Payback period calculate table.

Payback period of improving the power factor. (New installation)


MEA and PEA will be charged for the power factor (PF) and type 3 consumers Medium Business Large Category 4 and Category 5, the Company will be specifically charged by the kVAR PF maximum In excess of percentage
61.97 (PF <0.85) of the energy demand peak in the rate of kVAR at 56.07 baht (fraction of kVAR, if less than 0.5 kVAR dropped from 0.5 kVAR up. To represent 1 kVAR)

** Enter the value in the red **


Transformer Rated 1,600 kVA. Current Rate of Transformer 2,309 A
Maximum power 1,000 kW kVA _ Before (S1) 1,429 kVA
P.F. _ Before (PF1) 0.70 kVAR _ Before (Q1) 1,020 kVAR
P.F. _ After (PF2) 0.95 Current _ Before (I1) 2,062 A
P.F. Charge rate 56.07 Baht / kVAR kVA _ After (S2) 1,053 kVA
Line voltage 400 V kVAR _ After (Q2) 329 kVAR
Capacitor Bank price 350,000 Baht / Set Current _ After (I2) 1,519 A
Loss (Trans+Power cord) 20 kW Loss (Trans+Copper) _ After 14 kW
Capacitor Loss 0.5 W/kVAR Total Loss 5.7 kW
Electricity Rate (Average) 3.02 Baht / Unit Capacitor required 692 kVAR

P.F. Charge 22,484.07 Baht / Month 269,808.84 Baht / Year

Energy charge reduce 22,616.96 kWh / Year

Save costs 338,112.1 Baht / Year

*** Payback period *** 1.0 Years


1) Values in red text of the electric bill.

1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)

2) When entering values in the table completely. The calculated values and payback period.