Beruflich Dokumente
Kultur Dokumente
RP
No. 166
PROGRESS REPORT
Prepared by DELUGE
3. QA/ QC
Balance Punchlist;
1. High Vibration Dust Suppression Pump #2
4. Engineering Issues
- No Issues
5. Aboveground
High Vibration Electric Pump Power Island;
- Pump Performance Test/ Vibration Test;
Condition:
- Pump flow 1500 GPM
- Throttle at Flow Meter Butterfly Valve
All vibration on Horizontal, Vertical, Axial DE & NDE bearing now are below 4.5 mm/s (Alert High).
6. Underground
- Backfill, compaction and add gravel at TT-8 area, BC-17 Area, TT-10 area, TT-2 area
done.
7. Fire Alarm
- Repair Horn Strobe because of no response at 1BAT10 done.
8. Dust Suppression
- High Vibration Dust Suppression Pump #2;
Action:
a. Deluge found vendor to repair the pump, pump will take out from Babelan Site and
bring to Pump Repair Vendor workshop at Jakarta area.