Sie sind auf Seite 1von 635

L&T CONSTRUCTION

WATER & EFFULENT TREA

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
S.no

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
PORBANDAR UGD

# Sensitivity: LNT Construction Internal Use


LPS-2

# Sensitivity: LNT Construction Internal Use


2

# Sensitivity: LNT Construction Internal Use


4

# Sensitivity: LNT Construction Internal Use


6

# Sensitivity: LNT Construction Internal Use


8

#
9
Sensitivity: LNT Construction Internal Use
9

10

# Sensitivity: LNT Construction Internal Use


11

#
12
Sensitivity: LNT Construction Internal Use
12

13

# Sensitivity: LNT Construction Internal Use


14

#
15
Sensitivity: LNT Construction Internal Use
15

16

# Sensitivity: LNT Construction Internal Use


17

#
18
Sensitivity: LNT Construction Internal Use
18

19

# Sensitivity: LNT Construction Internal Use


20

21

22
# Sensitivity: LNT Construction Internal Use
23

24

25
# Sensitivity: LNT Construction Internal Use
26

29

30
# Sensitivity: LNT Construction Internal Use
31

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
T CONSTRUCTION
TER & EFFULENT TREATME

# Sensitivity: LNT Construction Internal Use


o.
# Sensitivity: LNT Construction Internal Use
Tag No.
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
RBANDAR UGD

# Sensitivity: LNT Construction Internal Use


-2

-----

# Sensitivity: LNT Construction Internal Use


-----

-----

# Sensitivity: LNT Construction Internal Use


-----

-----

# Sensitivity: LNT Construction Internal Use


-----

UV A/B

# Sensitivity: LNT Construction Internal Use


AB-01 A

# Sensitivity: LNT Construction Internal Use


AB-01 B
AB-01 B

AB-01 C

# Sensitivity: LNT Construction Internal Use


AB-01 D

# Sensitivity: LNT Construction Internal Use


AB-01 E
AB-01 E

AB-01 F

# Sensitivity: LNT Construction Internal Use


AB-01 G

# Sensitivity: LNT Construction Internal Use


AB-01 H
AB-01 H

AB-01 I

# Sensitivity: LNT Construction Internal Use


AB-01 J

# Sensitivity: LNT Construction Internal Use


AB-01 K
AB-01 K

AB-01 L

# Sensitivity: LNT Construction Internal Use


-----

VDB-01

-----
# Sensitivity: LNT Construction Internal Use
-----

-----

-----
# Sensitivity: LNT Construction Internal Use
-----

-----

-----
# Sensitivity: LNT Construction Internal Use
MESC-02-A/B, CY-01
# Sensitivity: LNT Construction Internal Use
MEGC-05 A, GCL-A, ORP-A

MEGC-05 B, GCL-B, ORP-B

# Sensitivity: LNT Construction Internal Use


MEGC-05 C, GCL-C, ORP-C

RAS-A

# Sensitivity: LNT Construction Internal Use


RAS-B

RAS-C

# Sensitivity: LNT Construction Internal Use


RAS-D

RAS-E

# Sensitivity: LNT Construction Internal Use


RAS-F

SAS-A

# Sensitivity: LNT Construction Internal Use


SAS-B

SAS-C

# Sensitivity: LNT Construction Internal Use


SAS-D

SAS-E

# Sensitivity: LNT Construction Internal Use


SAS-F

EOH-1

# Sensitivity: LNT Construction Internal Use


EOT-1

VDB-02

# Sensitivity: LNT Construction Internal Use


ValveDB-01

# Sensitivity: LNT Construction Internal Use


DWE A

DWE B

# Sensitivity: LNT Construction Internal Use


DWE C

DWFP A

# Sensitivity: LNT Construction Internal Use


DWFP B

DWFP C

# Sensitivity: LNT Construction Internal Use


PDP-A

PDP-B

# Sensitivity: LNT Construction Internal Use


PDP-C

TFP-A

# Sensitivity: LNT Construction Internal Use


TFP-B

TFP-C

# Sensitivity: LNT Construction Internal Use


ST-11-A

ST-11-B

# Sensitivity: LNT Construction Internal Use


----

----

# Sensitivity: LNT Construction Internal Use


PAC/FeCl3DP-A

PAC/FeCl3DP-B

# Sensitivity: LNT Construction Internal Use


AG-401

AG-402

# Sensitivity: LNT Construction Internal Use


FDP-A

FDP-B

# Sensitivity: LNT Construction Internal Use


EOT-2

VDB-03

# Sensitivity: LNT Construction Internal Use


ValveDB-02

# Sensitivity: LNT Construction Internal Use


Supply voltage
Allowable voltage drop
Allowable volatge drop w
Type of insulation

# Sensitivity: LNT Construction Internal Use


Location
# Sensitivity: LNT Construction Internal Use
From

# Sensitivity: LNT Construction Internal Use


Fro

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
STP Transformer - 1

# Sensitivity: LNT Construction Internal Use


STP Transformer - 2

STP DG

# Sensitivity: LNT Construction Internal Use


PMCC-STP

PMCC-STP

# Sensitivity: LNT Construction Internal Use


PMCC-STP

PMCC-STP

# Sensitivity: LNT Construction Internal Use


PMCC-STP

Soft Starter Panel -1

PMCC-STP
# Sensitivity: LNT Construction Internal Use
Soft Starter Panel -2

PMCC-STP

Soft Starter Panel -3


# Sensitivity: LNT Construction Internal Use
PMCC-STP

Soft Starter Panel -4

PMCC-STP
# Sensitivity: LNT Construction Internal Use
Soft Starter Panel -5

PMCC-STP

Soft Starter Panel -6


# Sensitivity: LNT Construction Internal Use
PMCC-STP

Soft Starter Panel -7

PMCC-STP
# Sensitivity: LNT Construction Internal Use
Soft Starter Panel -8

PMCC-STP

Soft Starter Panel -9


# Sensitivity: LNT Construction Internal Use
PMCC-STP

VFD Panel-1

PMCC-STP
# Sensitivity: LNT Construction Internal Use
VFD Panel-2

PMCC-STP

VFD Panel-3
# Sensitivity: LNT Construction Internal Use
PMCC-STP

PMCC-STP

PMCC-STP
# Sensitivity: LNT Construction Internal Use
PMCC-STP

PMCC-STP

PMCC-STP
# Sensitivity: LNT Construction Internal Use
PMCC-STP

PMCC-STP

PMCC-STP
# Sensitivity: LNT Construction Internal Use
PMCC-STP

MCC-I
# Sensitivity: LNT Construction Internal Use
MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-I

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

MCC-II

# Sensitivity: LNT Construction Internal Use


MCC-II

# Sensitivity: LNT Construction Internal Use


rop
rop while starting

# Sensitivity: LNT Construction Internal Use


Location

# Sensitivity: LNT Construction Internal Use


To
# Sensitivity: LNT Construction Internal Use
To
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
PMCC

