Beruflich Dokumente
Kultur Dokumente
730E
• Productivity
• Reliability
• Economics
Performance
• Superior electric
drive performance
• Safe, reliable
braking and
retarding
• Excellent vehicle
handling
characteristics
Productivity Advantages
• Advanced
technology
structures &
components
• Proven powertrain
• Integrated support
for substainable
reliability
Reliability Advantage
Fuel savings +
Tire cost control +
Maintenance cost advantage =
Lowest life-cycle cost per ton
Economic Advantages
730E Systems
Specifications
Specifications
27’8” 8.43 m 11’3” 3.43 m
41’1”
12.51 m
RAISED
3’9”
1.14 m
18’5” 20’6”
5.61 m 9’6” 6.25 m
2.90 m EMPTY
45°
5’9”
1.76 m 3’9” 1.14 m
22’6” 6.85 m
Drive System
AC/DC
Current
• G.E. GTA-22
alternator
• Dual Impeller
traction-type
Fuelsaver
Engine/Statex III System
Integrated Control System
Alternator
Engine
Wheel
Motor
• Deck level
access to all
vital power
controls
Statex III Drive System Control
Wheel Motor
• G.E. 788
• 1800-2100 rpm
at full load
Retarding Grid
• Continuous rated
grids
• 18-element grids
• 3700 hp (2759 kW)
maximum
• 3-step extended
range retarding
Gradeability in Retarding
730E Haulpak / 18-PL / vs Mechanical
15
Continuous Retarding
730E
GVW = 715,000 lb * Mech
Speed on Grade
730E Mech
Grade in Percent
10
-7% 37.2 22.0
-4% 48.9 40.1
20
GVW = 715,000 lb
15
10
0
0 5 10 15 20 25 30 35 40
Speed in mph
Gradeability Comparison
730E Haulpak vs Mechanical
30
730E
Mech
25
Max. Gradeability 23.7%
Grade in Percent
20
15
GVW = 324 320 kg
10
0
0 5 10 15 20 25 30 35 40 45 50 55 60
Speed in km/h
Gradeability Comparison
730E Haulpak vs Mechanical
30
730E
Mech
25
Grade in Percent
20
GVW = 715,000 lb
15
10
0
0 5 10 15 20 25 30 35 40
Speed in mph
Gradeability Comparison
730E Haulpak vs Mechanical
30
730E
Mech
25
Grade in Percent
20
GVW = 324 320 kg
15
10
0
0 5 10 15 20 25 30 35 40 45 50 55 60
Speed in km/h
Gradeability Comparison
730E Haulpak vs Mechanical
30
730E
25 Mech
GVW = 715,000 lb
Grade in Percent
20
Speed on Grade
15 730E Mech
12% 6.4 mph 6.6 mph
10 10% 8.0 7.6
8% 10.3 9.6
5
0
0 5 10 15 20 25 30 35 40
Speed in mph
Gradeability Comparison
730E Haulpak vs Mechanical
30
730E
25 Mech
GVW = 324 320 kg
Grade in Percent
20
Speed on Grade
15 730E Mech
12% 10.3 km/h 10.7 km/h
10 10% 12.9 12.2
8% 16.6 15.4
5
0
0 5 10 15 20 25 30 35 40 45 50 55 60
Speed in km/h
Acceleration Comparison - Loaded
35
30
25
Speed in mph
20
15
10
Electric Drive
5
Mechanical Drive
0
0 5 10 15 20 25 30 35 40 45 50 55 60 65
Time in Seconds
Acceleration Comparison - Loaded
55
50
45
40
Speed in km/h
35
30
25
20
15
10 Electric Drive
5 Mechanical Drive
0
0 5 10 15 20 25 30 35 40 45 50 55 60 65
Time in Seconds
Cummins K2000E V-16
Engine
Specifications
• Engine monitoring,
diagnostics,
prognostics and
performance
• Service management
capabilities
The CENTRY™ Electronic
Fuel System
• Exceptional fuel
efficiency and
diagnostics
• Adjustable all-speed
governing
• Intermediate speed
control
• Improved transient response and isochronous
governor droop capability
• Castings used in high
stress areas
• Fabricated box-section
• Integrated ROPS
support
• Continuous horsecollar
• Rear tubular cross
members
Frame
Frame Specs
Body
Canopy Sheet & Bolster Front Sheet
0.2” (5 mm) 100,000 psi (690 mPa) 0.50” (12 mm)
tensile strength steel 400 BHN Nominal
Floor Sheet
0.75” (19 mm)
400 BHN Nominal
Side Sheet
0.35” (9 mm)
