.03
PAN WASH 1.04 7.05 -10.36 m SSL
JANITOR 4.03 7.06
3.06 4.01 7.19
AREA 39 -10.31 m FFL
63 7.04 24
5.13 7.12 -10.36 m SSL
IFS-03
7.15
3.05 13
FEMALE STAFF CHANGING MALE STAFF CHANGING

Q'
COLD PICK 7.20 7.17

SERVICE
B2-12

RETAIL
HOT PICK UP UP 4.10

C B2-13
C

VALET
7.08
29060
BAKERY
4.12 4.11 B2-15 7.05 280 4501550 450 142 216
68 69 400 150
70 71 72 73 74 76 77 400
78 79 80 81

1887
200
HOT KITCHEN 7.07 1720 200 200 400 400 2209 2000 3236 PEDESTRIAN PATH 6000 1550
IWS-02 4350 2000 3960 1798 2000 7486 1800 1200
6.05 7.13 400 365

450
1910 1200 725 1000 19.24 B2-11 1700 38

250

251

250

400
1020 25

250

250

200

500
221 62

600

567

34

550

550

550

550
WEST EAST
5.12 6.01 6.01 7.09

C1 GARDE
7.14
2000
DP1A DP1A DP1A
C1

150
1200

2000

150

150

150

150

300
IWS-02

250
5.01

250
MANAGER 7.18 7.10

2000

2000

2000

1600

1500

1500
5.07 5.09 14

1750

1750

1750
5.07 6.07

6.03
DP8 DP6 DP6 DP4A
DP4A
5.06 5.13
6.09
DP1 DP1 DP1 DP1
7.11 DP1 DP1 RAMP
RAMPUP UP RAMP
RAMPUPUPto

4400

4050

4050

4050

4050
5.13 7.04 1:161:16 IFS-03 1:16
1:16
5.06 400 400 from
fromB3
B3 B1
to B2
6.09 6.08 400

39890
5.13 61 65 400 400 400 1:8 1:7 26

40189
R700
7.05 1:8

6113

SERVICE
VALET
RETAIL
5.04 5.13 6.08 6.02 7.23
7.29 8.12 50 50
6.08 15
5.03
7.25 7.26 8.17 2209 1500 4187 1000 6950 1000 5350 1000 642 3960 2298 1500 7702

400

400

400

400
5.04 5.05 6.10 7.28
7.27 9.01

8500

8500
1.04 9.02 37

1714
MagnaWave

5.02 6.04

TM
7.22

7.24 8.11 IFS-05


8.10
-13.61 m FFL 7.19 8.16 DATA RACK 1555 1695 27

1514

1514

1514

1514
60 66

SERVICE
4.04 -13.66 m SSL

RETAIL
4.04 4.04 4.04 18.03

VALET
17.05

D 4.01 4.01 4.01 4.01 4.01


8.02
8.13
400 150 8.03
8.04
100 300 400 16
D

P'
PEDESTRIAN PEDESTRIAN RAMP
RAMPDOWN
DOWN RAMP
RAMPDOWN
DOWN 1:16 PEDESTRIAN -13.61 m FFL PEDESTRIAN
4.05 4.05 4.05 4.05 4.05 8.09 8.15 IFS-03 400 1:16
8.03 PATH PATH 1:16 IFS-03 to B4
B3 from
fromB1
B2 1:16 PATH IFS-03
-13.66 m SSL PATH IFS-04
4.03 4.14 VEG/FRUIT 1070
MEAT 4.14 36