# Sensitivity: LNT Construction Internal Use


PMCC

PMCC

# Sensitivity: LNT Construction Internal Use


MCC-1

MCC-2

# Sensitivity: LNT Construction Internal Use


APFC

UV System

# Sensitivity: LNT Construction Internal Use


Soft Starter Panel -1

Blower-1

Soft Starter Panel -2


# Sensitivity: LNT Construction Internal Use
Blower-2

Soft Starter Panel -3

Blower-3
# Sensitivity: LNT Construction Internal Use
Soft Starter Panel -4

Blower-4

Soft Starter Panel -5


# Sensitivity: LNT Construction Internal Use
Blower-5

Soft Starter Panel -6

Blower-6
# Sensitivity: LNT Construction Internal Use
Soft Starter Panel -7

Blower-7

Soft Starter Panel -8


# Sensitivity: LNT Construction Internal Use
Blower-8

Soft Starter Panel -9

Blower-9
# Sensitivity: LNT Construction Internal Use
VFD Panel-1

Blower-10

VFD Panel-2
# Sensitivity: LNT Construction Internal Use
Blower-11

VFD Panel-3

Blower-12
# Sensitivity: LNT Construction Internal Use
MLDB

Ventilation DB

BusDuct Space Heater DB


# Sensitivity: LNT Construction Internal Use
Auxiliary DB

Welding receptacles

OLTC Motor-1
# Sensitivity: LNT Construction Internal Use
OLTC Motor-2

Battery charger

Instrumentation
# Sensitivity: LNT Construction Internal Use
Instrumentation

Mechanical Screen LCP


# Sensitivity: LNT Construction Internal Use
Grit Seperator Detritor
LCP-1
Grit Seperator Detritor
LCP-2

# Sensitivity: LNT Construction Internal Use


Grit Seperator Detritor
LCP-3
Return Activated Sludge
pump LCP-1

# Sensitivity: LNT Construction Internal Use


Return Activated Sludge
pump LCP-2
Return Activated Sludge
pump LCP-3

# Sensitivity: LNT Construction Internal Use


Return Activated Sludge
pump LCP-4
Return Activated Sludge
pump LCP-5

# Sensitivity: LNT Construction Internal Use


Return Activated Sludge
pump LCP-6
Surplus Activated Sludge
pump LCP-1

# Sensitivity: LNT Construction Internal Use


Surplus Activated Sludge
pump LCP-2
Surplus Activated Sludge
pump LCP-3

# Sensitivity: LNT Construction Internal Use


Surplus Activated Sludge
pump LCP-4
Surplus Activated Sludge
pump LCP-5

# Sensitivity: LNT Construction Internal Use


Surplus Activated Sludge
pump LCP-6
Electrical Hoist LCP for
Blower Building

# Sensitivity: LNT Construction Internal Use


EOT crane for UV building

Ventilation DB

# Sensitivity: LNT Construction Internal Use


Valve DB

# Sensitivity: LNT Construction Internal Use


Centrifuge

Centrifuge

# Sensitivity: LNT Construction Internal Use


Centrifuge

Centrifuge feed pump

# Sensitivity: LNT Construction Internal Use


Centrifuge feed pump

Centrifuge feed pump

# Sensitivity: LNT Construction Internal Use


Polymer Dosing pump for
Dewatering-1
Polymer Dosing pump for
Dewatering-2

# Sensitivity: LNT Construction Internal Use


Polymer Dosing pump for
Dewatering-3

Thickener Feed Pump-1

# Sensitivity: LNT Construction Internal Use


Thickener Feed Pump-2

Thickener Feed Pump-3

# Sensitivity: LNT Construction Internal Use


Thickener Mechanism-1

Thickener Mechanism-2

# Sensitivity: LNT Construction Internal Use


Submersible mixer for
sludge sump
Submersible mixer for
Thickened sludge sump

# Sensitivity: LNT Construction Internal Use


PAC/ FeCl3 dosing pumps

PAC/ FeCl3 dosing pumps

# Sensitivity: LNT Construction Internal Use


Agitator for PAC/ FeCl3
dosing tanks
Agitator for PAC/ FeCl3
dosing tanks

# Sensitivity: LNT Construction Internal Use


Filtrate water Transfer
Pump-1
Filtrate water Transfer
Pump-2

# Sensitivity: LNT Construction Internal Use


EOT crane for centrifuge
building

Ventilation DB

# Sensitivity: LNT Construction Internal Use


Valve DB

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
415V

BKW/KV
AR/KVA
r/Feeder

# Sensitivity: LNT Construction Internal Use


Type of starter/
Qty

# Sensitivity: LNT Construction Internal Use


Type of
A

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
1 DIRECT 2500

# Sensitivity: LNT Construction Internal Use


1 DIRECT 2500

1 DIRECT 1250

# Sensitivity: LNT Construction Internal Use


1 DIRECT 210

1 DIRECT 120

# Sensitivity: LNT Construction Internal Use


1 DIRECT 710

1 DIRECT 70

# Sensitivity: LNT Construction Internal Use


1 SOFT 122

1 SOFT 122

1 SOFT 122
# Sensitivity: LNT Construction Internal Use
1 SOFT 122

1 SOFT 122

1 SOFT 122
# Sensitivity: LNT Construction Internal Use
1 SOFT 122

1 SOFT 122

1 SOFT 122
# Sensitivity: LNT Construction Internal Use
1 SOFT 122

1 SOFT 122

1 SOFT 122
# Sensitivity: LNT Construction Internal Use
1 SOFT 122

1 SOFT 122

1 SOFT 122
# Sensitivity: LNT Construction Internal Use
1 SOFT 122

1 SOFT 122

1 SOFT 122
# Sensitivity: LNT Construction Internal Use
1 VFD 122

1 VFD 122

1 VFD 122
# Sensitivity: LNT Construction Internal Use
1 VFD 122

1 VFD 122

1 VFD 122
# Sensitivity: LNT Construction Internal Use
1 DIRECT 55

1 DIRECT 55

1 DIRECT
# Sensitivity: LNT Construction Internal Use
1 DIRECT

1 DIRECT

1 DIRECT
# Sensitivity: LNT Construction Internal Use
1 DIRECT

1 DIRECT

1 DIRECT
# Sensitivity: LNT Construction Internal Use
1 DIRECT

1 DIRECT 3.50
# Sensitivity: LNT Construction Internal Use
1 DIRECT 3.32

1 DIRECT 3.32

# Sensitivity: LNT Construction Internal Use


1 DIRECT 3.32

1 ATS 7.84

# Sensitivity: LNT Construction Internal Use


1 ATS 7.84

1 ATS 7.84

# Sensitivity: LNT Construction Internal Use


1 ATS 7.84

1 ATS 7.84

# Sensitivity: LNT Construction Internal Use


1 ATS 7.84

1 ATS 17.51

# Sensitivity: LNT Construction Internal Use


1 ATS 17.51

1 ATS 17.51

# Sensitivity: LNT Construction Internal Use


1 ATS 17.51

1 ATS 17.51

# Sensitivity: LNT Construction Internal Use


1 ATS 17.51

1 DIRECT 3.15

# Sensitivity: LNT Construction Internal Use


1 DIRECT 1.87

1 DIRECT

# Sensitivity: LNT Construction Internal Use


1 DIRECT

# Sensitivity: LNT Construction Internal Use


1 ATS 18.00

1 ATS 18.00

# Sensitivity: LNT Construction Internal Use


1 ATS 18.00

1 DOL 2.29

# Sensitivity: LNT Construction Internal Use


1 DOL 2.29

1 DOL 2.29

# Sensitivity: LNT Construction Internal Use


1 DOL 0.94

1 DOL 0.94

# Sensitivity: LNT Construction Internal Use


1 DOL 0.94

1 DOL 3.84

# Sensitivity: LNT Construction Internal Use


1 DOL 3.84

1 DOL 3.84

# Sensitivity: LNT Construction Internal Use


1 DOL 0.94

1 DOL 0.94

# Sensitivity: LNT Construction Internal Use


1 Direct 0.94

1 Direct

# Sensitivity: LNT Construction Internal Use


1 DOL

1 DOL

# Sensitivity: LNT Construction Internal Use


1 DOL

1 DOL

# Sensitivity: LNT Construction Internal Use


1 ATS 9.34

1 ATS 9.34

# Sensitivity: LNT Construction Internal Use


1 Direct 3.15

1 Direct

# Sensitivity: LNT Construction Internal Use


1 Direct 1.87

# Sensitivity: LNT Construction Internal Use


= 415
= 2%
= 15%
= XLPE

# Sensitivity: LNT Construction Internal Use


415V-Cable selection Cha
power
Rated

factor
Load

# Sensitivity: LNT Construction Internal Use


KW/K
VA/KV -
AR

# Sensitivity: LNT Construction Internal Use


C=
B A/B

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
2500

# Sensitivity: LNT Construction Internal Use


2500

1250

# Sensitivity: LNT Construction Internal Use


210 1.00

120 1.00

# Sensitivity: LNT Construction Internal Use


710 1.00

70 1.00

# Sensitivity: LNT Construction Internal Use


150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
150 0.81

150 0.81

150 0.81
# Sensitivity: LNT Construction Internal Use
55 1.00

55 1.00

###
# Sensitivity: LNT Construction Internal Use
###

###

###
# Sensitivity: LNT Construction Internal Use
###

###

###
# Sensitivity: LNT Construction Internal Use
5.5 0.00

MCC-I

4.1 0.85
# Sensitivity: LNT Construction Internal Use
4.1 0.81

4.1 0.81

# Sensitivity: LNT Construction Internal Use


4.1 0.81

9.3 0.84

# Sensitivity: LNT Construction Internal Use


9.3 0.84

9.3 0.84

# Sensitivity: LNT Construction Internal Use


9.3 0.84

9.3 0.84

# Sensitivity: LNT Construction Internal Use


9.3 0.84

22 0.80

# Sensitivity: LNT Construction Internal Use


22 0.80

22 0.80

# Sensitivity: LNT Construction Internal Use


22 0.80

22 0.80

# Sensitivity: LNT Construction Internal Use


22 0.80

3.7 0.85

# Sensitivity: LNT Construction Internal Use


2.2 0.85

# Sensitivity: LNT Construction Internal Use


MCC-II

# Sensitivity: LNT Construction Internal Use


22 0.82

22 0.82

# Sensitivity: LNT Construction Internal Use


22 0.82

3.7 0.62

# Sensitivity: LNT Construction Internal Use


3.7 0.62

3.7 0.62

# Sensitivity: LNT Construction Internal Use


1.1 0.85

1.1 0.85

# Sensitivity: LNT Construction Internal Use


1.1 0.85

5.5 0.70

# Sensitivity: LNT Construction Internal Use


5.5 0.70

5.5 0.70

# Sensitivity: LNT Construction Internal Use


1.1 0.85

1.1 0.85

# Sensitivity: LNT Construction Internal Use


###

###

# Sensitivity: LNT Construction Internal Use


###

###

# Sensitivity: LNT Construction Internal Use


###

###

# Sensitivity: LNT Construction Internal Use


11 0.85

11 0.85

# Sensitivity: LNT Construction Internal Use


3.7 0.85

###

# Sensitivity: LNT Construction Internal Use


###

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
election Chart for STP

Starting
current

current
Line

# Sensitivity: LNT Construction Internal Use


Amps Amps

# Sensitivity: LNT Construction Internal Use


F=B/
(DXEX1.7
32X0.415
)X100

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
292.2 N/A

166.9 N/A

# Sensitivity: LNT Construction Internal Use


987.8 N/A

97.4 N/A

# Sensitivity: LNT Construction Internal Use


226.7 680.0

226.7 680.0

226.7 680.0
# Sensitivity: LNT Construction Internal Use
226.7 680.0

226.7 680.0

226.7 680.0
# Sensitivity: LNT Construction Internal Use
226.7 680.0

226.7 680.0

226.7 680.0
# Sensitivity: LNT Construction Internal Use
226.7 680.0

226.7 680.0

226.7 680.0
# Sensitivity: LNT Construction Internal Use
226.7 680.0

226.7 680.0

226.7 680.0
# Sensitivity: LNT Construction Internal Use
226.7 680.0

226.7 680.0

226.7 680.0
# Sensitivity: LNT Construction Internal Use
241.3 361.9

241.3 361.9

241.3 361.9
# Sensitivity: LNT Construction Internal Use
241.3 361.9

241.3 361.9

241.3 361.9
# Sensitivity: LNT Construction Internal Use
#REF! N/A

#REF! N/A

#REF! N/A
# Sensitivity: LNT Construction Internal Use
#REF! N/A

#REF! N/A

#REF! N/A
# Sensitivity: LNT Construction Internal Use
#REF! N/A

#REF! N/A

#REF! N/A
# Sensitivity: LNT Construction Internal Use
#REF! N/A

MCC-I

5.7 N/A
# Sensitivity: LNT Construction Internal Use
5.7 N/A

5.7 N/A

# Sensitivity: LNT Construction Internal Use


5.7 N/A

14.1 49.5

# Sensitivity: LNT Construction Internal Use


14.1 49.5

14.1 49.5

# Sensitivity: LNT Construction Internal Use


14.1 49.5

14.1 49.5

# Sensitivity: LNT Construction Internal Use


14.1 49.5

35.2 123.2

# Sensitivity: LNT Construction Internal Use


35.2 123.2

35.2 123.2

# Sensitivity: LNT Construction Internal Use


35.2 123.2

35.2 123.2

# Sensitivity: LNT Construction Internal Use


35.2 123.2

5.1 N/A

# Sensitivity: LNT Construction Internal Use


3.1 N/A

0.0

# Sensitivity: LNT Construction Internal Use


0.0

MCC-II

# Sensitivity: LNT Construction Internal Use


35.2 123.2

35.2 123.2

# Sensitivity: LNT Construction Internal Use


35.2 123.2

