Sie sind auf Seite 1von 6

SM ENGINEERING DESIGN AND DEVELOPMENT

22 April 2019 Post Earthquake Report


Tier 1 Tier 2 Tier 3
Item Project/Branch Mall, Construction Customer Visible Damage None Customer Visible Damage
Operation Affected
SM City San Fernando Downtown

1 ChinaBank Side Perimeter Wall Damaged EIFS

2 Perimeter None PNB Side Perimeter Wall Damaged EIFS

3 Cracks on PWD Ramp

4 Raised flooring / paver blocks

5 Removed wall platerings from Groud to 5th Level


Helical Ramp None
6 Broken window glass

7 Fire Exit - Removed Wall Platerings

8 Fire Exit - Wall Cracks

Ground Floor - Mall None


Proper
9 Out of Service Passenger Elevator #2

10 Raised flooring / tiles on escalator landing

Second Floor - Mall None


Proper
Page 1 of 6
11 Second Floor - Mall None Raised flooring / tiles on mall common area
Proper
12 Fire Exit - Removed Wall Platerings
13 Fire Exit - Wall Cracks
14 Back Alley - Removed Wall Plasterings

15 Raised flooring / tiles on escalator landing

16 Raised flooring / tiles on mall common area

17 Third Floor - Mall Damaged echostop ceiling on IT Zone


None
Proper
18 Wall cracks on CR Hallway

19 Detached tiles on Male CR


20 Detached tiles on Female CR
21 Raised flooring / tiles on escalator landing
22 Raised flooring / tiles on mall common area

23 Damaged common ceiling on Cinema 3 Hallway

Damaged echostop ceiling on Cinema 1 and 2


24
Fourth Floor - Mall Hallway
None
25 Proper Wall cracks on Cinema Hallway
26 Detached mirror on Male CR - Mall
27 Detached tiles on Male CR - Mall
28 Detached tiles on Male CR - Cinema
Detached air relief valve on AHU Chilled
29 Water Pipe
30 Carpark Staiway wall cracks

31 Wall Cracks on Admin Hallway


Fifth Floor None
32 Damaged chilled water riser insulation
Detached air relief valve on chilled water
33 riser

Page 2 of 6
34 Sixth Floor None Carpark Staiway wall cracks Wall Cracks on CRS Office Hallway

35 Seventh Floor None Carpark Staiway wall cracks Misaligned GenSet

Page 3 of 6
27-Aug-19
ril 2019 Post Earthquake Report

Timetable to fix the Remarks


damages

ICC already delivered materials for repair


May 11, 2019 last 4/27, still awaiting approval of access
from ChinaBank

ICC already delivered materials for repair


May 11, 2019 last 4/27, still awaiting approval of access
from PNB

No feedback yet from Mall Operations and


- Design
No feedback yet from Mall Operations and
- Design
JENE Construction already mobilized last
May 11, 2019 4/27
No feedback yet from Mall Operations and
- Design

JENE Construction already mobilized last


May 11, 2019 4/27

Passenger Elevator #2:


- Misaligned counterweight
- Misaligned guide rail
May 1, 2019 - Detached pit buffer spring
- Inverter Lockdown
NTP already released to Hyundai last 4/27

JENE Construction already mobilized last


May 11, 2019 4/27
Page 4 of 6
JENE Construction already mobilized last
May 11, 2019 4/27

JENE Construction already mobilized last


4/27

ICC already delivered materials for repair


May 11, 2019 last 4/27

JENE Construction already mobilized last


4/27

JENE Construction already mobilized last


4/27

ICC already delivered materials for repair


last 4/27
May 11, 2019

JENE Construction already mobilized last


4/27

April 23, 2019 Rectified last 4/23

JENE Construction already mobilized last


May 11, 2019 4/27
April 23, 2019 Rectified last 4/23

April 23, 2019 Rectified last 4/23

Page 5 of 6
JENE Construction already mobilized last
May 11, 2019 4/27
April 27, 2019 Rectified last 4/27

Page 6 of 6