R700

2536

2536

2536

2536
4.14 4.14 PREP 8.08 EXPRESS LAUNDRY STORAGE ELEC. ROOM UNIFORM 1:8
1:8 1:7
1:8

2686

2577

2662

R700
200 4.09 PREP POULTRY 8.05 DRIVEWAY
HOLDING 4.04 13.14 280
1925 1200 710 1000 PREP 8.16 B2-14 B2-16 B2-17 ISSUE 216

2000

1833

2000

1800

2000

1800
CHILLER 1720 IFS-02 DRIVEWAY 4501550 450 142 28

1300
SSL. -0.30
221 59 67 B2-18 IWS-02 -10.36 m SSL

500

500
4.094.13 4.13

383

1500
4.13 8.05 2209 2000 3236 6000 1550 4350 2000 3960 1798 2000 7322 1800 1200

109

150

150

151

150
4.05 EXPRESS -10.36 m SSL

167

200

200

200

24

500
4.09 LAUNDRY 9.03

100
D1 D1

700
8.14
4.16 4.07
4.02 1200 4.07 4.06 8.07

550

550

550
95 94 90 89 88 86 85 84
-10.31 m FFL 83 82

122

122
8.01

450

400
4.15 FISH 93 92 91 400 87 17
4.174.07 2000 -10.36 m SSL

317
PREP 4.08 8.06 9.06 IWS-02 R2750

2111
400 7180 821 400 29060

1605
DP4A DP1A DP1A DP1A

1505

1505

1505
SERVICE
DP8 DP1 DP1 DP1 2823 942 DP4A IFS-02

VALET
DP1 DP1 DP1 DP6 DP6

RETAIL
FISH MEAT POULTRY
R4000

57
counter
CHILLER CHILLER CHILLER

E DAIRY
4.03
4.02
4.03
4.02
4.03
4.02

VEG/FRUIT
TROLLEY
PARK 1300
9.04
PEDESTRIAN PATH
E

250
CHILLER 58
STORE 35 29
4.15 4.15 4.15 501 9.05

2331
4.10 18
4.02
IFS-01
IWS-03 TROLLEY PARK
EMERGENCY DRIVEWAY DRIVEWAY

SERVICE
RETAIL
FISH POULTRY

VALET
MEAT EXIT DRIVEWAY -13.61 m FFL
F 4.15 4.02 4.15
FREEZER
4.15
FREEZER FREEZER
4.15 4.15 4.04
2500
-13.61 m FFL
-13.66 m SSL -13.66 m SSL F

300
-10.31 m FFL

216
900
-10.36 m SSL ABOVE SOFT SPOT FOR DIESEL

R9737
57 4.03 BOH CORRIDOR
4.02 34 FUEL TANKS DROP DOWN 30
4.03 4.03 4.03 EXPRESS LAUNDRY B2-21
4000x3000 mm

N'

900

300

401
4.02 4.02 14.02 TROLLEY
8798 PARK
IWS-04 -10.21 m FFL IFS-03
MATCH LINE-BASEMENT 1 ( HOTEL AREA )

-10.36 m SSL IFS-04


B2-14 (FIRE)

4275

3000

SERVICE
18
640 LIFT 9 2100 1600
16

RETAIL
4.01 4.01 4.01 4.01 4.01

3402
VALET
-10.36 m SSL

84

80
83 82 81 79 78 77
PUBLIC

661
4.04 260 4.04 4.04 4.04 4.04

R700
1500

B2 TO B1
DP2A IWS-04 (B2-L8)

2254

2242
21 ris.x17.52cm
300 IFS-01 -10.36 m SSL 2350 300 2350 400
PIT DEPTH 0.8 m 400 64

300

6600
1.04 2.04 8200 300 1707 400 200 200 PEDESTRIAN PATH 150 400 460 400 400 400

300

466
56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31

266
4.10 33 1300 FUEL TANKS

3320

200
4.01 3.01 2.01 1995 3800

34

34

34

34

34
STAIRS 29 28 26 25 24 23 22 21 20 19 B2-19 STEPS
G B2-S3
Door with 32
31 27 -10.21 m FFL
G

68
49

72
53

76
57
69
50 70
51 71
52 73
54 74
55 75
56
STORAGE 4600 Access Control 30 -10.36 m SSL

2000

1500
GENERAL -10.21 m FFL

5740

1500

1300

1234
19 ris.x17.37 cm

B2 TO B3

1266
CHILLERB3-13 DEFROST (FIRE)

1534

1500

1500

1500
Fuel Transfer

PLOT BOUNDRY
B3 TO B4
-10.36 m SSL LIFT 11 LIFT 12 345

100
Pump
1312 2350 1000 2350 1350

FHC
4.03 LIFT LOBBY LIFT 10
(FIRE) LIFT 17 ECU STORAGE

300

2000

2000
-13.51
4.01 m FFL SERVICE SERVICE 3055

3000

3300
B2-S3 NO ACCESS SERVICE

3341
-13.66 m SSL 2.03 LIFT
PUBLIC
10 (B6-L8) (B2-L1) DP4A Door with B3-02

3134
1.03 1.03
11.01 DP1 STAIRS
LIFT-10.21
LOBBYm FFL
PUBLIC
(B6-L8) PIT DEPTH 1.15 m
(B2-M2) LIFT LOBBY DP4A -13.51 m FFL
6545 -10.36 m SSL
B3-15 PIT DEPTH 1.15 m B2-22 Access Control KITCHEN PLANTROOM VALET DESK
H DP1
H

