AL TASNIM ENTERPRISES LLC

REQUEST FOR PROPOSAL


Project Name : Proposed Construction of Public Building {Phase - 2), Plot No. 1205

Project Number: 095 Company Project Number:

TBA Issued by : RED Issued to: RFP

Total Sheet Number: 03 Date of Issue: 04Aug 2019

S. No Information Description Office use

Request for Proposal


RFP for Proposed Construction of Public Building {Phase - 2), Plot No. 1205

General

Please acknowledge receipt of this RFP and attachments, and confirm


your willingness to submit a proposal.

Proposal Conditions;
a) Your offer should be valid for 90 days from
04/08/2019. b) We require your offer on or before
11/08/2019.
c) Your offer must be solely based on the RFP documents and should be
free
of any qualifications. Should you wish to submit an alternative offer, and
then such offer must be additional to and completely separate
from the unqualified offer.
d) The complete set of proposed drawings are available with this
RFP.
e) Contractor must submit his company profile, which includes details
of similar type of project executed and ongoing projects. Any client

�-w
reference letter also should be attached.
f) Completed offer must be submitted in a sealed envelope on the
above prescribed closing date. The company seal & signature must be
there in all pages of RFP.
g) No verbal or telephonic conversation is
allowed.
h) Responses to queries will be circulated to all
invitees

In case of any clarification required please do send email


to
deepak.abeera@altasnim.com
'--�---'-���������������������������-'-����--'


Make it Safe Make it Personal Make it Home
, r
P. 0. Box 2803, Ruwi112-, Sultanate of Oman, HQ +968 24214000 Central Inquiry +968
24590140
F +968 24597931 E ihelpdesk@alturki.com
www.alturki.com
...
ro ro u..u,. o.. .:lq, .., o.JI .t:.� J I .,. olJ f'O:.! .• 111 .., 11
I JI,

AL TASNIM ENTERPRISES LLC

Enclosed with this;

• Bill of Quantities - Civil Structural works

• Structural Drawings, Zone drawing.

Proiect Information:
Proposed Construction of Public Building (Phase - 2).

The scope of work to be consider:


• Grid considered for Phase-2 will be, N-A & 1-6.
• Substructure works - Earthworks, Footings, columns,
Plinth beams, Grade slab etc as detailed in the BOQ.
• Superstructure works - All floor Column, slab/beams,
Block work Masonry excluding finishes.
• MEP Installations - Excluded.
• Provide rate only for Day works.
• Provided Bill of items are tentative, contractor expected
to study the drawings conjunction with the provided
BOQ. If any Omission/addition to the BOQ to be
considered separately at end of BOQ pages with
proper backup documents.
• Contract will lumpsum and contractor cannot claim for
any variation unless drawings has been revised.
• Upon qualification, contractor will have to present their
organization chart, Project plan and also contractor will
have to follow all procedures as per Al Tasnim HSE Policy.

Terms of Business

To be negotiated with Al Tasnim procurement

department. Required Timetable

�ny.d with Al Tasnim procurement department

Jignesh Vyas - General Manager, Real Estate Development

.._,
Make it S afe Make it Personal Make it H ome
, r
P. 0. Box 2803, Ruwi112-, Sultanate of Oman, HQ +968 24214000 Central Inquiry +968 24590140
F +968 24597931 E ihelpdesk@alturki.com www.alturki.com
PROPOSED PUBLIC BUILDING - PHASE 02

AT PLOT NR: 095, MISFAH

ro.! i ,,,·; II
AL TASNIM
Quality You Can Build
On

Bl LL OF QUANTITIES
(CIVIL STRUCTURE WORKS)
August-19

AL TASNIM ENTERPRISES LLC


.
,-
ru,µ.J.Jilll
Al TAI.SNIM
PROPOSED PUBLIC BUILDING-PHASE 02 AT PLOT NR: 0951 MISFAH
lA ... 'tt•(,i•,.,lil:•

