COMPANY NAME TOYO BATANGAS PROPERTY CORPORATION

BID PACKAGE DESIGN & BUILD OF TOYO BATANGAS WAREHOUSE
PROJECT LOCATION Block A, Lot 4‐ T‐161038 and Lot‐5 T‐161039, Progress St., LISP III, Brgy. San Rafael, Mun. of Sto. Tomas, Batangas Province

SUMMARY OF TECHNICAL & COMMERCIAL ACCEPTANCE RESULTS

Rating Scale Definition
5 Outstanding Exceedingly complies with the project requirement
4 More than Acceptable Complies with the project requirement plus added value
3 Acceptable Complies with the project requirement
2 Incomplete Complies but with 1 or 2 lacking documents
1 Non‐compliant Non‐compliance, lacking more than 2 requirements

EVALUATION RESULTS
BIDDERS TECHNICAL (60%) COMMERCIAL (40%)
FINAL RATING
RZB JAB GLI AVE. WT. TAI VCO GLI AVE. WT.
1 ASDEC & BMB & A J‐S CO. 1.63 1.63 1.56 1.60 0.96 2.15 2.31 2.15 2.21 0.88 1.84 Non‐compliant
2 PROVIDERE INC. 1.94 1.94 1.88 1.92 1.15 2.54 2.38 2.54 2.49 0.99 2.14 Incomplete
3 21TH CONST. DEV. CORP. 2.31 2.31 2.38 2.33 1.40 2.23 2.69 2.62 2.51 1.01 2.41 Incomplete
4 GRANDSPAN DEV. CORP. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DECLINED

BEST 2 BIDDERS:
1 21TH CONST. DEV. CORP. ‐ with evaluation rating of 2.41 (Incomplete)

2 PROVIDERE INC. ‐ with evaluation rating of 2.14 (Incomplete)

FINAL EVALUATION REMARKS:

Evaluators‐Technical: Evaluators‐Commercial:

REY ZALDY V. BENITEZ TENESEE A. ILAGAN
Associate Manager Procurement Assistant Manager ‐ Cebu
Design Technical & Estimating Sections Purchasing Department
Engineering Department

JOEL A. BUREROS VINA CLARISSE A. OSIAS
Manager, MEPF Quantity Surveyor I
Operations Department Project Management & Controls Department

GIL L. ITURRALDE
Project Manager
Toyo Batangas Warehouse Project