Formulir
FML-QCWT-04
CATATAN INSPEKSI PEMOTONGAN Form No.
FORMULIR Tanggal
CUTTING INSPECTION RECORD 30-May-18 Rev. 1
FORM Date

Client E Record No.


Project & Lot Equipment No.
Tower Type

J1
J5
M1 M2
T1 J3 T4
T3
J2 J4
T2 T5
T

F
* T : at least checked 5 places

Dimension Operator Visual


No Shell No.
Tolerance J1 J2 J3 J4 J5 M1 M2 F E Cutting T1 T2 T3 T4 T5 Ok / Not Ok

Dwg ±3 mm

Actual -

Dwg ±3 mm

Actual -

Dwg ±3 mm

Actual -

Dwg ±3 mm

Actual -

Dwg ±3 mm

Actual -

Inspected by : ___________________ Reviewed by : ___________________

Date : Date :
No. Formulir
FML-QCWT-04
CATATAN INSPEKSI PEMOTONGAN Form No.
FORMULIR Tanggal
CUTTING INSPECTION REPORT 30-May-18 Rev. 1
FORM Date

Client GE Report No. KPS/CUT/086/19


Project & Lot Additional Test (Tracking Offset 2 & 4) Equipment Measuring Tape

T1 T3 T4
J1
J2 J5
M1 M2 J4
J3
T2 T5
T

F * T : at least checked 5 places

Dimension Operator Visual


No Shell No.
Tolerance J1 J2 J3 J4 J5 M1 M2 F E Cutting T1 T2 T3 T4 T5 Ok / Not Ok

SH-01-01 PK Dwg ±2 mm 1500 10321,6 10321,6 10212 10212 13,50


1 53193101 Suprani OK
SK 49177 Actual - 1501 1502 1502 1502 1502 10320 10321 10211 10211 13,45 13,30 13,53 13,44 13,60

SH-02-01 PK Dwg ±2 mm 1500 10321,6 10321,6 10212 10212 13,50


2 53193101 Suprani OK
SK 49177 Actual - 1502 1502 1502 1502 1502 1320 10321 10211 10211 13,36 13,47 13,63 13,58 13,54

Dwg ±2 mm

Actual -

Dwg ±2 mm

Actual -

Dwg ±2 mm

Actual -

Inspected by : Rio Bitang Reviewed by : Andi Iskandar

Date : 19-06-19 Date : 18-07-19