FHC
SERVICE SERVICE
DRY STORE AND REFUSE B3-S3 (B6-L8) 300 300 -13.66 m SSL

FHC
IWS-04 -13.51 m FFL B2-24

1520

2220

1600
4.15 STORE KEEPER
B2-12
CHILLER B3 TO B2 -13.51 m FFL
IFS-01
2200 5000 2650 MAU VALET VALET
DP4 DP4 DP4 400 IFS-02 DP4 DP4 DP4 DP4A

300
RETAIL RETAIL
-13.66 m SSL -13.66 m SSL

3500

3500
11.02

300
4.01 -10.36 m SSL

67
48

63

59
66
47 65
46 64
45 44 43
62 61 60 58
IWS-07
IFS-01
10450

964
IWS-01
4.15 GENERAL PRESSURIZATION BOH CORRIDOR

700

700
FREEZER PRESSURIZATION STORAGE
I MEP B2-23
I

343
M 902 B6-15

200 1160
4.02 2153 3520 B2-20
1401
-13.51 m FFL -10.21 m FFL

1160

1160
MEP 200 46510
-10.21 m FFL
-13.51 1159 700 586 3400 3800 599 700 1951 6758 700 5803 IWS-04

250
2.02 20 403 201 -13.66 m SSL 45862

200
B3-14 -13.66 m SSL

200
FHC

700

700
FHC

500

450
500

1860

1860

1651
manteinance access 1:16
STORAGE 90

3456
DP3 B3 ELV ROOM

300
L

13863 2525 IFS-01

GROUND FLOOR
STORAGE -13.51 m FFL
001-101
-13.51 m FFL Door with
DP3 -13.66 m SSL
1.03
-13.66 m SSL Access
MEN'SControl
PRAYER ROOM
B3
LIFT 13
14.02
-13.51
1.04m FFL RECEIVING / PUBLIC LIFTLIFT
LOBBY
LOBBY
(RETAIL
(RETAIL

2800
-13.66 m SSL DESPATCH (B6-M2) PUBLICPUBLIC
ACCESS)
ACCESS)

8690
14.03 OFFICE B3-16B2-26
14.02 -13.51 m FFL
14.01 -10.21 m FFL

200
14.03
-13.66 m SSL
DRY STORE -10.36 m SSL
1.04
IWS-07
1.02
LIFT 14
NOTE: SUNKEN SLABS TO BE MARKED IN THE DRAWINGS 1394 700 7881
1.04
700
REFUSE IFS-01 3189
1.02
PUBLIC
700 792
NO DROP PANELS IN THE COLUMNS IN RETAIL AREA? (B6-M2)

700
CHILLER
1.01

700

700
81
AA-1101-DL-ARC-ALL- 198A L ALCOHOL C5A IWS-03
C5A C5A L

81
NOTE: COLUMNS DROP PANELS TO BE CONSIDERED FOR MEP 500 445 AA-1101-DL-ARC-ALL- 198B

81
C5A

817
1000

231
STORAGE

189

182

991

895
300 300 771

500
2.06

500
300 164

319
96402

600
SUNKEN SLABS MARKED IN THE PLANS TO BE CONSIDERED BY MEP

368
1.20 1.04 1.22
815
C15

410
C15

317
C15 C15
M 1424
600
1.15
FRUIT/VEG. WASH
1.04
1.15 1.15
250
2.03 250
LIFT 15
LIFT 15
PUBLIC 394
M
ALBAKER KITCHEN DISH PUBLIC
(B3-L2)
B2-25 WASH
PIT DEPTH
(B3-L2)1.25 m