5.7 34.1

# Sensitivity: LNT Construction Internal Use


5.7 34.1

5.7 34.1

# Sensitivity: LNT Construction Internal Use


1.6 9.7

1.6 9.7

# Sensitivity: LNT Construction Internal Use


1.6 9.7

7.9 47.6

# Sensitivity: LNT Construction Internal Use


7.9 47.6

7.9 47.6

# Sensitivity: LNT Construction Internal Use


1.6 9.7

1.6 9.7

# Sensitivity: LNT Construction Internal Use


0.0 N/A

0.0 N/A

# Sensitivity: LNT Construction Internal Use


#N/A #N/A

#N/A #N/A

# Sensitivity: LNT Construction Internal Use


#N/A #N/A

#N/A #N/A

# Sensitivity: LNT Construction Internal Use


17.2 60.3

17.2 60.3

# Sensitivity: LNT Construction Internal Use


5.1 N/A

0.0 N/A

# Sensitivity: LNT Construction Internal Use


0.0 N/A

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
r STP

carrying
capacity
selected

current
Cable

Cable
# Sensitivity: LNT Construction Internal Use
Sqmm Amps

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
3.5C x 240 Al 326

3.5C x 240 Al 326

# Sensitivity: LNT Construction Internal Use


3.5C x 185 Al 282

3.5C x 120 Al 223

# Sensitivity: LNT Construction Internal Use


3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 185 Al 282

3.5C x 185 Al 282

3.5C x 185 Al 282


# Sensitivity: LNT Construction Internal Use
3.5C x 35 Al 113

4C x 16 Al 73

4C x 16 Al 73
# Sensitivity: LNT Construction Internal Use
4C x 16 Al 73

4C x 16 Al 73

3C x 2.5 Al #N/A
# Sensitivity: LNT Construction Internal Use
3C x 2.5 Al #N/A

4C x 16 Al 73

4C x 16 Al 73
# Sensitivity: LNT Construction Internal Use
4C x 16 Al 73

4C x 16 Al 73
# Sensitivity: LNT Construction Internal Use
4C x 16 Al 73

4C x 16 Al 73

# Sensitivity: LNT Construction Internal Use


4C x 16 Al 73

4C x 16 Al 73

# Sensitivity: LNT Construction Internal Use


4C x 16 Al 73

4C x 16 Al 73

# Sensitivity: LNT Construction Internal Use


4C x 16 Al 73

4C x 16 Al 73

# Sensitivity: LNT Construction Internal Use


3.5C x 25 Al 94

4C x 16 Al 73

# Sensitivity: LNT Construction Internal Use


4C x 16 Al 73

3.5C x 35 Al 113

# Sensitivity: LNT Construction Internal Use


3.5C x 35 Al 113

3.5C x 35 Al 113

# Sensitivity: LNT Construction Internal Use


3.5C x 50 Al 133

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


3C × 25 Al 95

3C × 25 Al 95

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 16 Al 73

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


4C x 10 Al 57

# Sensitivity: LNT Construction Internal Use


Project
Title
L&T Doc No.
Rev.
Date

# Sensitivity: LNT Construction Internal Use


#
Sensitivity: LNT Construction Internal Use
No of
runs

Derating
factor
Cable
current
carring
capacity
after
Nos Amps

# Sensitivity: LNT Construction Internal Use


-

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
Bus D

# Sensitivity: LNT Construction Internal Use


Bus D

Bus D

# Sensitivity: LNT Construction Internal Use


2 0.71 462.9

1 0.71 231.5

# Sensitivity: LNT Construction Internal Use


5 0.71 1001.1

1 0.71 158.3

# Sensitivity: LNT Construction Internal Use


2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
2 0.71 400.4

2 0.71 400.4

2 0.71 400.4
# Sensitivity: LNT Construction Internal Use
1 0.71 80.2

1 0.71 51.8

1 0.71 51.8
# Sensitivity: LNT Construction Internal Use
1 0.71 51.8

1 0.71 51.8

1 0.71 #N/A
# Sensitivity: LNT Construction Internal Use
1 0.71 #N/A

1 0.71 51.8

1 0.71 51.8
# Sensitivity: LNT Construction Internal Use
1 0.71 51.8

1 0.71 51.8
# Sensitivity: LNT Construction Internal Use
1 0.71 51.8

1 0.71 51.8

# Sensitivity: LNT Construction Internal Use


1 0.71 51.8

1 0.71 51.8

# Sensitivity: LNT Construction Internal Use


1 0.71 51.8

1 0.71 51.8

# Sensitivity: LNT Construction Internal Use


1 0.71 51.8

1 0.71 51.8

# Sensitivity: LNT Construction Internal Use


1 0.71 66.7

1 0.71 51.8

# Sensitivity: LNT Construction Internal Use


1 0.71 51.8

1 0.71 80.2

# Sensitivity: LNT Construction Internal Use


1 0.71 80.2

1 0.71 80.2

# Sensitivity: LNT Construction Internal Use


1 0.71 94.4

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
1 0.71 67.5

1 0.71 67.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 51.8

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


1 0.71 40.5

# Sensitivity: LNT Construction Internal Use


SEWERAGE SCHEME IN VA
LT Cable Design Calculati
LE090490_ E_WW_SW_DC
A
22.03.2016

# Sensitivity: LNT Construction Internal Use


#
Length

Sensitivity: LNT Construction Internal Use


of the
cable
Total
Length
of the
cable
Resisita
nce
ohm/k
Mtrs Mtrs
m

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
us Duct

# Sensitivity: LNT Construction Internal Use


us Duct

us Duct

# Sensitivity: LNT Construction Internal Use


120 240 0.160

120 120 0.160

# Sensitivity: LNT Construction Internal Use


23 115 0.210

70 70 0.324

# Sensitivity: LNT Construction Internal Use


113 226 0.210

57 114 0.210

112 224 0.210


# Sensitivity: LNT Construction Internal Use
55 110 0.210

110 220 0.210

53 106 0.210
# Sensitivity: LNT Construction Internal Use
109 218 0.210

48 96 0.210

110 220 0.210


# Sensitivity: LNT Construction Internal Use
48 96 0.210

112 224 0.210

43 86 0.210
# Sensitivity: LNT Construction Internal Use
113 226 0.210

36 72 0.210

115 230 0.210


# Sensitivity: LNT Construction Internal Use
31 62 0.210

116 232 0.210

27 54 0.210
# Sensitivity: LNT Construction Internal Use
118 236 0.210

47 94 0.210

119 238 0.210


# Sensitivity: LNT Construction Internal Use
33 66 0.210

121 242 0.210

20 40 0.210
# Sensitivity: LNT Construction Internal Use
30 30 1.110

30 30 2.440

30 30 2.440
# Sensitivity: LNT Construction Internal Use
30 30 2.440

30 30 2.440

70 70 #N/A
# Sensitivity: LNT Construction Internal Use
70 70 #N/A

40 40 2.440

40 40 2.440
# Sensitivity: LNT Construction Internal Use
50 50 2.440

210 210 2.440


# Sensitivity: LNT Construction Internal Use
195 195 2.440

195 195 2.440

# Sensitivity: LNT Construction Internal Use


195 195 2.440

50 50 2.440

# Sensitivity: LNT Construction Internal Use


50 50 2.440

110 110 2.440

# Sensitivity: LNT Construction Internal Use


110 110 2.440

120 120 2.440

# Sensitivity: LNT Construction Internal Use


160 160 1.540

50 50 2.440

# Sensitivity: LNT Construction Internal Use


50 50 2.440

110 110 1.110

# Sensitivity: LNT Construction Internal Use


110 110 1.110

120 120 1.110

# Sensitivity: LNT Construction Internal Use


160 160 0.820

120 120 3.940

# Sensitivity: LNT Construction Internal Use


40 40 3.940

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
35 35 1.540

35 35 1.540

# Sensitivity: LNT Construction Internal Use


35 35 3.940

25 25 3.940

# Sensitivity: LNT Construction Internal Use


25 25 3.940

25 25 3.940

# Sensitivity: LNT Construction Internal Use


0 3.940

0 3.940

# Sensitivity: LNT Construction Internal Use


0 3.940

30 30 3.940

# Sensitivity: LNT Construction Internal Use


30 30 3.940

30 30 3.940

# Sensitivity: LNT Construction Internal Use


105 105 2.440

105 105 3.940

# Sensitivity: LNT Construction Internal Use


0 3.940

0 3.940

# Sensitivity: LNT Construction Internal Use


0 3.940

0 3.940

# Sensitivity: LNT Construction Internal Use


0 3.940

0 3.940

# Sensitivity: LNT Construction Internal Use


37 37 3.940

37 37 3.940

# Sensitivity: LNT Construction Internal Use


40 40 3.940

20 20 3.940

# Sensitivity: LNT Construction Internal Use


0 3.940

# Sensitivity: LNT Construction Internal Use


E IN VARANASI CITY, VARAN
culation for STP
W_DC_4007

# Sensitivity: LNT Construction Internal Use


Reactan
Impeda

starting
nce of

cable
the
ce

# Sensitivity: LNT Construction Internal Use


ohm/ ohm/
km km

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
0.071 0.06

0.071 0.12

# Sensitivity: LNT Construction Internal Use


0.072 0.03

0.071 0.17

# Sensitivity: LNT Construction Internal Use


0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.072 0.07

0.072 0.07

0.072 0.07
# Sensitivity: LNT Construction Internal Use
0.078 0.41

0.081 0.81

0.081 0.81
# Sensitivity: LNT Construction Internal Use
0.081 0.81

0.081 0.81

#N/A #N/A
# Sensitivity: LNT Construction Internal Use
#N/A #N/A

0.081 0.81

0.081 0.81
# Sensitivity: LNT Construction Internal Use
0.081 0.81

0.081 0.81
# Sensitivity: LNT Construction Internal Use
0.081 0.81

0.081 0.81

# Sensitivity: LNT Construction Internal Use


0.081 0.81

0.081 0.81

# Sensitivity: LNT Construction Internal Use


0.081 0.81

0.081 0.81

# Sensitivity: LNT Construction Internal Use


0.081 0.81

0.081 0.81

# Sensitivity: LNT Construction Internal Use


0.081 0.54

0.081 0.81

# Sensitivity: LNT Construction Internal Use


0.081 0.81

0.078 0.41

# Sensitivity: LNT Construction Internal Use


0.078 0.41

0.078 0.41

# Sensitivity: LNT Construction Internal Use


0.075 0.32

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

###

# Sensitivity: LNT Construction Internal Use


###

# Sensitivity: LNT Construction Internal Use


0.081 0.54

0.081 0.54

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.081 0.81

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

0.084 1.26

# Sensitivity: LNT Construction Internal Use


0.084 1.26

# Sensitivity: LNT Construction Internal Use


I CITY, VARANASI
TP

# Sensitivity: LNT Construction Internal Use


#
Impeda

Sensitivity: LNT Construction Internal Use


nce of
the
cable
Running

ning Volatge drop


ohm/km V

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
0.09 1.25%

0.17 1.43%

# Sensitivity: LNT Construction Internal Use


0.04 0.40%

0.30 0.86%

# Sensitivity: LNT Construction Internal Use


0.11 1.17%

0.11 0.59%

0.11 1.16%
# Sensitivity: LNT Construction Internal Use
0.11 0.57%

0.11 1.13%

0.11 0.55%
# Sensitivity: LNT Construction Internal Use
0.11 1.12%

0.11 0.50%

0.11 1.13%
# Sensitivity: LNT Construction Internal Use
0.11 0.50%

0.11 1.16%

0.11 0.44%
# Sensitivity: LNT Construction Internal Use
0.11 1.17%

0.11 0.37%

0.11 1.19%
# Sensitivity: LNT Construction Internal Use
0.11 0.32%

0.11 1.20%

0.11 0.28%
# Sensitivity: LNT Construction Internal Use
0.11 1.30%

0.11 0.52%

0.11 1.31%
# Sensitivity: LNT Construction Internal Use
0.11 0.36%

0.11 1.33%

0.11 0.22%
# Sensitivity: LNT Construction Internal Use
0.93 #REF!

2.00 #REF!

2.00 #REF!
# Sensitivity: LNT Construction Internal Use
2.00 #REF!

2.00 #REF!

#N/A #N/A
# Sensitivity: LNT Construction Internal Use
#N/A #N/A

2.00 #REF!

2.00 #REF!
# Sensitivity: LNT Construction Internal Use
2.00 #REF!

2.00 1.00%
# Sensitivity: LNT Construction Internal Use
2.00 0.93%

2.00 0.93%

# Sensitivity: LNT Construction Internal Use


2.00 0.93%

2.02 0.60%

# Sensitivity: LNT Construction Internal Use


2.02 0.60%

2.02 1.31%

# Sensitivity: LNT Construction Internal Use


2.02 1.31%

2.02 1.43%

# Sensitivity: LNT Construction Internal Use


1.29 1.22%

2.00 1.47%

# Sensitivity: LNT Construction Internal Use


2.00 1.47%

0.93 1.51%

# Sensitivity: LNT Construction Internal Use


0.93 1.51%

0.93 1.65%

# Sensitivity: LNT Construction Internal Use


0.70 1.65%

3.20 0.83%

# Sensitivity: LNT Construction Internal Use


3.20 0.16%

#DIV/0!

# Sensitivity: LNT Construction Internal Use


#DIV/0!

