CALCULATION Rekind
\
Arm PERTAMINA
FOIVONSTRUCTION
sign: Date:5-(0- 2417
M APPROVED r ENG
NOT APPROVED
11
DATE CHECKED APPROVED
-1.4
r
0 26-Sep-17 Issued for Review 4iTSY ;D N 1t1R/ARD
l-
DI DI DI DI
DIBUAT
REV. TGL URAIAN PERIKSA SETUJUI PERIKSA SETUJUI
REKAYASA PERTAMINA
Ilk
Ar PERTAMINA
CALCULATION Rekind
LEMBARAN REVISI
TABLE OF CONTENTS
1.0 INTRODUCTION 4
2.0 OBJECTIVES 5
3.0 REFERENCES 5
4.0 DEFINITIONS 5
5.0 DESIGN BASIS 6
6.0 METHODOLOGY 6
7.0 RESULT 9
ATTACHMENT-1 10
11111.
PERTAM1NA
CALCULATION Rekind
1.0 INTRODUCTION
PT. Pertamina (Persero) Directorate of Marketing and Commerce, intends to carry out the
construction of pressurized LPG terminal in line with the government's program to reduce fuel
subsidies of land for household tumble to LPG.
By the conversion of fuel from kerosene to LPG, the LPG demand in the future will continue to
increase while the facility receiving, storage and distribution of liquefied petroleum gas (LPG terminal)
available is not sufficient, so it should be added hoarding LPG facility, to anticipate the needs of LPG in the
future in order to avoid a crisis availability of LPG in the community.
S.1.1i1'1671C.ir;61,a SW,“).:.1..iN
,
2.0 OBJECTIVES
The objective of this calculation is to determine optimum specification for LPG Transfer Pump (P-
11/12) at "Terminal LPG Pressurized Depot LPG Layang."
3.0 REFERENCES
- PROJECT DOCUMENT
4.0 DEFINITIONS
The definition contained in the contents of this procedure and other procedures are as follows :
PTM : PT. Pertamina (Persero) Directorate of Marketing and Commerce as the
owners and users of the facility or equipment.
Contractor : PT Rekayasa lndustri
Vendor/Subcontractor : The party which provides manufacture/fabrication or construction or
erection equipment/material specified and ordered by Contractor.
Site : The right-of-way and places provided by the Employer where the
construction works are to be executed and any other places as may be
specifically designated in the Contract as forming part of the Site.
However, Case 1 is used as a basis in this calculation. [Ref. Jawaban Aanwijzing Pertarnina].
3. LPG Transfer Pump is operated based on 2 x 100%, 1 (one) pump is on duty and 1 (one) pump is
stand-by.
6.0 METHODOLOGY
Calculation method for LPG Transfer Pump is based on these following steps:
.ty =
3600 x A
Where,
V = calculated velocity, m/s
Q = volumetric flow rate, m3/hr A
= pipe surface area, m2
p x ID x v
Re =
Where,
Re = Reynolds number, dimensionless
= volumetric flow rate, m3/hr
A = pipe surface area, m2
1 E 1.26
= —4 log + Ref
3.7ID
]
Where,
fm = Fanning friction factor, dimensionless
= pipe roughness, mm (Values of c for various materials are given in Table 1)
ID = pipe inside diameter, mm
Re = Reynolds number, dimensionless
16
frn =
Re
Ar PERTAMINA
CALCULATION Rekind
APf = 0.02xf.mxTixpx V 2
Where,
Pf= friction loss per 100 m, kgf/cm2/100 m fm
Total suction pressure (SP) = Min. suction drum pressure ± Min. static head — Friction loss
Where,
SG = specific gravity
Differential Pressure (kg f /cm2) = Total discharge pressure — Total suction pressure
HxQxSG
BHP =
367.1xn
SP, max = Max. Suction Drum Pressure + Max. Static Head — Friction Loss 4.
7.0 RESULT
Below are the summarize of LPG Transfer Pump Calculation (details on Attachment-1):
ATTACHMENT — 1
LPG TRANSFER PUMP CALCULATION
•
HI-ILL +14916
A
EL +730(;
Pipe Rack
Lai_ +600 ir
.- • - • - • - • -
11(9.11 FL
EL +1430 LPG Metering
*PIP
EL ./400 +200 Package •
in milimeters unit
4. Vie. Min./NcriMaa. (cP) 0.127 / 0.114 / 0.114 Temperature (T) 35.0 / 35.0 / 35.0
) 8.508 ) 0.517 / 0,517 0.517
5. Vap. Press.max. (Kg/cm'A Sp.Gr. F
6. Cap.Nornes/Overdes. (m'ihr) 167 / 167 / 0.0% Viscosity (0) 0.114 / 0.114 / 0.114
1. Line Size ANSI I ANSI / ANSI
3) SUCTION CONDITIONS Nominal Pipe Size (inches) 6" / / 4"
0. Destination MID1 / MID2 / PUMP Thickness - ) STD / STD I STD
Flow Rate (m31u) 167 / 167 Pipe Inside Dia. (mm) 154.08 / 202.74 / 102.26
Temperature (-C) 35.0 / / 35.0 Pipe Roughness (mm) 0.0457 / 0.0457 / 0.0457
Sheet 11 of 11