WAREHOUSE NORTHFIELDS
MANPOWER MANPOWER
Mario Mario
Edwin Rap
Franco Ronel
Mamer Kianu
Junior Jerwin
Marlon Kenneth
Richard Rafael
Throwa Leo
Miko Allan
Dindo Jomar
Loloy Lawrence
Raymart ACTIVITIES
Marvin Plastering
Macmac CHB Laying
James Setting of C-Purlins
Samer MATERIALS REQ.
ACTIVITIES 10 pcs 10mm Rebars
Plastering 10 pcs 9mm Rebars
Setting of Slab Reinf.
Spreading of Filling Mats.
Sieving
MATERIALS REQ.
1 load White Sand
BUNSURAN
MANPOWER
Emi
Nane
Anthony
Gerald
Mono
Nono
Isidro
Macmac
Eboy
Glen
Rene
ACTIVITIES
Tiles Setting
Concreting of Slab
Painting Works
Electrical Works
MAYSANTOL
MANPOWER
Jonjon
Zaldy
Roger
Aldo
Marlon
Gilbert
Adrian
Romy
Ponce
Albert
Alex
Jovan
Jason
Tolits
Danilo-M
Robert
Lester
Joel
ACTIVITIES
Tiles Setting
Installation of Ceiling Frame
Painting Works
Plastering
MATERIALS REQ.
10 bags Adhessive
Vibro Sand
BUNGAHAN
MANPOWER
Dani
Eric
Ricky
Mark
Egay
Arnold-M
Peter-M
Darwin-L
Kimpee
ACTIVITIES
Plastering
CHB Laying
Fabrication of Stirrups
8/15/2019 Sunny Thursday 8/16/19 Sunny Friday
MAYSANTOL NORTHFIELDS
MATERIALS REQ. MANPOWER ACTIVITIES
1 load Gravel Mario Tiles Setting
1 load Sand Rap Chipping of Slab
100 pcs 60x60 Granite Tiles Ronel Electrical Works
10 bags Tile Adhessive Kianu MATERIALS REQ.
10 pcs 10mm Rebars Jerwin 100 pcs 60x60 Granite Tiles
Vibro Sands Kenneth 150 pcs 40x40 Tiles
Rafael 10 bags Adhessive
BUNGAHAN ACTIVITIES
MANPOWER Plastering WAREHOUSE
Dani Setting of Beam Reinf. MANPOWER
Eric MATERIALS REQ. Samer
Jefbrix 30 bags Cement Mamer
Mark Vibro Sand Junior
Egay Richard
Arnold-M BUNGAHAN Marvin
Peter-M MANPOWER Miko
Darwin-L Dani Marlon
Kimpee Eric Raymart
Ricky Jefbrix James
ACTIVITIES Mark Franco
CHB Laying Egay Throwa
Plastering Arnold-M Mario
Peter-M Edwin
NORTHFIELDS Darwin-L Macmac
MANPOWER Kimpee ACTIVITIES
Mario Ricky Plastering
Rap Philip-P Setting of Slab Reinf.
Ronel Plumber 2
Kianu ACTIVITIES
Jerwin Plastering
Kenneth MATERIALS REQ.
Rafael 50 bags Cement
ACTIVITIES Vibro Sands
Concreting of Columns
Plastering MAYSANTOL
MATERIALS REQ. MANPOWER
1 load Gravel Jonjon
1 load Sand Lawrence
Roger
Aldo
Marlon
Gilbert
Adrian
Romy
Ponce
Albert
Alex
Jovan
Jason
Tolits
Danilo-M
Robert
Lester
Joel
Leo
Allan
Jomar
ACTIVITIES
Plastering
Tiles Setting
Installation of Dry Wall
Partition
Concreting of Slab
MATERIALS REQ.
50 bags Cement
Vibro Sands
1 load White Sand
BOROL 2ND
MANPOWER
Jason
Itik
Ian
Edmond
Wancho
Randy
Raymond
Jemar
ACTIVITIES
Concreting of Tie Beam
CHB Laying
MATERIALS REQ.
50 bags Cement
BUNSURAN
MANPOWER
Emi
Anthony
Gerald
Nane
y Wall Frame Nono
Isidro
Macmac
Glen
Rene
8/19/19 Sunny Monday 8/20/19 Sunny Tuesday 8/21/19 Sunny Wednesday
MAYSANTOL BUNSURAN
MANPOWER MANPOWER
Jonjon Emi
Roger Anthony
Aldo Gerald
Marlon Nono
Gilbert Nane
Adrian Mono
Romy Macmac
Ponce Isidro
Albert Leo
Alex Allan
Jovan Jomar
Jason Lawrence
Tolits Eboy
Danilo-M ACTIVITIES
Robert Tiles Setting
Lester Ground Preparation
Joel Painting Works
Arman Installation of Roof
Zaldy MATERIALS REQ.
ACTIVITIES
Tiles Setting
Plastering 150 pcs 40x40 Tiles
Drywall Partition 5 bags Tile Adhessive
Painting Works
BOROL 2ND
MANPOWER
Jason
Wancho
Randy
Ian
Itik
Edmond
ACTIVITIES
Setting of Column Forms
Concreting of Column
CHB Laying
MATERIALS REQ.
1 load Gravel
600 pcs 5" CHB
BUNGAHAN
MANPOWER
Dani
Eric
Mark
Egay
Arnold-M
Kimpee
Ricky
Mokmok
ACTIVITIES
Plastering
Concreting of Slab
MATERIALS REQ.
1 load Gravel
1 load White Sand
2 load Panambak Lahar
40 pcs 9mm Rebars
5 kgs G.I. Tie Wire.
8/22/19 SUNNY THURSDAY 9/23/19 SUNNY FRIDAY