# Sensitivity: LNT Construction Internal Use


1.28 0.66%

1.28 0.66%

# Sensitivity: LNT Construction Internal Use


3.20 1.65%

3.09 0.18%

# Sensitivity: LNT Construction Internal Use


3.09 0.18%

3.09 0.18%

# Sensitivity: LNT Construction Internal Use


2.89 0.00%

2.89 0.00%

# Sensitivity: LNT Construction Internal Use


2.89 0.00%

3.28 0.33%

# Sensitivity: LNT Construction Internal Use


3.28 0.33%

3.28 0.33%

# Sensitivity: LNT Construction Internal Use


1.81 0.13%

2.89 0.20%

# Sensitivity: LNT Construction Internal Use


3.20 0.00%

3.20 0.00%

# Sensitivity: LNT Construction Internal Use


#N/A #N/A

#N/A #N/A

# Sensitivity: LNT Construction Internal Use


#N/A #N/A

#N/A #N/A

# Sensitivity: LNT Construction Internal Use


3.16 0.84%

3.16 0.84%

# Sensitivity: LNT Construction Internal Use


3.20 0.28%

3.20 0.00%

# Sensitivity: LNT Construction Internal Use


3.20 0.00%

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
Starting
voltage

Result
drop

# Sensitivity: LNT Construction Internal Use


V

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
# Sensitivity: LNT Construction Internal Use
N/A YES

N/A YES

# Sensitivity: LNT Construction Internal Use


N/A YES

N/A YES

# Sensitivity: LNT Construction Internal Use


2.11% YES

1.06% YES

2.09% YES
# Sensitivity: LNT Construction Internal Use
1.03% YES

2.05% YES

0.99% YES
# Sensitivity: LNT Construction Internal Use
2.03% YES

0.90% YES

2.05% YES
# Sensitivity: LNT Construction Internal Use
0.90% YES

2.09% YES

0.80% YES
# Sensitivity: LNT Construction Internal Use
2.11% YES

0.67% YES

2.15% YES
# Sensitivity: LNT Construction Internal Use
0.58% YES

2.16% YES

0.50% YES
# Sensitivity: LNT Construction Internal Use
1.17% YES

0.47% YES

1.18% YES
# Sensitivity: LNT Construction Internal Use
0.33% YES

1.20% YES

0.20% YES
# Sensitivity: LNT Construction Internal Use
N/A #REF!

N/A #REF!

N/A #REF!
# Sensitivity: LNT Construction Internal Use
N/A #REF!

N/A #REF!

N/A #REF!
# Sensitivity: LNT Construction Internal Use
N/A #REF!

N/A #REF!

N/A #REF!
# Sensitivity: LNT Construction Internal Use
N/A #REF!

N/A YES
# Sensitivity: LNT Construction Internal Use
N/A YES

N/A YES

# Sensitivity: LNT Construction Internal Use


N/A YES

0.84% YES

# Sensitivity: LNT Construction Internal Use


0.84% YES

1.84% YES

# Sensitivity: LNT Construction Internal Use


1.84% YES

2.00% YES

# Sensitivity: LNT Construction Internal Use


1.78% YES

2.08% YES

# Sensitivity: LNT Construction Internal Use


2.08% YES

2.31% YES

# Sensitivity: LNT Construction Internal Use


2.31% YES

2.52% YES

# Sensitivity: LNT Construction Internal Use


2.61% YES

N/A YES

# Sensitivity: LNT Construction Internal Use


N/A YES

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
0.97% YES

0.97% YES

# Sensitivity: LNT Construction Internal Use


2.27% YES

0.45% YES

# Sensitivity: LNT Construction Internal Use


0.45% YES

0.45% YES

# Sensitivity: LNT Construction Internal Use


0.00% YES

0.00% YES

# Sensitivity: LNT Construction Internal Use


0.00% YES

0.75% YES

# Sensitivity: LNT Construction Internal Use


0.75% YES

0.75% YES

# Sensitivity: LNT Construction Internal Use


0.34% YES

0.54% YES

# Sensitivity: LNT Construction Internal Use


N/A YES

N/A YES

# Sensitivity: LNT Construction Internal Use


#N/A #N/A

#N/A #N/A

# Sensitivity: LNT Construction Internal Use


#N/A #N/A

#N/A #N/A

# Sensitivity: LNT Construction Internal Use


1.18% YES

1.18% YES

# Sensitivity: LNT Construction Internal Use


N/A YES

N/A YES

# Sensitivity: LNT Construction Internal Use


N/A YES

# Sensitivity: LNT Construction Internal Use


roperty of L&T Construction and must not be passed on to any third person or firm not authorised by us, nor be copied/made use of in full or part by such person or firm without our prior permission writing

17.10.2017 A For Approval AVRA


DATE REV. NO. DESCRIPTION Prepared
REVISIONS

….
L&T Construction
A Water & Effluent Treatment IC-Wastewater BU
nd
CLIENT : PMC :

S RAJASTHAN URBAN DRINKING WATER


an SEWERAGE AND INFRA-STRUCTURE Shah Technical Consult
ita CORPORATION LTD.
PROJECT :
tio
n
A
ut
ho
# ritLNT Construction Internal Use
Sensitivity:
This document is the property of L&T Construction and must n Providing, laying, jointing, testing and commissioning of sewer system and all ancillary works along with Design,
installation, testing and commissioning (Civil, Mechanical, electrical & other necessary works) of SPS (if any) &
Process inclusive of provision for treated waste water reuse including 1 year defect liability and thereafter 10 y
under package a) Sikar Town = sewer system with two STPs , b) Bhiwadi Town = sewer system with five STPs an
Town = sewer system
SUPPLIER / CONTRACTOR: L&T Construction
Water and Effluent Treatment IC -Wastewater BU
Job No LE160360
TITLE :
NAME SIGN DATE
PRPD AVRA 17.10.2017

CHKD SK 17.10.2017
CABLE SIZING CALCULATIONS STP CUM MPS (1.5 ML
APPD RVS 17.10.2017

DOC.No. LE 1 6 0 3 6 0 - E - W W - S W - D C - 4 3 0

RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL

# Sensitivity: LNT Construction Internal Use


AVRA SK RVS
Prepared Checked Approved

nical Consultant

# Sensitivity: LNT Construction Internal Use


ng with Design, construction, supply,
f SPS (if any) & STP based on SBR
d thereafter 10 years O&M for towns
with five STPs and Septage ,c) Alwar

er BU

MPS (1.5 MLD BHIWADI)

SIZE REV.
6
A4 A

CONSTRUCTION

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALC
L&T Doc No LE160360-E-WW-S
L&T Construction Revision A
Water & Effluent Treatment IC-Wastewater BU Date 06.11.2017

INDEX

Sl No TITLE

1 Cover Sheet

2 Index Sheet

3 Design basics

4 Formula used for 415V system

5 11kV HT Cable sizing

Typical 11kV HT power cable sizing for two pole structure


6
incomer feeder

7 Typical Highest kW Motor cable sizing calculation sheet

8 415V-Cable selection Chart for STP for Sikar 2 MLD STP

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)
LE160360-E-WW-SW-DC-4306
A
06.11.2017

INDEX

No of pages:

1 of 11

2 of 11

3 of 11

4 of 11

5 of 11

6 of 11

7, 8 of 11

9,10,11 of 11

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
Project
Title
L&T Doc No
LARSEN & TOUBRO LIMITED Revision
WATER, SMART WORLD & COMMUNICATION IC Date
PREPARED BY
THG/BSC

1.1kV AL, ARM, XLPE, POWER CABLE SIZING FOR STP 120MLD V

Input Data
1 Connected load in kVA =
2 Proposed cable size (Sq.mm) =
3 No. of Runs of cable (N) =
4 Voltage Rating of (V) =
5 Cable Derating Factor =
6 Allowable running voltage drop (%) =
7 Running power factor (Cos ØR ) =
8 Reactive running power factor (Sin ØR ) =

9 R - Resistance of cable selected at 90 deg.C in Ω / km =


10 X - Reactance of cable selected at 50Hz Ω / km =
11 Current rating of cable selected in Amp.(In air) =
12 Maximum Length of Cable (km) =

Calculated Datas

A Condition 1 : Checking of Current Carrying Capacity of Cable


1 Full Load current ( IFLC ) =

# Sensitivity: LNT Construction Internal Use


2 Cable Derated Current ( ICDC ) =

=
=

P From the above calculation Cable derated current (ICDC) is greater than Full Load Curren
B Condition 2 : Checking for Allowable Voltage Drop during Running Condition

1 Impedance of the Cable when laid in parallel =

=
=

2 Voltage Drop in Volts =

3 % Voltage Drop during running =

=
P As per the above calculation, the maximum steady state voltage drop is less than the pe
the condition- 2 is satisfied. Condition-2 Satisfies since '% Voltage Drop during startin
than 15% & 3% respectively.
Conclusion :
From above calculation results the selected cable of 2R x 3.5C x 400Sqmm satisfies a
Hence the selected cable size is suitable to with stand the Total LPS-2 MCC load at Po

# Sensitivity: LNT Construction Internal Use


SEWERAGE SCHEME IN VARANASI CITY, UTTAR PRADESH
LT Cable Design Calculation for STP
LE090490-E-WW-SW-DC-4007
A
24.03.16
PREPARED BY CHECKED BY APPROVD BY
THG/BSC GRP RVS

ING FOR STP 120MLD VARANASI PROJECT

400.0
3.5C X 400Al
2
415
Err:509
3%
0.8
0.60

0.100000
0.070400
0
0.04 (Approx)

Total Connected Load (KVA)


√3 x Voltage Rating(kV)
400.0
√3 x 0.415
556.50 Amp

# Sensitivity: LNT Construction Internal Use


No. of runs of cable X cable derating factor X Current
carrying capacity of selected cable

2 X 0.71 X418
Err:509 Amp
er than Full Load Current (IFLC). Hence condition-1 is satisfied.

Running Condition
R CosØs + X SinØs
No. of Runs of cable
(0.100 x 0.80) + (0.0704 x 0.6)
2
0.061120 Ohm
√3 X Maximum Length of Cable X IFLC X Impedance of the
cable

√3 X 0.04 X 556 X 0.127080

2.36 V
Voltage Drop in Volts
Voltage Rating
2.36 X 100
415
0.5678%
e drop is less than the permitted 3% of normal voltage (415V). Hence
tage Drop during starting & '% Voltage Drop during running is less

x 400Sqmm satisfies all the 2 conditions stated above.


l LPS-2 MCC load at Porbandar UGD.

# Sensitivity: LNT Construction Internal Use


Title
L&T Doc No
L&T Construction Revision

Water & Effluent Treatment IC-Wastewater BU Date


DESIGN BASICS
A. SCOPE :

Power cables are using for the entire requirement of Sewage Treatment Plant and selected
is prepared for sizing the 11kV HT cable which is to be terminated from HT metering panel
terminated between transformers to Power cum motor control center and Power cum mot
project. The Power cables from Local Control panel (LCP) to the Submersible pumpsets sh
furnished pumpset vendor drawings.

B. REFERENCES
1 IS 1554 for PVC cables
2 Contract document technical specification for cables
3 Polycab catalogue

C. TYPE OF CABLE :
1 LV Power cables considered are of 1.1kV grade, 90 Deg.C rating during normal operating co
sheathed, stranded aluminium conductored and armoured,.

D. DESIGN CRITERIA

1 The cross sectional area of cable shall be selected based on following condition.

i The allowable voltage drop during starting & running conditions of the equipments

ii To be able to carry full load current after considering derating factor for ambient temparat

E. CONDITIONS FOR SELECTING THE CABLE SIZE:


1 Condition 1 : Checking of Current Carrying Capacity of Cable
Cable Derated Current ( ICDC ) > Full Load Current ( IFLC )

2 Condition 2 : Checking for Allowable Voltage Drop during Running & Starting Condit
Actual Length of cable between two terminals shall be always less than Allowable Maximum

# Sensitivity: LNT Construction Internal Use


Conditition & Running Condition (starting Condition Applicable only for Motor).
a) Allowable Voltage Drop During Starting = 15%
b) Allowable Voltage Drop During Running = 2.5%
The selected Cable Size should be suitable for both the conditions stated above.

