IPA11-E-043

PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION


Thirty-Fifth Annual Convention & Exhibition, May 2011

EXTENDED THERMAL STIMULATION IN DOWN DIPPING: PART OF FIELD MATURATION


STRATEGY IN DURI STEAM FLOOD

Rosyadi*
Nugroho Jati*
Mezy Maroni*

ABSTRACT 2. Improve thermal stimulation success on the


area with typically lower potential and enhance
An effort to stimulate with extended thermal oil recovery from down dip reservoir.
stimulation in new development wells at down
dipping in Duri field, especially in Eastern part of METHODS
Area 8 which is mainly not supported by injectors
applied by utilizing cyclic or mobile steaming unit. Area 8 Eastern part sediment was developed as
The aims are to improve performance new mouth bar which has lower reservoir quality
development wells at down dip area by improving compared within this Area (transgressive channel),
its wellbore performance and boosting production coarsening upward with higher both Permeability
performances by connecting the steam from injector and resistivity on upper section of the formation.
to producer well and improve thermal stimulation This part of Area 8 had highest dipping angle which
success on the area with typically lower potential is 5 degree with no bottom water detected. At this
and enhance oil recovery from down dip reservoir. area also only found single formation, Duri Sand.
  Practically there are no dedicated observation wells
INTRODUCTION at flank Area 8 and no peripheral injector to support
flank down dip producer. Therefore the flank area
Reservoir in Duri Field is unconsolidated Sand in eastern part of Area 8 is remained unsupported
reservoir and majority completed with open hole by thermal flooding as described in Figure 1.
gravel pack. Fluids properties are heavy oil with 18 Border wells at this section are also still cold shown
– 22 API degrees and steam flood enhance oil by Figure 2. These wells are located at lower
recovery methods had been applied since more than structure compared to injector and it makes steam
25 years ago. Majority of the fields are already relatively reluctant to reach these wells since the
mature, however new development wells aiming at steam already had its flow to structurally up dip
down dip area are still cold and had challenge to wells. Some wells also experienced decreasing
improve inflow performances on these wells. In temperature since 2008 which might be impacted by
inverted 9-spot pattern, new wells that reducing amount of steam injection at this section.
stratigraphically lower than other wells are less Based on this condition we proposed to have
affected by the steam injection from injector well, thermal stimulation on the border wells which has
since steam already found pathways to existing low possibility to be reached by steam, the
producers. stimulation itself need to be diverse from the
ordinary huff and puff job since this section has
This paper describes an effort to stimulate with lower structure and had different reservoir character
extended thermal stimulation utilizing cyclic or than most Area 8, therefore we proposed extended
mobile steaming unit in new development well at thermal stimulation for these wells.
down dipping in Duri field which is mainly not
supported by injectors. The objectives as follows: Extended thermal stimulation was basically putting
greater amount of steam to down dipping producer
1. Improve performance new development wells and closely monitors its steam character, especially
at down dip area by improving its wellbore injection rate and steam quality. Proposed total heat
performance and boosting production injection between 4 – 8 BBTU/job. The plan
performances by connecting the steam from forward is conducting study and analysis to
injector to producer well. correlate amount of steam injected at down dipping
producer wells to inflow performance and
* PT. Chevron Pacific Indonesia temperature trend after steam stimulation.
RESULTS 1. Previously these Cold-Side border wells was
hardly can be matured with conventional
During 2009-2010, this study had executed 15 wells flooding methods.
in down dipping Eastern part of Area 8 in Duri
Field. The amount of heat injected was varying 2. Extended H&P in this down dipping Area has
between 4 – 8 BBTU/job. With approximately 200 successfully increase its removable reserve and
until 300 Barrel steam per day injected through develop steam connection from injector to
casing annulus so that these wells need to be put on producer. This method also improves wells
injection almost 2 until 4 month periods. To gain optimization by increasing flow capacity and
accurate injection data, injection pressure, steam maintains stable temperature which affect to
rate, and steam quality should be closely measured production performance and lifetime of its
and monitored during job execution. Based on artificial lift.
Steam quality measurement the result is ~60%
Steam quality, this condition might be caused by Lessons learned:
longer injection line between steam generators to
Eastern part of Area 8. 1. Long extended periods may better stimulation
for unvisited flank wells.
From overall extended Thermal stimulation Job,
this method had successfully increased average 2. Thermal stimulation proven to be effective to
112% oil gain per job. The other positive impact on accelerate inflow production for cold wells at
this stimulation method had successfully heating down dipping areas.
further reservoir at Eastern part of Area 8, this is
concluded from wells which had stable temperature Best practices adopted and to share:
more than 170 o F for more than 1 year period. This
condition showed that some wells had successfully 1. Utilize portable steam generator to accurately
connected the steam from injector to producer well control steam pressure, injection rate, and steam
(Figure 3). quality.

Study resulted that in down dipping reservoir has 2. Rapidly measure and recalculate stimulation
31% relationship for steam injection and relative oil design during injecting periods.
gain. It means that the steam injected mostly impact
on the stimulation result. From R square data have Challenges on the project:
25% and 31 % of good correlation between total
amount of steam injected and incremental Fluid and 1. Significant difference structure of dip producers
Oil rates. The correlation of steam injection and oil and injector.
gain per job are represented in Figure 4.
2. Execution during rainy season had impact on
Figure 5 described that each of extended thermal some schedule changes and creates obstacle
stimulation job impacted to production during stimulation.
enhancement with estimated life time more than
360 days per Job. This effort had successfully 3. Steam quality measurement are moderately high
increase total additional reserve of 113 MMBO cost
within 1 year stimulation. In the end, extended
thermal stimulation has succeeded to maintain wells ACKNOWLEDGEMENT
temperature performance and success to arrest
decline on the stimulated area. We would like to Thank you BP MIGAS and PT.
Chevron Pacific Indonesia for allowing us to
CONCLUSIONS present this study at IPA Convention and exhibition
in May 2011. Also we would like to Rizal Haroen,
Summary from this extended thermal stimulation Gregg Molesworth, Anang Sofyan and Supriono
are: Hariyadi for supervising and supporting us on this
project.
Figure 1 - Eastern Part of Area 8 Duri Field with approximately 5 degree dipping from west to east
direction.

Figure 2 - Eastern Area 8 with border wells are still cool especially on the side wells.
Figure 3 -Extended stimulation result, temperature shown increase and impacted on increasing
oil volume. These methods considered successful from temperature trend which is
stable after 1 year lifetime.

Figure 4 -BBTU steam injected vs Barrel fluid-oil Gain correlation: From R square data had
shown at 25% and 31 % of good correlation between total amount of steam injected
and incremental fluids and oil Rates.
Figure 5 - Normalized Oil Production. Increasing average 112% oil gain/job with expected life
time of 360 days.