GRAND
SUMMARY
Contract
Bill No Description Page no.
Amount

1 PRELIMINARIES -

2 EARTHWORK -

3 CONCRETE WORKS -

4 MASONRY WORK -

TOTAL -

GS/01
BILL NR. 01 - PRELIMINARIES

PROPOSED PUBLIC BUILDING-PHASE 02 AT PLOT NR: 0951 MISFAH


-11 ......,........
:r•�-� Description
Rate Amount
Qty Unit
RO RO

BILL NO. 01 - PRELIMINARIES

A General Requirements 1.00 Item

TO SUMMARY OF BILL NR 01 RO -

2/1/1
BILL NR. 02 - EARTH WORK

-,
11�
PROPOSED PUBLIC BUILDING-PHASE 02 AT PLOT NR: 0951 MISFAH

Description Qty Unit


Rate Amount
RO RO

BILL NO. 02 - EARTH WORK

Excavation and Earthworks

1. Excavation is to be measured NET without


allowance to working space, Contractor should
allow the same Note
on his rate.
2. Contractor should visit the site to determine the
actual scope of works for this section. Note

Excavation for the foundation

A General excavation by mechanical means using jcb,


poclains etc., in all types of soil including dense
soil, disintegrated I weathered I soft rock
(poclainable)
including necessary manual excavation for dressing 14,276.00 m3
the edges & leveling, all leads and lifts.
Filling

B Imported Hard core filling, under foundations, 95%


well compacted approval of the Engineer and as 3,765.00 m3
specified.
c Soil raft with imported, good quality, well
graded,
granular material (engineering fill material) laid to 98%
of maximum dry density with an optimum moisture 12,339.00 m3
content all as per detail Drawings and Specification.
Disposal

D Conveying the surplus earth and debris from the site to


a selected dumping yard or as directed or beyond the
limits of municipality no temporary dumping of debris
at any place without prior written consent of COWi. 8,566.00 m3

TO COLLECTION

2/1/1
BILL NR. 02 - EARTH WORK

.....
11���
., Description Rate Amount
Qty Unit
RO RO

EARTH WORK (Cont'd)

Anti Termite Treatment

A Providing and Laying Anti-termite treatment using


lmidacloprid compound and creating a chemical
barrier under and all around the foundations, pits,
trenches, top surfaces of the plinth filling, junctions of
walls and floors, along the external perimeter of the
building, expansion joints, joints of underground pipes
and conduits, complete by specialized approved
3,952.00 m2
agency, with 10 years Guarantee. Payment will be
made only on the plinth area

Geo grid system


B
7,939.00 m2
Geogrid, Tensar SS-30 or equivalent placed in two
layers at 450mm interval below soil raft.

TO COLLECTION

2/1/2
BILL NR. 02 - EARTH WORK

-..,
11 ��;! Description Qty Unit
Rate Amount
' ·----···- RO RO

EARTH WORK {Cont'd)

COLLECTION

Page - 2/1/1

Page - 2/1/2

TO SUMMARY OF BILL NR 02

2/1/3
BILL NR. 03 - CONCRETE WORKS

......
,.=
�. ..�
........... �.
PROPOSED PUBLIC BUILDING-PHASE 02 AT PLOT NR: 095i MISFAH

Rate Amount
Item Description Qty Unit
RO RO

BILL NO. 03 - CONCRETE WORKS

Substructure

Blinding Concrete

Providing and 12ouring in 12osition 12lain cement


concrete of grade C151 with sul12hate resistant cement1
using graded stone aggregate of 20 mm nominal sizeL
UQto Qlinth level1 including the cost of centering1
shuttering1 finishing and reinforcement. minimum
cement content: 290 !<RL cum for 012c and 280 !<RLcum
for src.