# Sensitivity: LNT Construction Internal Use


CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

LE160360-E-WW-SW-DC-4306
A

06.11.2017
SICS

t and selected are as per the tender technical specification.This document


metering panel to proposed 2 pole structure, 415V LT cable which is to be
ower cum motor control center to all equipments for 1.5 MLD STP Bhiwadi
e pumpsets shall be provided by Sub. Pumpsets vendor cable sizes shall be

al operating condition, PVC insulated, extruded inner and outer PVC

pments

bient temparature variation, method of laying.

arting Condition
wable Maximum Length of cable during Starting

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
Title CABLE SIZING CALCULATIONS S
L&T Doc No LE160360-E-WW-SW-DC-430
L&T Construction Revision A
Water & Effluent Treatment IC-Wastewater BU Date 06.11.2017
Formula used
a) Current rating required (Ir) for motors/other loads = Rated kW
1.732 x Vr x pf x eff
b) Current rating required (Ir) for Incomers = Rated kVA
1.732 x Vr
c) Current rating required (Ir) for capacitors = Rated kVAr
1.732 x Vr
d) Cable selection
1 Cable current carrying capacity = Ic
2 Derating factor = Dr
3 No of runs = N
4 Cable current carrying capacity after derating = Ic x Dr x N >
5 Starting current Ist = K x Ir
6 Cable reactance = X
7 Cable resistance = R
8 Cable length = L
9 Cable impedance -> Z = ( R cos Ө + X sin Ө)
N
Ө = Power factor
10 % Voltage drop = 1.732 x Ir x Z x(L/1000) x 100
Vr
11 % Starting Voltage drop = 1.732 x Ist x Z x (L/1000) x100
Vr
Where Ist = Starting current & Ir = Rated current
e) k for Starting current:
12 DOL = 6
13 Soft = 3
14 VFD = 1.5
15 Star-Delta = 4.5
f) LT cables : Derating factor- Dr
Trafo/DG to PMCC Cables in Buried :
16 Factor due to ground temperature ( 35 deg C) = 0.96
17 Factor due to depth of laying ( 900 mm depth) = 0.98
18 Factor due to variation in thermal resistivity = 1

# Sensitivity: LNT Construction Internal Use


19 Factor due to cable grouping = 0.69
20 Derating factor- Dr = 0.65 (Multiplication of
PMCC to Individual equipments & cables laid in buried
21 Factor due to ground temperature ( 35 deg C) = 0.96
22 Factor due to depth of laying ( 900 mm depth) = 0.98
23 Factor due to variation in thermal resistivity = 1
24 Factor due to cable grouping = 0.54
25 Derating factor- Dr = 0.51 (Multiplication of
Cables laid in cable trays exposed to air in Air:
26 Factor due to Air temperature ( 40 deg C) = 0.91
27 Factor due to Cable grouping = 0.75
28 Derating factor- Dr = 0.68 (Multiplication of
g) HT cables Derating factor- Dr
16 Factor due to ground temperature ( 35 deg C) = 0.96
17 Factor due to depth of laying (1030 mm depth) = 0.99
18 Factor due to variation in thermal resistivity = 1
19 Factor due to cable grouping = 0.79
20 Derating factor- Dr = 0.75 (Multiplication of

# Sensitivity: LNT Construction Internal Use


CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)
LE160360-E-WW-SW-DC-4306
A
06.11.2017
Formula used
Vr = Rated voltage A
Pf= Power factor of motor
eff= Efficiency of motor A

Ir A
A
ohm/km
ohm/km
Mtrs
ohm/km

1.732 x Ir x Z x(L/1000) x 100 <2.5%


Vr
1.732 x Ist x Z x (L/1000) x100 <15%
Vr

# Sensitivity: LNT Construction Internal Use


(Multiplication of all factors)

(Multiplication of all factors)

(Multiplication of all factors)

(Multiplication of all factors)

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATION

L&T Doc No 0
L&T Construction Revision A
Water & Effluent Treatment IC-Wastewater BU Date 06.11.2017

11kV HT Cable sizing

1 Short circuit current in kA = 15.75

2 t- Duration of short circuit current in Sec. = 1

3 K-factor value for Aluminium XLPE Cables =


0.094
(as per IS 3043,Page No:-31)
4 Minimum Area of cross section required A = Short circuit current x (t)^1/2
k

= 15.75 x (1.0)^1/2
0.094
= 167.55

5 Selected Cable size = 3C x 185 --- 50 Mtrs 11 KV earthed cable.

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
NG CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

KA

Second

sqmm

sqmm

sqmm

thed cable. sqmm

# Sensitivity: LNT Construction Internal Use


# Sensitivity: LNT Construction Internal Use
L&T Construction
Water & Effluent Treatment IC-Wastewater BU

TYPICAL 11kV HT POWER CABLE SIZING FROM

Input Data

1 Rating of transformer (KVA)

2 Proposed cable size (Sq.mm)

3 No. of Runs of cable (N)

4 Voltage Rating of HT System (V)

5 Cable Derating Factor

6 Allowable running voltage drop (%)

7 Running power factor (Cos ØR )

8 Reactive running power factor (Sin ØR )

9 R - Resistance of cable selected at 90 deg.C in Ω / km

10 X - Reactance of cable selected at 50Hz Ω / km

11 Current rating of cable selected in Ground.

12 Maximum Length of Cable (in km)

Calculated Datas

A Condition 1 : Checking of Current Carrying Capacity of Cable

1 Full Load current ( IFLC )

# Sensitivity: LNT Construction Internal Use


2 Cable Derated Current ( ICDC )

Condition-1 Satisfies since ICDC > IFLC

B. Condition 2 : Checking for Allowable Voltage Drop during Running

3 Impedance of the Cable when laid in parallel (Running)

4 Voltage Drop in Volts during running

5 % Voltage Drop during running

Condition-2 Satisfies since '% Voltage Drop during running condition is less

Conclusion :
As per the above calculation sheet the selected cable of 3C x 185 Sqmm satisf

# Sensitivity: LNT Construction Internal Use


Hence the selected cable is suitable for 11kV system

This calculation represents typical sizing calculation and the cable length con

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD B
L&T Doc No #VALUE!
Revision A
Date 06.11.2017

CABLE SIZING FROM 11kV METERING PANEL TO 2 POLE STRUCTURE

= 200.0

= 3C × 185 Al

=1

= 11000

= 0.75000

= 2.5%

= 0.98

= 0.20

= 0.210000 (From polycab catalogue )

= 0.087000 (From polycab catalogue )

= 275 (From polycab catalogue )

= 0.05 (Approx)

ity of Cable
Selected transformer Rating in kVA
=
√3 x Voltage Rating(kV)
200.0
=
# Sensitivity: LNT Construction Internal Use
=
√3 x 11
= 10.50 Amps

= No. of runs of cable x Cable derating factor x Current carrying capacity of se

= 1 x 0.75 x 275
= 206.25 Amps

p during Running Condition

R Cos ØR + X Sin ØR
=
No. of Runs of cable
= 0.21 x 0.98 + 0.087 x 0.2
1
= 0.223 Ohm
= √3 x Maximum Length of Cable x IFLC x Impedance of the cable

= √3 x 0.05 x 10.5 x 0.22

= 0.20 V
Voltage Drop in Volts during running X 100
=
Voltage Rating
0.20
= X 100
11000
= 0.0018%
g condition is less than 2.5% respectively.

x 185 Sqmm satisfies all the 2 conditions stated above.

# Sensitivity: LNT Construction Internal Use


e cable length considered is approximate only. It may slightly vary w.r.t. site conditions

# Sensitivity: LNT Construction Internal Use


STP CUM MPS (1.5 MLD BHIWADI)

# Sensitivity: LNT Construction Internal Use


arrying capacity of selected cable

e cable

# Sensitivity: LNT Construction Internal Use


w.r.t. site conditions

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306


L&T Construction Revision A
Water & Effluent Treatment IC-Wastewater BU Date 06.11.2017
TYPICAL 415V LT POWER CABLE SIZING FOR HIGHER KW RATING 30 KW LT MOTOR - 1.1kV, Al, Ar XLPE CABLES

Input Data

1 Rating of Motor (KW) = 30.0

2 Proposed cable size (Sq.mm) = 3C × 50 Al

3 No. of Runs of cable (N) =1


4 Voltage Rating of Motor (V) = 415

5 Cable Derating Factor = 0.68000

6 Allowable running voltage drop (%) = 2.5%

7 Allowable starting voltage drop (%) = 15%


8 Starting power factor (cos Øs ) = 0.3

9 Starting reactive pf (sin Øs ) = 0.95

10 Running power factor (Cos ØR ) = 0.81


11 Reactive running power factor (Sin ØR ) = 0.59

12 Motor Efficiency = 0.934


R - Resistance of cable selected at 90 deg.C in Ω /
13 km = 0.820000 (From polycab catalogue )

14 X - Reactance of cable selected at 50Hz Ω / km = 0.075000 (From polycab catalogue )


15 Current rating of cable selected in Ground. = 134 (From polycab catalogue )

16 Maximum Length of Cable (in km) = 0.05 (Approx)

Calculated Datas

A Condition 1 : Checking of Current Carrying Capacity of Cable


Full Load current for Motor ( IFLC ) Selected Motor Rating in kW
1 =
√3 x Power Factor x Efficiency x Voltage Rating(kV)
30.0
=
√3 x 0.87 X 0.917x 0.415
= 55.17 Amps

2 Cable Derated Current ( ICDC ) = No. of runs of cable x Cable derating factor x Current carrying capacity of selected cable

= 1 x 0.68 x 134
= 91.12 Amps
Condition-1 Satisfies since ICDC > IFLC

B. Condition 2 : Checking for Allowable Voltage Drop during Running & Starting Condition
1 Starting current for Motor ( ISTG ) = 3.0 times of FLC (Soft Starter)

= 165.51
= 165.51 Amps
Impedance of the Cable when laid in parallel R CosØs + X SinØs
2 =
(Starting) No. of Runs of cable
0.82 x 0.3 + 0.075 x 0.95
=
1
= 0.32 Ohm

3 Voltage Drop in Volts during starting = √3 x Maximum Length of Cable x ISTG x Impedance of the cable

= √3 x 0.05 x 165.51 x 0.32


= 4.55 V

4 % Voltage Drop during starting = Voltage Drop in Volts during starting X 100
Voltage Rating
4.55 X 100
=
415
= 1.10%

# Sensitivity: LNT Construction Internal Use


Impedance of the Cable when laid in parallel R Cos ØR + X Sin ØR
5 (Running) =
No. of Runs of cable
= 0.82 x 0.81 + 0.075 x 0.59
1
= 0.708 Ohm
6 Voltage Drop in Volts during running = √3 x Maximum Length of Cable x IFLC x Impedance of the cable

= √3 x 0.05 x 55.17 x 0.71


=3.38 V
Voltage Drop in Volts during running X 100
7 % Voltage Drop during running =
Voltage Rating
3.38
= X 100
415
= 0.82%
Condition-2 Satisfies since '% Voltage Drop during starting & '% Voltage Drop during running is less than 15% & 2.5% respectively.
Conclusion :
As per the above calculation sheet the selected cable of 3C x 50 Sqmm satisfies all the 2 conditions stated above.
Hence the selected cable is suitable for 30 kW Motor

This calculation represents typical sizing calculation and the cable length considered is approximate only. It may slightly vary w.r.t. site conditions