12964
2.02
2.06 210 SQM PIT SIZE 5.8*2.02 m DOWN
WOMEN'S PRAYER 2.07 CHEMICAL STORAGE
from GF
ROOM_B3 2.04 -13.51 m FFL B3
-13.66 m SSL -13.51 m FFL
12.13 IFS-03
-13.66 m SSL
-13.511.03
m FFL 12.14

7818
LIFT 16
-13.66 m SSL
12.11

7045
7883

7012
1.01 1.08 MEAT 12.12 LIFT 16
PUBLIC
MEAT 1.07
CHILLER 1.17 PREP PUBLIC
(B3-L2)
MEAT
5.02 1.04 (B3-L2)

27527
4.02 FREEZER PIT DEPTH 1.25 m
1.03 1.15 PIT SIZE 5.8*2.02 m
1.01

300
6.01 001-101

200
13863
MAIN RACKS (RETAIL)
1.01 No of racks to be confirmed

700
offset at 3.00 300
300
1.01
1.03
1.15
1.05
by specialist after finalising
the active components
N'

350
1400 925

300
1.02 1.07

N 1.02
1.17 GEN.
400 1.04 400 250253

700
PREP 250

250
GENERAL 1.05 200 IFS-01

400
600
1.06

TF1
1.01 1.03 CHILLER

800

350
600

300
GENERAL FREEZER

250
TERRACE RAIN WATER

500

247
COLLECTION TANK 800

400
RETAIL COMMS ROOM

m from property 1.02


HOLDING
FREEZER
CAPACITY: 200 CUM
AREA: 105.4 SQ.M
WATER DEPTH: 1.9M.
FREE BOARD:

1.01
1.02 1.1M.
1.03

HOLDING

-13.61 m FFL
-13.66 m SSL
CHILLER
1.03
1.01

1.04
UF TREATED
WATER PUMP ROOM
UF TREATED
500
B2-27
WATER TANK
FOR KITCHEN
CAPACITY: 50 CUM
AREA: 26.4 SQ.M
WATER DEPTH: 1.9M.
FREE BOARD: 1.1M.
WATER TANK FOR
COOLING TOWER

8015

7320
Door with

7770
3rd PARTY STAFF FEMALE Access Control

line CHANGING ROOM


B2-29

Door with Access Control


BMS ROOM
B2-28 high access

IFS-01
SUMP PIT

26
300 300
P'

350
11927 10260
P 400 400

300
300

700
300

600

400

300
800
600

300

92
309

300
IRRIGATION PUMP ROOM 800

400
-13.61 m FFL
IRRIGATION
443 -13.66 m SSL
WATER TANK
IFS-07
CAPACITY: 20 CUM 3rd PARTY STAFF MALE
POTABLE WATER
FUTURE LOCATION CHANGING ROOM SAD-1 POTABLE WATER
STORAGE TANK - 1

6169
B2-30 STORAGE TANK - 1
CAPACITY: 365 CUM
Door with CAPACITY: 365 CUM
DATA RACK AREA: 59 SQ.M -13.61 m FFL

TF1
Access Control AREA: 65.2 SQ.M
WATER DEPTH: 6.2M. -13.66 m SSL

CCTV RACK
ELE ROOM WATER DEPTH: 5.6M.

9866
FREE BOARD: 1.1M.
ELE
B2-32
ROOM FREE BOARD: 1.08M.
IDF
IFS-01
ROOM
B3- XX INACCESSIBLE VOID
B3- XX DOUBLE HEIGHT
IFS-01 VEHICULAR ACCESS
IWS-03
IWS-03 RAMP ABOVE
10800

7442

300
500
IDF ROOM

500
B2-31 HVAC SHAFT

300
10827
Q'

299
001-101 200 199 101
300

1427
300

250

600
300
LIFT LOBBY IFS-07

2679

2644

2807
SOUTH
-13.51 m FFL
B2-S4
IFS-01

300
2180

2145
-13.66 m SSL POTABLE WATER

250
-10.21
300 m FFL 300
302 206 STORAGE TANK - 2

300
-10.36 m SSL

300
1433 2350 CAPACITY: 365 CUM 500
FHC POTABLE WATER
Q AREA: 59 SQ.M 300

502

0
SAD-2 STORAGE TANK300-2

C39
FHC WATER DEPTH: 6.2M.
CAPACITY: 365 CUM
2584 FREE BOARD: 1.1M. -13.61 m FFL

500
AREA: 65.2 SQ.M

4448
-13.66 m SSL
(FIRE)
(FIRE) (FIRE) -13.51 m FFL WATER DEPTH: 5.6M.
444 LIFT
LIFT
1919 LIFT 18 -13.66 m SSL FREE BOARD: 1.08M.