A Below foundations, plinth beams and footings. 81.00 m3

B Below floor 167.00 m3

c Below Steps 14.00 m3

Reinforced cement concrete with SRC

Providing and 12ouring in 12osition reinforced cement


concrete of grade C-401 using graded stone aggregate
of 20 mm nominal sizeL above Qlinth level1 excluding
the cost of centering1 shuttering1 finishing and
reinforcement. minimum cement content: 330 kgL
cum using SRC

D Footings 957.00 m3

E Pedestal 15.00 m3

F Ground beams 206.00 m3

G Ground slab to be compacted with a double vibrating


beam in panels not more than 20 Sq Mt in area,
including using power float. 499.00 m3

H External Steps & Ramps 38.00 m3

J Lift walls 5.00 m3

TO COLLECTION
2/2/1
BILL NR. 03 - CONCRETE WORKS

Rate Amount
Item Description Qty Unit
RO RO-

CONCRETE WORKS (Cont'd)

Substructure (Cont'd)

Formwork

Centering and shuttering for substructure1 using only

Qlastic coated marine grade QI� boards, in good


condition for all horizontal & vertical work including
strutting, QrOQQing etc. and removal of form in all
floors (of any height).

A Sides of foundation, footings, base of columns etc. 979.00 m2

B Pedestals 123.00 m2

c Sides of Ground beams 1,194.00 m2

D External Steps & Ramps 56.00 m2

E Lift Wall 33.00 m2

F Edge of slab 37.00 m2

TO COLLECTION
2/2/2
BILL NR. 03 -CONCRETE WORKS

Rate Amount
U�m Description Qty Unit
RO RO

CONCRETE WORKS (Cont'd)

Substructure (Cont'd)

Reinforcement

Reinforcement high yield steel deformed bars


conforming to B.S.44491 for RCC work including
straightening1 cutting1 bending1 12lacing in 12osition and
binding with annealed steel wires all com12lete at all
levels1 with: (Reinforcement using high tensile
strength bars (Cold twistedLHYSD bars etc.) confirming
to BS 4461 for RCC works of dia varving from 8mm to 25
mm)

A Footings 71.76 t

B Pedestals 2.58 t

c Ground beams 20.56 t

D External Steps & Ramps 7.52 t

E Lift Wall 0.59 t

Hard drawn steel wire fabric BRC Mesh confirming to BS


4482 in floor slabs at all levels of s12ecified grade as
mentioned in the drawings

F BRC Mesh A-252 (Single layer) 3,326.00 m2

TO COLLECTION
2/2/3
BILL NR. 03 - CONCRETE WORKS

Rate Amount
[tern Description Qty Unit
RO RO-

CONCRETE WORKS (Cont'd)

Superstructure

Reinforced cement concrete with OPC

Providing and pouring in position reinforced cement


concrete of grade C-401 using graded stone aggregate
of 20 mm nominal sizeL above plinth level1 excluding
the cost of centering1 shuttering1 finishing and
reinforcement. minimum cement content: 330 kgL
cum using OPC

A Columns at all heights 302.00 m3

B Beams/ Tie beams at all levels 1,048.00 m3

c Floor Slabs at all levels 1,443.00 m3

D Staircases 83.00 m3

E Reinforced walls 5.00 m3

F Lift walls 39.00 m3

G Equipment bases 25.00 m3

H Lintels at all levels 55.00 m3

J Window sills at all levels 15.00 m3

K Projection 37.00 m3

L Pedestals for water tank 25.00 m3

Pre cast Concrete Slab

M Design supply and fixed lOOmm precast concrete slab,


all as per specification and necessary reinforcement as
per the drawing ATE-095-PZ-A-805 42.00 m2

TO COLLECTION
2/2/4
BILL NR. 03 -CONCRETE WORKS

Rate Amount
U�m Description Qty Unit
RO RO

CONCRETE WORKS (Cont'd)

Superstructure (Cont'd)

Form work

shuttering for su(2er structure1 using only (21astic


coated marine grade (21y boards1 in good condition for
all horizontal & vertical work including strutting1
(2rD(2(2ing etc. and removal of form in all floors (of any
height).