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

STP

1 PC-001 STP Transformer PMCC 1 DIRECT 200 200 kVA 0.98 1.000 278.25 N/A

2 PC-002 STP DG PMCC 1 DIRECT 160 160 kVA 0.98 1.000 222.60 N/A

3 PC-003 PMCC MPS PANEL 1 DIRECT 61.24 61.24 A 0.98 1.000 61.24 N/A

4 PC-004 PMCC APFC 1 DIRECT 75 75 kVAR 0.98 1.000 104.34 N/A

5 PC-005 PMCC Mechanical Screen LCP 1 DIRECT 3.70 3.70 kW 0.98 1.000 5.25 N/A

6 MESC-05-B Mech Screen-1 1 DOL 0.45 0.75 kW 0.70 0.795 1.87 11.25

7 MESC-05-A Mechanical Screen LCP Mech Screen-2 1 DOL 0.45 0.75 kW 0.70 0.795 1.87 11.25

8 CY-B Conveyor 1 DOL 0.19 0.37 kW 0.70 0.700 1.05 6.30

9 PC-006 PMCC Grit Seperator Detritor LCP-1 1 DIRECT 3.55 3.55 kW 0.98 1.000 5.04 N/A

10 PC-007 PMCC Grit Seperator Detritor LCP-2 1 DIRECT 3.55 3.55 kW 0.98 1.000 5.04 N/A

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

11 DM-A Detritor Mechanism 1 DOL 0.19 0.38 kW 0.70 0.700 1.08 6.47

Grit Seperator Detritor


12 GCL-A Grit Classifier 1 DOL 0.45 0.75 kW 0.70 0.795 1.87 11.25
LCP-1

13 ORP-A Organic return pump 1 DOL 0.19 0.38 kW 0.70 0.700 1.08 6.47

14 DM-B Detritor Mechanism 1 DOL 0.19 0.38 kW 0.70 0.700 1.08 6.47

Grit Seperator Detritor


15 GCL-B Grit Classifier 1 DOL 0.45 0.75 kW 0.70 0.795 1.87 11.25
LCP-2

16 ORP-B Organic return pump 1 DOL 0.19 0.38 kW 0.70 0.700 1.08 6.47

Aeration Blowers SBR VFD panel


17 PC-007 PMCC 1 DIRECT 20 30 kW 0.81 0.93 55.35 N/A
-1
Aeration Blowers SBR VFD panel
18 PC-008 PMCC 1 DIRECT 20 30 kW 0.81 0.93 55.35 N/A
-2
Aeration Blowers SBR VFD SBR Aeration blower -1
19 BL-A 1 VFD 20 30 kW 0.81 0.93 55.35 83.02
panel - 1
Aeration Blowers SBR VFD SBR Aeration blower -2
20 BL-B 1 VFD 20 30 kW 0.81 0.93 55.35 83.02
panel - 2

21 RAS-A PMCC Return Activated Sludge pump-1 1 DOL 0.92 2.5 kW 0.71 0.835 5.87 35.20

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

22 RAS-B PMCC Return Activated Sludge pump-2 1 DOL 0.92 2.5 kW 0.71 0.835 5.87 35.20

23 SAS-A PMCC Surplus Activated Sludge pump-1 1 DOL 1.49 3 kW 0.76 0.860 6.39 38.31

24 SAS-B PMCC Surplus Activated Sludge pump-2 1 DOL 1.49 3 kW 0.76 0.860 6.39 38.31

25 DEC-A PMCC Decanter Mechanism-1 1 VFD 0.39 0.55 kW 0.70 0.700 1.56 2.34

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

26 DEC-B PMCC Decanter Mechanism-2 1 VFD 0.39 0.55 kW 0.70 0.700 1.56 2.34

27 CBP-A LDB Chlorine Booster pump-1 1 DOL 0.33 0.55 kW 0.70 0.700 1.56 9.37

28 CBP-B LDB Chlorine Booster pump-2 1 DOL 0.33 0.55 kW 0.70 0.700 1.56 9.37

29 PDP-A LDB Polymer Dosing pump-1 1 DOL 0.72 1.1 kW 0.70 0.700 3.12 18.74

30 PDP-B LDB Polymer Dosing pump-2 1 DOL 0.72 1.1 kW 0.70 0.700 3.12 18.74

31 SWP-A PMCC Service Water pump-1 1 DOL 3.3 5.5 kW 0.70 0.795 13.75 82.50

32 SWP-B PMCC Service Water pump-2 1 DOL 3.3 5.5 kW 0.70 0.795 13.75 82.50

Multi Disk Plate Screw Press


33 MPSP-A PMCC 1 DOL 0.4 0.55 kW 0.70 0.700 1.56 9.37
Motor
Agitator for polymer dosing tank-
34 AG-A PMCC 1 DOL 0.72 1.1 kW 0.75 0.810 2.52 15.11
1
Agitator for polymer dosing tank-
35 AG-B PMCC 1 DOL 0.72 1.1 kW 0.75 0.810 2.52 15.11
2

36 FTAM-A PMCC Floculation tank agitator motor 1 DIRECT 0.4 0.55 kW 0.75 0.810 1.26 N/A

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

37 FTAM-B PMCC Floculation tank agitator motor 1 DIRECT 0.4 0.55 kW 0.75 0.810 1.26 N/A

38 VDB-1 PMCC Valve DB 1 DIRECT 20 20 A 0.98 1.000 20.00 N/A

Electrical Hoist LCP for Blower


39 EH-BL-A PMCC 1 DIRECT 2.61 3.7 kW 0.76 0.860 7.88 N/A
Room

40 WR-A PMCC Welding receptales 1 DIRECT 5 5 kW 0.77 1.000 9.03 N/A

41 PC-009 PMCC ACDB 1 DIRECT 12 12 kW 0.98 1.00 17.04 N/A

42 LAB-001 LDB LAB Distribution board 1 DIRECT 5.5 5.5 kW 0.98 1.00 7.81 N/A

43 - LDB Ventilation DB for MPS Building 1 DIRECT 1 1.0 kW 0.98 1.00 1.42 N/A

Ventilation DB for Admin Blower


44 - LDB 1 DIRECT 3 3.0 kW 0.98 1.00 4.26 N/A
Building

45 AC-001 LDB Air conditioner-1 1 DIRECT 1.6 1.6 kW 0.70 0.84 3.81 N/A

46 AC-001 LDB Air conditioner-2 1 DIRECT 1.6 1.6 kW 0.70 0.84 3.81 N/A

47 IST-001 PMCC Instrumentation 1 DIRECT 4 4 kW 0.98 1.00 5.68 N/A

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

48 PC-010 PMCC Main lighting distrbution board 1 DIRECT 15 15 kW 0.98 1.00 21.29 N/A

49 LDB-001 MLDB LDB-1 (Admin Building ) 1 DIRECT 4 4 kW 0.85 1.00 6.55 N/A

50 LDB-002 MLDB LDB-2 (MPS) 1 DIRECT 1 1 kW 0.77 1.00 1.81 N/A

51 LDB-003 MLDB LDB-3 (Outdoor Lighting) 1 DIRECT 9 9 kW 0.85 1.00 14.73 N/A

52 LDB-004 MLDB LDB-4 (Security Cabin) 1 DIRECT 1 1 kW 0.85 1.00 1.64 N/A

MAIN PUMPING STATION

1 RSTP-1 MPS Raw sewage transfer pump-1 1 Star delta 5.4 7.50 kW 0.73 0.84 17.04 76.66

2 RSTP-2 MPS Raw sewage transfer pump-2 1 Star delta 5.4 7.50 kW 0.73 0.84 17.04 76.66

3 RSTP-3 MPS Raw sewage transfer pump-3 1 Star delta 5.4 7.50 kW 0.73 0.84 17.04 76.66

4 RSTP-4 MPS Raw sewage transfer pump-4 1 Star delta 3.7 7.50 kW 0.73 0.84 17.04 76.66

5 RSTP-5 MPS Raw sewage transfer pump-5 1 Star delta 3.7 7.50 kW 0.73 0.84 17.0365 76.66426

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

6 VDB-2 MPS Valve DB 1 DIRECT 20 20 A 0.98 1.00 27.82 N/A

7 PC-011 MPS Mechanical Screen LCP 1 DIRECT 1.87 1.87 kW 0.98 1.000 2.65 N/A

# Sensitivity: LNT Construction Internal Use


LT CABLE SIZING CALCULATION

Supply voltage 415V

L&T Construction Allowable voltage drop at Running 2.5%

Water & Effluent Treatment IC-Wastewater BU Allowable volatge drop while starting 15%

415V-Cable selection Chart for STP

Efficiency @ 75%
Location BKW Rated power

Power Factor @
KW/KVA/KVAR
starter/Feeder

Starting
current

current
Line
Type of
Tag No.

75%
S.no

A B

Qty
From To
KW/KVA/KV KW/KVA/KV Amps Amps
AR /A AR /A

8 MESC-02-A Mech Screen-1 1 DOL 0.75 0.75 kW 0.70 0.79 1.89 11.32

9 MESC-02-B Mechanical Screen LCP Mech Screen-2 1 DOL 0.75 0.75 kW 0.70 0.80 1.87 11.25

10 CY-A Conveyor 1 DOL 0.37 0.37 kW 0.70 0.70 1.05 6.30

TREATED WATER PUMPING STATION

11 TWP-A PMCC Treated Water Pump-1 1 Star delta 8.39 9.3 kW 0.86 0.91 16.53 74.40

12 TWP-B PMCC Treated Water Pump-2 1 Star delta 8.39 9.3 kW 0.86 0.91 16.53 74.40

13 VDB-3 PMCC Valve DB 1 DIRECT 20 20 A 0.98 1.00 27.82 N/A

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

3.5C X 185 Al PVC Buried 235.00 2.00 0.65 305.50 50 100 0.07 0.11 0.61% N/A

3.5C X 185 Al PVC Buried 235.00 2.00 0.65 305.50 20 40 0.07 0.11 0.20% N/A

3.5C X 150 Al PVC Buried 210.00 1.00 0.65 136.50 25 25 0.15 0.25 0.16% N/A

3.5C X 150 Al PVC Air 205.00 1.00 0.68 139.40 25 25 0.15 0.25 0.28% N/A

4C X 4 Al PVC Buried 28.00 1.00 0.51 14.28 50 50 2.93 9.31 1.02% N/A

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 15 15 2.93 6.70 0.08% 0.21%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 15 15 2.93 6.70 0.08% 0.21%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 15 15 2.93 6.70 0.04% 0.12%

4C X 4 Al PVC Buried 28.00 1.00 0.51 14.28 45 45 2.93 9.31 0.88% N/A

4C X 4 Al PVC Buried 28.00 1.00 0.51 14.28 45 45 2.93 9.31 0.88% N/A

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 10 10 2.93 6.70 0.03% 0.08%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 10 10 2.93 6.70 0.05% 0.14%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 10 10 2.93 6.70 0.03% 0.08%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 10 10 2.93 6.70 0.03% 0.08%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 10 10 2.93 6.70 0.05% 0.14%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 10 10 2.93 6.70 0.03% 0.08%

3.5C X 50 Al PVC Air 105.00 1.00 0.68 71.40 15 15 0.32 0.71 0.25% N/A

3.5C X 50 Al PVC Air 105.00 1.00 0.68 71.40 15 15 0.32 0.71 0.25% N/A

3C × 50 Al PVC Air 105.00 1.00 0.68 71.40 20 20 0.32 0.71 0.33% 0.22%

3C × 50 Al PVC Air 105.00 1.00 0.68 71.40 20 20 0.32 0.71 0.33% 0.22%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 40 40 2.93 6.80 0.67% 1.72%