3053
STORAGE
SUNKEN SLAB ABOVE

3320
SERVICE
SERVICE SERVICE
B3 DOUBLE HEIGHT

2818
STORAGE (B3-L2)
(B3-L2) (B3-L2) FFL -7.68
-13.51 m FFL
B2-33 PRESSUR- (-1.15 m FROM B1 FFL)
-13.66 m SSL PIT DEPTH 1.35 m PIT DEPTH 1.35 m 170
IZATION
-10.21 m FFL PIT SIZE 3.12*2.35 m PIT SIZE 3.12*2.35 m
PRESSURIZATION
1313

406
-10.36 m SSL

7258
11338
3663

22
20
1 21 23
4 24
5 25 10

9
BOH CORRIDOR

B2 TO B1
1266
21 ris.x17.63cm
19 ris.x17.52 cm
B3 TO B2 IWS-04 B2-34
IFS-01

3572
STAIRS -10.21 m FFL
STAIRS HVAC MAKEUP PUMP ROOM

4165
B2-S4 IFS-01

3902
B3-S4 WATERTANK - 1

350
-13.51
-10.21
m FFLm FFL
-10.36 m SSL
-13.66 m SSL
CAPACITY: 125 CUM
350
-13.61 m FFL
350
-13.66 m SSL
200
200
200
R'

700
2254
manteinance access AREA: 65 SQ.M

B2 TO B3

300
350
WATER DEPTH: 1.92M.
IWS-03

350

600
1528
FREE BOARD: 1.08M.

350
11
19 18 17 16 15 14 13 12

C39

111
1691
R 600

350

300
18

350
1278 3291 350
350

599
IWS-03 NRV
1733 1350 6190 GV

2882
BOH CORRIDOR
B2-35 GV

3432
930 HWRP-B2-01
ST 1500
-10.21 m FFL 1800
IFS-01 EV-B2-01 EV-B2-02
001-101
GV GV EWH-B2-08
ST NRV
IWS-03 930
TREATED GREY
WATERBOILER AND HOT 4645 3100
TANK 1000
2429 1400 3774 HVAC MAKEUP

6939
CAPACITY: 82 CUM
WATER SYSTEM TREATED GREY WATER

1905
7170
BOILER AND HOT WATERTANK - 21340
PUMP ROOM IFS-01

700
AREA: 44 SQ.M WATER SYSTEM CAPACITY: 125 CUM
1800
WATER DEPTH: 1.9M. B2-36 AREA: 65 SQ.M -13.61 m FFL
-13.51 m FFL
FREE BOARD: 1.1M. WATER DEPTH: 1.92M. -13.66 m SSL
-13.66 m SSL -10.21 m FFL
FREE BOARD: 1.08M.
1800 -13.61 m FFL