A Sides of Columns 2,581.00 m2

B Sides of Beams 5,600.00 m2

c Soffits of Beams 1,480.00 m2

D Soffits of Slabs 9,553.00 m2

E Edge of Slab 129.00 m2

F Sides, Soffits & Steps to Staircases 349.00 m2

G Sides of Reinforced walls 39.00 m2

H Sides of Lift walls 258.00 m2

J Sides of Equipment bases 91.00 m2

K Sides & Soffits of Lintels 625.00 m2

L Siderof"Window sills 137.00 m2

M Sides of projection 269.00 m2

N Sides of pedestal, water tank 123.00 m2

TO COLLECTION

2/2/5
BILL NR. 03 - CONCRETE WORKS

Rate
OCtem Description Qty
Amount' RO
Unit
Ro-

CONCRETE WORKS (Cont'd)

Superstructure (Cont'd)

Reinforcement

Reinforcement high yield steel deformed bars


conforming to b.s.44491 for RCC work including
straightening1 cutting1 bending, placing in position and
binding with annealed steel wires all complete at all
levels, with: (reinforcement using high tensile
strength bars (Cold twistedLHYSD bars etc.) confirming
to BS 4461 for RCC works of dia va(Ying from 8mm to 25
mm)

A Columns 52.98 t

B Beams 104.88 t

c Floor Slabs 184.71 t

D Staircases 9.18 t

E Reinforced walls 0.83 t

F Lift walls 4.64 t

G Equipment bases 2.12 t

H Lintels 4.40 t

J Window sills at all levels 1.28 t

K Projection 1.46 t

Sundries

L 40mm expansion joints; including fixings and accessories. 230.00 m

M 40mm movement joints; including fixings and accessories. 33.00 m

TO COLLECTION
2/2/6
BILL NR. 03 - CONCRETE WORKS

Rate Amount
Item Description Qty Unit
RO RO

CONCRETE WORKS (Cont'd)

COLLECTION

Page 2/2/1

Page 2/2/2

Page 2/2/3

Page 2/2/4

Page 2/2/5

Page 2/2/6

TO SUMMARY OF BILL NR 03

2/2/7
BILL NR. 04- MASONRY WORK

-��.,,;.�:;!
[tern··
PROPOSED PUBLIC BUILDING-PHASE 02 AT PLOT NR: 0951 MISFAH

Description Qty Unit


Rate Amount
RO RO

BILL NO. 04 - MASONRY WORK

Superstructure

External walls

Solid block wall

A 200mm thick solid block work in cement and sand (1:3)


mortar or as specified including, making solid at ends,
corners, jambs as specified 720.00 m2

B 250mm thick solid block work in cement and sand (1:3)


mortar or as specified including, making solid at ends,
corners, jambs as specified 60.00 m2

Parapet walls

c 300mm thick solid block work in cement and sand (1:3)


mortar or as specified including, corners, jambs as
specified 375.00 m2

Cavity block wall

Cavity concrete block wall in cement mortar {1:4}


including plasticiser1 crack control joints1 wall ties1
anchors1 metal lathes1 external control joints1
expamet1 bonding system1 pointing1 stiffeners as
specified

D 350mm overall thickness cavity wall 1,351.00 m2

E 550mm overall thickness cavity wall 160.00 m2

F 750mm overall thickness cavity wall 120.00 m2

TO COLLECTION

2/3/1
BILL NR. 04 - MASONRY WORK
....... ,.,
�! Rate Amount
hem:· Description Qty
Unit RO RO

MASONRY WORK (Cont'd)

Superstructure (Cont'd)

Internal walls

A lOOmm Thick solid block from in cement and sand (1:3)


mortar or as specified including making solid at ends,
corners, jambs. 1,475.00 m2

B 200mm Thick solid block from in cement and sand (1:3)


mortar or as specified including making solid at ends,
corners, jambs. 6,591.00 m2

TO COLLECTION

2/3/2
BILL NR. 04- MASONRY WORK

-�
.. Rate Amount
hem" Description Qty Unit
RO RO

MASONRY WORK (Cont'd)

COLLECTION

Page 2/3/1

Page 2/3/2

TO SUMMARY OF BILL NO 04