400 BHN Nominal
Bolster
0.35” (9 mm) floor & side
0.31” (8 mm) front floor
100,000 psi (690 mPa)
tensile strength steel
Hydraulic System
Service Capacities
Hydraulic System
193 U.S. gal (731 L)
Hydraulic Pumps
Hoist Pump
Gear-type with output of
135.6 gpm (513 liters/min)
at 1900 rpm and 2500 psi
(17 240 kPa)
Suspension
Front Suspension
• Forged front suspension rod and
housing tube
• Large casting steel mounts
• Extra-length bronze bearings
• Maximum front stroke 13.2” (335 mm)
Rear Suspension
• Rear suspension pin and clevis
• Variable rate hydro-pneumatic with
integral rebound control
• Maximum stroke 11.0” (279 mm)
Rear Pin Hitch
High Mounted Rear
Axle Hitch Pin
92’ (28.0 m)
Turning Circle
730E
SAE Steering Course
5 x max width over tires 25 m
A = 1.10 x the tire track circle or 14 m,
whichever is larger.
Corridor 4
B = 1.75 x the tire track circle or 22 m,
A
whichever is larger.
C = 2.00 x the maximum axle spacing
Corridor 3
Finish 2 or 15 m, whichever is smaller.
Finish 1
40 m
C
30 m
B
C
Steering meets
Corridor 2
SAE J1511 standards
Corridor 1
10 m
20 m
Start 1
Start 2
1.25 x max width over tires
Braking System
Braking System
• All-hydraulic, dry-disc
mechanical service
brakes are designed to
stop the truck anywhere
within its performance
envelope
• Electric retarding is
primary means of
controlling speed and
deceleration
• Service brakes primary
means of stopping truck
• Mechanical service
brakes will stop the truck
Front Service Brakes
• Front inboard-
mounted 46”
(1168 mm)
diameter wheel
speed disc brakes
with a 3-caliper
design on each
brake
Rear Service Brakes
• Rear armature
speed brakes
feature dual
25” (635 mm)
diameter disc
with a single
caliper per
disc
Emergency Brakes
• Front, rear, and
parking - apply
automatically
when hydraulic
system pressure
drops below the
level necessary
to meet
secondary
stopping
requirements
Wheel Brake Locks
Parking Brakes
• Spring-
applied and
hydraulically
released
Electric Dynamic Retarder
Safe and Reliable
Service Brakes
• Exceeds SAE J1473 brake performance standard
• SAE J1473 test summary:
- Truck tested at max. GVW
- Tested on 8-10% grade
- 5 consecutive stops from 30 mph (48 km/h)
- Maximum 20 minutes between stops
- Additional stop simulates worst-case
single brake failure
Brake Codes
Safe and Reliable Service Brakes
SAE = 331 ft Actual = 190 ft
58%
Actual
SAE J1473
Excellent Vehicle Handling Characteristics Start with a
Safe and Comfortable Operator Environment
Cab
Cab
Rock service, tubeless radial tires 37.00 R57
Rim Base
Preventative
Maintenance Tool
• Engine, wheel motor, tire
and payload parameters
• Monitors
temperature
and levels
on-the-go
• World leader in computer
based mine management
systems
• Installed in over 90 mines
worldwide
• Increased productivity - as
high as 32%
Modular Mining
730E Projected MTBO
Rebuild R&R
Component MTBO Man Hours Man Hours
Engine 15,000 300 16
Wheel motor 20,000 275 24
Alternator Engine Life 48 24
or Greater
Steering accumulator 13,500 6 5
Steering cylinder 10,000 4 5
Hoist cylinder 16,000 12 8
Front suspension 14,500 12 24
Rear suspension 15,500 8 12
Front spindle assembly 14,500 20 15
Steering pump 9,500 10 9
Hydraulic pump 9,500 2 3
Front brake assembly 14,500 2 16
Front brake pads 7,200 -- 10
Rear brake assembly 10,000 3 16
Rear brake pads 5,000 -- 3
730E World Population
Total 105
12
10 10
60 18