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 40 40 2.93 6.80 0.67% 1.72%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 40 40 2.93 7.27 0.77% 1.88%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 40 40 2.93 7.27 0.77% 1.88%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 40 40 2.93 6.70 0.17% 0.11%

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 40 40 2.93 6.70 0.17% 0.11%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 30 30 2.93 6.70 0.13% 0.34%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 30 30 2.93 6.70 0.13% 0.34%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 30 30 2.93 6.70 0.26% 0.69%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 30 30 2.93 6.70 0.26% 0.69%

3C × 6 Al PVC Buried 35.00 1.00 0.51 17.85 50 50 1.85 4.19 1.20% 3.19%

3C × 6 Al PVC Buried 35.00 1.00 0.51 17.85 50 50 1.85 4.19 1.20% 3.19%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 45 45 2.93 6.70 0.20% 0.52%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 30 30 2.93 7.17 0.23% 0.55%

3C × 4 Al PVC Buried 28.00 1.00 0.51 14.28 30 30 2.93 7.17 0.23% 0.55%

4C X 4 Al PVC Buried 28.00 1.00 0.51 14.28 30 30 2.93 7.17 0.11% N/A

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

4C X 4 Al PVC Buried 28.00 1.00 0.51 14.28 30 30 2.93 7.17 0.11% N/A

4C X 10 Al PVC Buried 46.00 1.00 0.51 23.46 60 60 1.26 3.20 1.60% N/A

4C X 4 Al PVC Buried 28.00 1.00 0.51 14.28 25 25 2.93 7.27 0.60% N/A

4C X 10 Al PVC Air 40.00 1.00 0.51 20.40 35 35 1.26 3.09 0.41% N/A

4C X 16 Al PVC Air 51.00 1.00 0.68 34.68 25 25 0.81 2.41 0.43% N/A

4C X 10 Al PVC Air 40.00 1.00 0.68 27.20 25 25 1.26 3.88 0.32% N/A

4C X 10 Al PVC Buried 46.00 1.00 0.51 23.46 50 50 1.26 3.88 0.11% N/A

4C X 10 Al PVC Air 40.00 1.00 0.68 27.20 25 25 1.26 3.88 0.17% N/A

4C X 6 Al PVC Air 30.00 1.00 0.68 20.40 30 30 1.85 4.19 0.20% N/A

4C X 6 Al PVC Air 30.00 1.00 0.68 20.40 30 30 1.85 4.19 0.20% N/A

4C X 10 Al PVC Air 40.00 1.00 0.68 27.20 30 30 1.26 3.88 0.28% N/A

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

4C X 16 Al PVC Air 51.00 1.00 0.68 34.68 20 20 0.81 2.41 0.43% N/A

4C X 6 Al PVC Air 30.00 1.00 0.68 20.40 20 20 1.85 5.06 0.28% N/A

4C X 4 Al PVC Air 23.00 1.00 0.68 15.64 50 50 2.93 7.36 0.28% N/A

4C X 16 Al PVC Buried 60.00 1.00 0.51 30.60 60 60 0.81 2.12 0.78% N/A

4C X 4 Al PVC Buried 28.00 1.00 0.51 14.28 60 60 2.93 8.11 0.33% N/A

TION

3C × 6 Al PVC Air 30.00 2.00 0.68 40.80 25 50 0.93 2.18 0.39% 0.74%

3C × 6 Al PVC Air 30.00 2.00 0.68 40.80 25 50 0.93 2.18 0.39% 0.74%

3C × 6 Al PVC Air 30.00 2.00 0.68 40.80 25 50 0.93 2.18 0.39% 0.74%

3C × 4 Al PVC Air 23.00 2.00 0.68 31.28 25 50 1.47 3.49 0.62% 1.17%

3C × 4 Al PVC Air 23.00 2.00 0.68 31.28 25 50 1.4662179 3.491877775 0.62% 0.0117285

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

3C × 16 Al PVC Air 51.00 1.00 0.68 34.68 25 25 0.81 2.00 0.58% N/A

4C X 6 Al PVC Air 30.00 1.00 0.68 20.40 30 30 1.85 5.80 0.19% N/A

# Sensitivity: LNT Construction Internal Use


Title CABLE SIZING CALCULATIONS STP CUM MPS (1.5 MLD BHIWADI)

L&T Doc No LE160360-E-WW-SW-DC-4306

Revision A

Date 06.11.2017

art for STP

of the cable

of the cable
Impedance

Impedance
No of runs

Length of

Length of
the cable
Derating

the cable
derating
carrying

Running
capacity

capacity
selected

Starting
current

current

Running
starting

Volatge
carring

voltage
Type of Cable

Cable Laying

factor
Cable
Cable

Cable

Total

drop

drop
after
system

Sqmm Amps Nos Amps Mtrs Mtrs ohm/km ohm/km V% V%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 15 15 2.93 6.70 0.08% 0.21%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 15 15 2.93 6.70 0.08% 0.21%

3C × 4 Al PVC Air 23.00 1.00 0.68 15.64 15 15 2.93 6.70 0.04% 0.12%

NG STATION

3C × 16 Al PVC Buried 60.00 2.00 0.51 61.20 50 100 0.40 1.07 0.37% 0.63%

3C × 16 Al PVC Buried 60.00 2.00 0.51 61.20 50 100 0.40 1.07 0.37% 0.63%

3C × 16 Al PVC Air 51.00 1.00 0.68 34.68 50 50 0.81 2.00 1.16% N/A

# Sensitivity: LNT Construction Internal Use


LARSEN & TOUBRO LIMITED
WATER & EFFULENT TREATMENT SBG

PVC CABLE DETAILS

Approx. Approx.
Resistance at SC kA for 1
Reactance at CURRENT RATINGS Reactance at 50
90deg C sec
No. of cores & 50 Hz Hz
cross sectional
area
Direct in In Air
Ohms/ Km Ohms/ Km Ground Ohms/ Km
Amps Amps

3C × 1.5 Cu 0.107 15.5 21 17 0.172 0.107


3C × 2.5 Cu 0.0985 9.48 27 24 0.287 0.0985
3C × 4 Cu 0.0927 5.9 36 30 0.460 0.0927
3C × 6 Cu 0.0884 3.94 45 39 0.690 0.0884
4C X 2.5 Cu 0.119 9.48 27 24 0.287 0.119
4C X 4 Cu 0.116 5.9 36 30 0.460 0.116
4C X 6 Cu 0.110 3.940 45 39 0.690 0.110
4C X 10 Cu 0.100 2.340 60 52 1.150 0.100
4C X 16 Cu 0.097 1.47 77 66 1.840 0.097
4C X 25 Cu - - - - - 0.12
4C X 35 Cu - - - - - 0.114
4C X 50 Cu - - - - - 0.108
4C X 70 Cu - - - - - 0.102
4C X 95 Cu - - - - - 0.1
3C × 2.5 Al 0.0985 15.5 21 18 0.200 0.0985
3C × 4 Al 0.0927 9.48 28 23 0.303 0.0927
3C × 6 Al 0.0884 5.9 35 30 0.455 0.0884
3C × 10 Al 0.0837 3.94 46 40 0.758 0.0837
3C × 16 Al 0.0808 2.44 60 51 1.210 0.0808
3C × 25 Al 0.0805 1.54 76 70 1.890 0.0805
# Sensitivity: LNT Construction Internal Use
3C × 35 Al 0.0783 1.11 92 86 2.650 0.0783
3C × 50 Al 0.075 0.82 110 105 3.790 0.075
3C × 70 Al 0.074 0.567 135 130 5.300 0.074
3C × 95 Al 0.072 0.410 165 155 7.200 0.0724
3C × 120 Al 0.0712 0.324 185 180 9.090 0.0712
3C × 150 Al 0.0716 0.264 210 205 11.360 0.0716
3C × 185 Al 0.0718 0.21 235 240 14.020 0.0718
3C × 240 Al 0.071 0.16 275 280 18.180 0.071
3C × 300 Al 0.0705 0.128 305 315 22.730 0.0705
3C × 400 Al 0.0704 0.1 335 375 30.300 0.0704
3.5C X 25 Al 0.0805 1.54 76 70 1.890 0.0805
3.5C X 35 Al 0.0783 1.11 92 86 2.650 0.0783
3.5C X 50 Al 0.075 0.82 110 105 3.790 0.075
3.5C X 70 Al 0.074 0.567 135 130 5.300 0.074
3.5C X 95 Al 0.0724 0.41 165 155 7.200 0.0724
3.5C X 120 Al 0.0712 0.324 185 180 9.090 0.0712
3.5C X 150 Al 0.0716 0.264 210 205 11.360 0.0716
3.5C X 185 Al 0.0718 0.21 235 240 14.020 0.0718
3.5C X 240 Al 0.071 0.16 275 280 18.180 0.071
3.5C X 300 Al 0.0705 0.128 305 315 22.730 0.0705
3.5C X 400Al 0.0704 0.1 335 375 30.300 0.0704
4C X 2.5 Al 0.0985 15.5 21 18 0.2 0.0985
4C X 4 Al 0.0927 9.48 28 23 0.303 0.0927
4C X 6 Al 0.0884 5.9 35 30 0.455 0.0884
4C X 10 Al 0.0837 3.94 46 40 0.758 0.0837
4C X 16 Al 0.0808 2.44 60 51 1.21 0.0808

# Sensitivity: LNT Construction Internal Use


Project SEWERAGE SCHEME IN VARANASI CITY, UTTAR PRADESH

Title LT Cable Design Calculation for STP

L&T Doc No LE090490-E-WW-SW-DC-4007

Revision B
Date 22.04.16

XLPE CABLE DETAILS


Overall Diameter

Resistance at CURRENT RATINGS SC kA for 1 sec


90deg C
Unarmoured Armoured Cable

Direct in
Ohms/ Km Ground In Air Amps Round Wire
Amps

15.5 25 22 0.210 - -
9.48 34 30 0.360 - 15
5.9 43 36 0.570 15.50 16.00
3.94 54 47 0.860 16.00 17.00
9.48 34 30 0.360 - -
5.9 43 36 0.570 16.00 17.50
3.940 54 47 0.860 17.50 18.50
2.340 72 62 1.400 18.50 20.50
1.47 92 79 2.300 17.50 21.00
1.54 94 96 2.400 21.00 25.00
1.11 113 117 3.300 23.50 26.50
0.82 133 142 4.700 26.00 29.50
0.567 164 179 6.600 30.50 34.00
0.41 196 221 9.000 33.50 358.00
15.5 - - 0.230 - -

9.48 35 32 0.380 15.500 16.000


5.9 46 42 0.570 16.000 17.000
3.94 57 54 0.940 18.000 18.500
2.44 74 69 1.500 16.200 19.000
1.54 95 93 3.600 19.500 21.700
# Sensitivity: LNT Construction Internal Use
1.11 114 114 3.300 21.500 23.600
0.82 134 138 4.700 24.500 26.800
0.567 164 175 6.600 28.000 30.900
0.41 197 216 9.000 30.800 33.700
0.324 223 249 11.300 33.800 37.000
0.264 249 284 14.200 37.900 41.100
0.21 282 329 17.500 42.000 46.000
0.16 327 392 22.600 46.900 50.900
0.128 369 452 28.300 51.500 55.450
0.1 420 526 37.700 58.600 64.000
1.54 94 96 2.400 21.300 23.600
1.11 113 117 3.300 23.600 25.800
0.82 133 142 4.700 26.800 28.500
0.567 164 179 6.600 31.000 34.000
0.41 196 221 9.000 34.300 37.200
0.324 223 257 11.300 37.500 41.000
0.264 249 292 14.200 41.000 45.000
0.21 282 337 17.500 46.500 50.000
0.16 326 399 22.600 52.500 56.000
0.128 367 455 28.300 56.000 61.000
0.1 418 530 37.700 64.000 70.000
15.5 - - 0.23 - -
9.48 34 31 0.38 16.00 17.50
5.9 43 50 0.57 17.50 18.50
3.94 57 67 0.94 18.50 20.50
2.44 73 70 1.5 17.50 21.00