C39
-13.66 m SSL EWH-B2-01

3030
EWH-B2-09 EWH-B2-02 EWH-B2-03 EWH-B2-04 EWH-B2-05
EWH-B2-06 EWH-B2-07

2670
GREY WATER PUMP
MCP-37 MCP-34 ROOM
S'

300
(BOILERS) IWS-03 (CHEMICAL DOSING & 100 200 B2-38
S
FG FG
400 400 400 200

158

250

600
1402 600 2567 400

400
PRESURRIZATION PUMP)

AA-1101-DL-ARC-ALL- 198C

400

400
579

600

250
800
-10.71 m FFL

442

500
IWS-03

610
-10.76 m SSL

400
30437
Door with Access
579 800 800

400
Control

400

3381

1900
001-101
EAD F.B & T.A
CHILLER PLANT
ROOMSMOKE EXHAUST / 700

8020

1529
REF.LEAK EXHAUST FAN

7237

7243
-10.71 m FFL
PRESSURIZATION UNIT CLOSED
ACCESS HATCH ABOVE -10.76 m SSL
EXPANSION

AS
NRV PG
STR BV BV TANK 162

P
IFS-01 538 IWS-03
NRV DV

FHC
CONCRETE PEDESTAL

3936
3000x700x150H LOBBY
TYPICAL B3-66

300
T'

C39
CHILLER PLANT ROOM SMOKE-13.51
LOBBY m FFL
T 1969 600 2000 980

362

1497611

FHC
STORAGE FOR RETAIL B2-G-PP-03 307 B2-S5
-10.36
-13.66mmSSL
SSL

600
B2-37 1955
2430 3308 600 5337 -10.21 m FFL

311
-13.51 m FFL IFS-01

600

1090
C

C
L

L
-13.66 m SSL

600

600

300
300
2013 600 1956 WORKSHOP AREA FOR HOTEL

STARTER

238
2800x700
2473 T
600
DP7 T

289
DP7

C
L

L
STAIRS
DP7 2200 2200

SHAFT
C

C
L

CONSISTENTL2)
937 B3-S5

197
COOLER

COOLER

COOLER
B2-G-PP-03

C
L

L
STAIRS

COND.

COND.

COND.
-13.51 m FFL

FROM
B2-S5
5000 -13.66 m SSL

MECHANICAL
-10.31 m FFL
IFS-01

16004
6485

6354

(WATER
-10.36 m SSL

- 6.63 m FFL
B2-G-WCH-3 B2-G-WCH-2 B2-G-WCH-1 B3 TO
B2

B2-G-PP-01 B2 TO B1

-6.68 m SSL

STARTER

cm
19 ris.x17.63
2800x700
20

21 1
TO BE CONFIRMED B3

2
21 ris.x17.52
B2 TO
WATER COOLED CHILLER 19
22
3

269
WITH MEP CONSULTANT

18
(WCH 1 TO 3)
U'
23
4

17

cm

600
EACH 1100TR FOR RISERS ACCESSIBILITY
16 24
5

25
6
15
IFS-07

7
698
14
76

698

331
8
13
625
PUMP OUT 12 9

10
U

11
700194
SIZE-483Lx722Wx584H

PRESSURIZATION
GREY WATER

STARTER
V'

2800x700

700
1476
COLLECTION TANK
500

1604
B2-G-CP-03 IWS-04 B2-39

2054
1012 3057 122 578

500

661
500
39 500

482
200 500

42
C39
694
3472 979
V 3028

6 1 : 1

197
DP7 200

78
B2-G-CP-02

500

500
1:16

400

3195
DP7 DP7 DP7
411
B2-R-SP-01 B2-R-SP-02 B2-H-SP-01 B2-H-SP-02 B2-H-SP-03 500170 353 50

3950

2796
534 55
401 45

2976

299
6491 67
W'

500
500
B2-G-CP-01 170

144

600
144

204
1 B
201

141

5
1888
5160

209
471 3481

208
1577 1077
W 4568 4010
130
982 1679 11379

- 6.63 m FFL
21 22 23 23a 23b 24b 24a 24 25 26

-6.68 m SSL
C39

ER I F
1 B
P68

C39

ER I F

R E T AW
GENERAL NOTES:

25
C39
C15

R E T AW

1 - KNAT

C20
GFB9-600x600
C5A

7 : 1
2 B OT

51
50
PMA R

49
48
47
46
45
2 - KNAT
7400X3000
LOUVERS

B1 TO GF
. s i r 27
. 7 1 x
0x600 m c 7 3

-6.68 m SSL
N WO D
GFB3-30

-5.96 m SSL
-5.91 m FFL
STAIRS
C20

B1-S5

24b 24a 24
-5.96 m SSL
SMOKE LOBBY
7400X3000
LOUVERS

C20
44
r 13

B1-S5

B1 TO B2
NAS
0002X0004
73+ mqs3

C23
)mqs 8 l a t o t (
OL PARTD

52
53
54
55
-5.96 m SSL

56
-5.91 m FFL

57
58
43
44
C27

FHC

C28
-5.96 m SSL
gn i nepo eer f %

-5.91 m FFL
LV ROOM
PANEL
SERVU

NO I T A Z I RU

W2
SSERP

B1-35

W2
PFC
C27
C5A

C15

(INVERTED)