# Sensitivity: LNT Construction Internal Use


ME IN VARANASI CITY, UTTAR PRADESH

alculation for STP

SW-DC-4007

Overall Diameter

Armoured Cable

Strip

-
-
-
-
-

-
-
-
20.00
23.00
25.00
28.00
32.00
35.00
-

-
-
-
16.800
20.100
# Sensitivity: LNT Construction Internal Use
22.000
24.800
28.500
31.300
34.300
38.300
42.300
47.200
51.800
58.500
21.900
24.300
27.400
31.500
34.800
38.500
42.000
47.200
52.700
57.000
65.000
-
-
-
-
20.00

# Sensitivity: LNT Construction Internal Use


Page 630Title SAGARDIGHI THERMAL POWER PROJECT Transformer sizing
PLANT WATER SYSTEM (SGPWS-2)

LARSEN & TOUBRO LIMITED L&T Doc No LT-DC-LE130733-1-E406


WATER & RENEWABLE ENERGY Revision A
Date 04.10.13

Design Basics

DESCRIPTION : This document is prepared for sizing the 3.3kV and 415V MV cable which is to be terminated between 11/3.3kV
and 11/0.433kV transformers to respective 3.3kV and 415V PMCC panels available in River water intake system for SAGARDHIGHI
THERMAL POWER EXTENSION PROJECT PHASE- II [2 X 500 MW]- [UNITS-3&4] - PLANT WATER SYSTEM PACKAGE

REFERENCES

1 Electrical consumer list

2 Transformer sizing calculation

3 Volume : IIF section I -General Electrical Specification

4 Volume : IIF section XI-Power & Control cables

5 Volume : IIF section XVI-Erection -Cabling , Grounding and lightning protection

Design Basics:

1 3.3kV grade cables are designed for operating 3.3kV motors connected to river water intake pumps.

2 As per specification in volume:II F section XI , clause no:2.09.00 allowable voltage drop shall be maximum 2.5%.

3 As per specification in volume:II F section XI , clause no:2.09.00 allowable motor starting voltage drop shall be maximum 20%.

4 3.3kV cable shall be Earthed XLPE (FRLS) armoured cable.

5 415V cable shall be 1.1kV grade XLPE

6 Ambient design temperature shall be 50 oC .

7 Design fault level for 3.3kV system shall be 40kA for 3 sec.Cable sizing done for the 40kA for 0.25sec.

8 Selection Criteria for cable sizing shall be taken into consideration as per Specification, Vol-IIF, Sec-XI:3, Cl.No. 3.07.01

a) Short circuit current and duration

b) Continuos current

c) Installation conditions

d) Voltage drop under normal running and starting condition.

e) Fault condition of motor and expected time up to which motor contribution persists.

The voltage drop at Motor terminals (i.e., <20%) shall include the Voltage drop at 3.3kV bus as well Voltage drop in cable as per the
9
Vol.IIF, S-II:13.

i.e., Total Voltage drop = Voltage drop at 3.3kV Bus + Voltage drop in cable

(Which shall be <20%)

# Sensitivity: LNT Construction Internal Use 03 of 19


3000 RPM
Efficiency PF
Voltage level Efficiency class KW
Load factor Load factor
1 0.75 0.5 1 0.75
0.18 64 62 58 0.79 0.68
0.25 68 67 63 0.79 0.72
0.37 71.5 70 66 0.79 0.75
0.55 73 72 68 0.81 0.76
0.75 77 76 74 0.81 0.73
1.1 79 78 76 0.82 0.77
1.5 80 79 77 0.82 0.77
2.2 81 80 78 0.82 0.77
3.7 84.5 84.3 82 0.85 0.81
5.5 86 86 84 0.89 0.85
7.5 88 88 86 0.89 0.85
9.3 88 87 85 0.89 0.85
11 89 88 86 0.88 0.86
15 89.5 89.5 87.5 0.88 0.86
18.5 90 90 88 0.88 0.86
22 91 91 89 0.83 0.8
415 Eff2 30 91.5 91.5 90 0.9 0.89
37 92.5 92 90 0.9 0.89
45 92.6 92 90 0.94 0.92
55 93.5 93 90.5 0.94 0.92
75 93.7 93 91.3 0.94 0.92
90 94.2 94 92.5 0.9 0.86
110 94 94 92.5 0.94 0.91
132 94.8 94 92.5 0.94 0.9
150 95 94.5 92.5 0.94 0.92
160 95 94.5 93.5 0.94 0.92
180 95 94.5 93.5 0.94 0.92
200 95.5 95.5 94 0.94 0.92
225 95.5 95.5 94 0.96 0.92
250 95.5 95 93.5 0.96 0.92
275 95.5 95 93.5 0.96 0.92
315 95.5 95.5 94 0.96 0.92
350 95.5 95.5 93.5 0.94 0.9

# Sensitivity: LNT Construction Internal Use


1500 RPM
PF Efficiency PF
Load factor Load factor Load factor
0.5 1 0.75 0.5 1 0.75 0.5
0.59 64 62 58 0.79 0.73 0.6
0.6 68 67 63 0.7 0.64 0.54
0.68 71.5 70 66 0.65 0.6 0.53
0.71 73 73 69.5 0.73 0.67 0.54
0.62 77 76 74 0.78 0.75 0.64
0.7 78 76 74 0.78 0.75 0.64
0.7 80 79 77 0.81 0.78 0.71
0.7 82 81 79 0.82 0.78 0.72
0.73 85 85 83 0.82 0.78 0.72
0.8 86 85 83 0.85 0.82 0.76
0.8 87 86 84 0.88 0.85 0.75
0.8 88.5 88.5 86.5 0.84 0.81 0.73
0.78 89 89 86 0.82 0.79 0.7
0.79 90 90 88 0.85 0.83 0.75
0.79 92 92 90 0.84 0.8 0.72
0.72 92 92 90 0.84 0.8 0.72
0.87 92 92 90.2 0.89 0.86 0.78
0.87 92.5 92.5 91.6 0.89 0.86 0.78
0.88 93 93 91.5 0.89 0.86 0.78
0.88 93.5 93.5 92 0.89 0.86 0.82
0.88 94 94 92.5 0.9 0.88 0.84
0.78 94.5 94.5 92.5 0.9 0.88 0.84
0.84 94.5 94.5 92 0.92 0.88 0.88
0.82 95 95 94 0.92 0.88 0.8
0.9 95.2 95 94 0.92 0.88 0.8
0.9 95.3 95.3 94 0.9 0.86 0.78
0.9 95.3 95 94 0.9 0.88 0.84
0.9 95.5 95.5 94 0.9 0.88 0.84
0.88 95.5 95.5 94 0.88 0.86 0.82
0.88 95.7 95.7 94.5 0.88 0.86 0.82
0.88 95.7 95.7 94.5 0.88 0.86 0.82
0.88 96 96 94.5 0.92 0.9 0.88
0.86 95 95 93 0.92 0.9 0.88

# Sensitivity: LNT Construction Internal Use


1000 RPM 750 RPM
Efficiency PF Efficiency PF
Load factor Load factor Load factor Load factor
1 0.75 0.5 1 0.75 0.5 1 0.75 0.5 1
61 64 60 0.68 0.6 0.5
60 55 48 0.6 0.5 0.4 52 46 36 0.5
69 68 66 0.71 0.63 0.52 65 64 60 0.57
69 68 66 0.71 0.63 0.52 69 68 64 0.63
73 71 69 0.72 0.65 0.58 70 69 64 0.58
76 76 74 0.72 0.66 0.58 72.5 71 68 0.63
78 78 76 0.72 0.66 0.58 77 77 75 0.68
80 80 78 0.75 0.71 0.63 78 78 76 0.73
85 84.03 82 0.79 0.73 0.6 83 83 81 0.74
86 85 83 0.88 0.85 0.75 85 84 82 0.8
87.5 87 85 0.8 0.76 0.68 85 85 83 0.76
87.5 87 84 0.8 0.76 0.68 86 86 84 0.74
88 87.5 86 0.8 0.76 0.68 87 87 85 0.74
90 90 88 0.79 0.73 0.66 88.5 88.5 86.5 0.71
91.1 91.1 89.9 0.84 0.82 0.73 89 89 87 0.75
91.5 91.5 90.1 0.84 0.82 0.78 89 89 87 0.75
92 92 90.5 0.85 0.82 0.73 91 90.5 88.5 0.75
90.5 90.5 88.5 0.75 0.71 0.63 92.5 92 90 0.9
93 93 91 0.85 0.82 0.73 92 92 90.5 0.75
92.5 92.5 91 0.75 0.71 0.63 93 93 91.5 0.73
94 94 92.5 0.83 0.8 0.72 93.5 93.5 91.5 0.73
94.2 94.2 93.5 0.85 0.82 0.71 94 94 92 0.76
94.5 94.5 93.5 0.86 0.82 0.72 94.2 94 92 0.75
95 94.5 93.5 0.86 0.82 0.74 94.5 94.5 92.5 0.75
95 94.5 93.5 0.86 0.82 0.74 95 93 91 0.75
95 94.5 93.5 0.86 0.82 0.74 95 93 91 0.75
95 93.5 91 0.84 0.81 0.72 95 94.5 92.5 0.75
95 94 91 0.84 0.81 0.72 94.5 94.5 92.5 0.73
94.5 94.5 92 0.84 0.81 0.73 94.5 94.5 92.5 0.7
95.5 95 94 0.84 0.81 0.73 95.5 95 94 0.84
95.5 95 94 0.84 0.81 0.73

# Sensitivity: LNT Construction Internal Use


RPM
PF
Load factor
0.75 0.5

0.42 0.32
0.5 0.4
0.54 0.45
0.51 0.41
0.54 0.44
0.6 0.52
0.68 0.61
0.7 0.62
0.75 0.68
0.72 0.64
0.7 0.6
0.7 0.6
0.65 0.55
0.71 0.63
0.71 0.63
0.71 0.63
0.89 0.87
0.71 0.63
0.66 0.56
0.66 0.56
0.72 0.64
0.72 0.68
0.72 0.68
0.72 0.68
0.72 0.68
0.72 0.68
0.66 0.56
0.64 0.6
0.81 0.73

# Sensitivity: LNT Construction Internal Use


Transformer rating Percentage impedance Type of starter Starting current
160 4.50% DOL 6
200 4.50% Star delta 4
250 4.50% ATS 3.5
315 4.50% SOFT 3
400 4.50% VFD 1.5
500 4.50% DIRECT 1
630 4.50%
800 5%
1000 5%
1250 5%
1500 6.25%
1600 6.25%
2000 6.25%
2500 6.25%
3000 6.25%
Primary voltage Secondary voltage
132000 132000
110000 110000
33000 33000
22000 22000
11000 11000
6600 6600
3300 3300
1100 1100
690 690
415 415
230 230

# Sensitivity: LNT Construction Internal Use

Das könnte Ihnen auch gefallen