B1B2-250x700
B1B2-250x700

(INVERTED)
C27
B1B4-500x600

B1B4-500x600

SSL
C28
GFDP1

C28
LC14

-6.68 m SSL
-6.63 m FFL
Ground floor slab edge

FIRE PUMP ROOM

-5.96 m
C27

B1-34
C27
GFDP1

L F F TA
C27

NEKNUS
00
B 50

CERTIFIED FOR CO-ORDINATION AND COMPLIANCE WITH CONTRACT DOCUMENT


BO

GFDP1
x600
-800 LV
GFB6
C27

TX-5
GFDP1

. m5 6 . 1 -
KNAT

BA L S
- 6.53 m FFL
-6.68 m SSL
MV
200mmx200mm STEEL BEAM OR RCC BY CLIENTS

EVOBA
L16

r a e l c
L15

L14
E2

BA L S

SLAB THICKENING
C I L BUP

C I L BUP
5 1 - T F I L

6 1 - T F I L
) 2 L - 3 B (

) 2 L - 3 B (
) 2M - 6 B (

t h g i e h
EVOBA
B1B5-700x1200
B1 & L1 B1 & L1
LV
GFB8-500x1550
E1

D I OV
MEP
C5A B1B4-500x600

C15 B1B4-500x600

TX-4

L F F TA
RO T A L A C S E

C27
CONCRETE PLINTH

m 4
EVOBA
MV

updated

RAMP SLAB
. m0 4 . 2 -

400 THK.
MEP ACCESS CORRIDOR

-5.96 m SSL
-5.91 m FFL
PM/CM CONSULTANT'S REVIEW & APPROVAL:

B1-32
00 LV
B 50
BO
x600
GFDP

FFL. - 6.530
-800
GFB6
GFDP1

TX-3 DOCUMENT REVIEW STATUS DRAWING REVIEW STAMP


C30

BOS 4610
GFDP1

23a 23b
C28

C27

C28
MV
STATUS A: APPROVED
SHELL

-5.96 m SSL
BASEMENT -1
GFDP1

B1B8-200x600
CORE
CONSIDERED FALSE CEILING HEIGHT

-5.96 m SSL
TRANSFORMER ROOM

-5.91 m FFL
AND

PANEL PANEL

C28
PFC PFC STATUS B: APPROVED WITH COMMENTS

B1-30
ELECTRICAL ROOM

344

-5.96 m SSL
FHC

r1
STATUS C: REVISED & RESUBMIT
- 6.53 m FFL
-6.68 m SSL

HV ROOM
NO I T A Z I RU S S E R P
IS 2.9M FROM FFL

- 6.53 m FFL

B1-31

MEP ACCESS CORRIDOR


-6.68 m SSL

29
B1-29
RETAIL

30
FULL HEIGHT SMOKE CURTAIN

27 28
B1-16

LV STATUS D: REJECTED

31
Ø0

Ø0

MV PANEL

-5.96 m SSL
-5.91 m FFL
32
26 SECTION - D
B1B4-500x600

B1B4-500x600

ID ARCH CEILING LEVEL 4.81M


PROPOSED CEILING HEIGHT

33

B1-32
L18
L F F TA

TX-2
- 6.53 m FFL
-6.68 m SSL

C28
34
REFERENCE DWG./DOC.Nos.
37 ris.x17.645cm
NEKNUS

45

35

23
CAVH

8 1 - T F I L
) ER I F (

) 2 L - 3 B (

44
EC I VRES

36
MV
43
IN THIS AREA IS 2.9M

DWG. NO: DESCRIPTION ISSUE DATE

37
42

38
. m5 7 . 1 -

T FAHS

41

39
B1 TO GF
AA-1101-DL-ARC- 103 REV-1
BA L S

BASEMENT 2 FLOOR PLAN 05-FEB-2018

LV ROOM
FIRE LIFT LOBBY

-5.96 m SSL
40

B1-33

-5.91 m FFL
B1 TO B2

SSL
Ø0

Ø0

C27
- 6.53 m FFL
-6.68 m SSL
IDF ROOM

- 6.53 mmFFL AA-1101-DL-ST-ALL-114E REV-2 BASEMENT 1 FRAMING PLAN 28-DEC-2017


-6.68 m SSL
B1-S4
EVOBA

B1-28

STAIRS
L19

B1-S4
-6.68

LV
C5A

C15

AA-1101-DL-MEC-21-259 T05 AC & VENTILATION LAYOUT BASEMENT 2 SOUTH 01-FEB-2018


9 1 - T F I L
) ER I F (

) 2 L - 3 B (
EC I VRES

B1B6-500x2000
C27

22
A
B1B4-500x600

TX-1

C27
01-FEB-2018
B1B4-500x600

CHILLED WATER LAYOUT BASEMENT 2 SOUTH


GFDP

AA-1101-DL-MEC-31-259 T02
MV
AA-1101-DL-PHE-21-259 T01 ABOVE GROUND BASEMENT 2 SOUTH DRAINAGE LAYOUT LAYOUT 01-FEB-2018
C27

GFDP1

5000
GFB6a-800x600 BOB
C27

AA-1101-DL-PHE-31-259 T02 DOMESTIC WATER SUPPLY SERVICES LAYOUT BASEMENT 2 SOUTH 01-FEB-2018

C20
P1 MEP AA-1101-DL-FIR-21-259 T02 FIRE PROTECTION SERVICES LAYOUT BASEMENT 2 SOUTH 01-FEB-2018
MATCH LINE-BASEMENT 1 ( HOTEL AREA )

AA-1101-DL-ELE-41-259 T04 ELECTRICAL SERVICES LIGHTING LAYOUT BASEMENT 2 SOUTH 01-FEB-2018


SSL

B1B3-300x1050
m SSL
-5.91 m FFL

GFB4-900x600
SLAB THICKENING

C20
AA-1101-DL-ELE-31-259 T04 ELECTRICAL SERVICES SMALL POWER LAYOUT BASEMENT 2 SOUTH 01-FEB-2018
-5.96m

MEP ACCESS CORRIDOR

-5.96 m SSL
GFB4-900x600

C20
-5.96

21
-5.96 m SSL
-5.91 m FFL
B1-32
B1 TO GF

27 ris.x17.41 cm
EC I VRES

d i o v

CONTRACTOR PROJECT MANAGER:

SSECCA
7

1 3
e v o b a

ENGR. PRASHANT KAMATH


mq s
R I ATS

HCT AH
0 6 (
%
L

e e r f
N

a e r a

DOOR RELOCATED

RAMP SLAB
400 THK.
Q

PROPOSED CEILING LAYOUT AS PER COORDINATION - 1ST BASEMENT FLOOR PLAN - (SOUTH)
0 2

S
) mq s

SCALE 1 : 75

U
SSL. -0.30

V
00 ISSUED FOR APPROVAL 15-02-2018 ATR MTO

W
SSL. -0.30 GROUND FLOOR
REV. DESCRIPTION DATE DWN CHKD APPD APPD

DRAWING HISTORY
GROUND FLOOR OWNER

P.O. Box: 1334


Tel. No: +974 4442 8664
Fax. No: +974 4442 8661
Website: www.albakerinvestments.com AHH

LEAD CONSULTANT:

SSL. -1.80
GROUND FLOOR P.O. BOX: 1334 DOHA, QATAR +974 4442 3963

SUPERVISION CONSULTANT:

MAIN CONTRACTOR

P.O. Box 23300, Doha, Qatar Tel: +974 4453 9888 Fax: +974 4469 0734
Web: www.redcoalmana.com

MEP SUB CONTRACTOR

PROJECT:
DOHA LIVE PROJECT
FFL. - 6.530 (6B+G+2M+7)
FFL. - 6.530 BASEMENT -1 TITLE

BASEMENT -1 1st BASEMENT( SOUTH)


PROPOSED FALSE CEILING LAYOUT
SECTION - A SECTION - C THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
DRAWING NUMBER: SCALE AS SHOWN ORIG. DWG SIZE: A0 REV.

ABDL-RED-SD-14CD-003-B Sht. 002 of 004 0

Das könnte Ihnen auch gefallen