Decision trees

Introduction

In many problems chance (or probability) plays an important role. Decision analysis is the general name that is given
to techniques for analysing problems containing risk/uncertainty/probabilities. Decision trees are one specific
decision analysis technique and we will illustrate the technique by use of an example.

Example

A company faces a decision with respect to a product (codenamed M997) developed by one of its research
laboratories. It has to decide whether to proceed to test market M997 or whether to drop it completely. It is estimated
that test marketing will cost £100K. Past experience indicates that only 30% of products are successful in test
market.

If M997 is successful at the test market stage then the company faces a further decision relating to the size of plant
open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
to set up to produce M997. A small plant will cost £150K to build and produce 2000 units a year whilst a large plant
will cost £250K to build but produce 4000 units a year.

The marketing department have estimated that there is a 40% chance that the competition will respond with a similar
product and that the price per unit sold (in £) will be as follows (assuming all production sold):
Large plant Small plant
Competition respond 20 35
Competition do not respond 50 65

Assuming that the life of the market for M997 is estimated to be 7 years and that the yearly plant running costs are
£50K (both sizes of plant - to make the numbers easier!) should the company go ahead and test market M997?

Solution

Although the above example is somewhat simplified it plainly represents the type of decision that often has to be
made about new products.

In particular note how we cannot separate the test market decision from any decisions about the future
profitability (if any) of the product if test marketing is successful.

To enable us to see what is going on consider the figure below where we have drawn the decision tree for the
problem.

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
In that figure we have three types of node represented:

decision nodes;
chance nodes; and
open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
terminal nodes.

Decision nodes represent points at which the company has to make a choice of one alternative from a number of
possible alternatives e.g. at the first decision node the company has to choose one of the two alternatives "drop
M997" or "test market M997".

Chance nodes represent points at which chance, or probability, plays a dominant role and reflect alternatives over
which the company has (effectively) no control.

Terminal nodes represent the ends of paths from left to right through the decision tree.

It is worth saying here that the difficult part of the decision tree technique is drawing up a diagram such
as the figure above from the written description of the problem. Once that has been done the solution
procedure is quite straightforward. Note here that most, but not all, decision trees start with a decision
node. One tip that may help you to draw decision trees is to ask yourself the question "What happens
next?" at each point in the tree as you draw it.

Note here the inclusion of the "no plant" alternative at the plant size decision node. This is necessary because it
simply may not be profitable to build any plant (large or small) even if the product is successful in test market. It is
common in decision tree problems to find that at decision nodes we need a "do nothing" alternative which is an
implicit decision that can be taken.

Note that it is important for the decision tree to be drawn so that there is a unique path in the tree from the initial
node to each of the terminal nodes.

To ease the discussion of the decision tree we have numbered the nodes (decision/chance/terminal) 1,2,3,...,12. At
each decision node we have also numbered the alternatives, at node 1 we have alternatives 1 and 2 and at node 5
alternatives 3, 4 and 5.

Although the decision tree diagram does help us to see more clearly the nature of the problem it has not, so far,
helped us to decide whether to drop M997 or whether to test market it (the decision we are trying to make!). To do
open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
this we have two steps as illustrated below.

In these steps we will need to use information (numbers) relating to future sales, prices, costs, etc. Whilst
we may not be able to give accurate figures for these we need to factor such figures into our calculations
if we are to proceed. Investigating how our decision to test market or not might change as these figures
change (i.e. sensitivity analysis) can be done once we have carried out the basic calculations using our
assumed figures.

Step 1

In this step we, for each path through the decision tree from the initial node to a terminal node of a branch, work out
the profit (in £) involved in that path. Essentially in this step we work from the left-hand side of the diagram to the
right-hand side.

path to terminal node 2 - we drop M997

Total revenue = 0
Total cost = 0
Total profit = 0

Note that we ignore here (and below) any money already spent on developing M997 (that being a sunk
cost, i.e. a cost that cannot be altered no matter what our future decisions are, so logically has no part to
play in deciding future decisions).

path to terminal node 4 - we test market M997 (cost £100K) but then find it is not successful so we drop it

Total revenue = 0
Total cost = 100
Total profit = -100 (all figures in £K)
open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
path to terminal node 7 - we test market M997 (cost £100K), find it is successful, build a small plant (cost
£150K) and find we are without competition (revenue for 7 years at 2000 units a year at £65 per unit = £910K)

Total revenue = 910


Total cost = 250 + 7x50 (running cost)
Total profit = 310

path to terminal node 8 - we test market M997 (cost £100K), find it is successful, build a small plant (cost
£150K) and find we have competition (revenue for 7 years at 2000 units a year at £35 per unit = £490K)

Total revenue = 490


Total cost = 250 + 7x50
Total profit = -110

path to terminal node 10 - we test market M997 (cost £100K), find it is successful, build a large plant (cost
£250K) and find we are without competition (revenue for 7 years at 4000 units a year at £50 per unit =
£1400K)

Total revenue = 1400


Total cost = 350 + 7x50
Total profit = 700

path to terminal node 11 - we test market M997 (cost £100K), find it is successful, build a large plant (cost
£250K) and find we have competition (revenue for 7 years at 4000 units a year at £20 per unit = £560K)

Total revenue = 560


Total cost = 350 + 7x50
Total profit = -140

path to terminal node 12 - we test market M997 (cost £100K), find it is successful, but decide not to build a
plant
open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
Total revenue = 0
Total cost = 100
Total profit = -100

Note that, as mentioned previously, we include this option because, even if the product is successful in test market,
we may not be able to make sufficient revenue from it to cover any plant construction and running costs.

Hence we can form the table below indicating, for each branch, the total profit involved in that branch from the initial
node to the terminal node.
Terminal node Total profit (£K)
2 0
4 -100
7 310
8 -110
10 700
11 -140
12 -100

So far we have not made use of the probabilities in the problem - this we do in the second step where we work from
the right-hand side of the diagram back to the left-hand side.

Step 2

Consider chance node 6 with branches to terminal nodes 7 and 8 emanating from it. The branch to terminal node 7
occurs with probability 0.6 and total profit 310K whilst the branch to terminal node 8 occurs with probability 0.4 and
total profit -110K. Hence the expected monetary value (EMV) of this chance node is given by
0.6 x (310) + 0.4 x (-110) = 142 (£K)

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
Essentially this figure represents the expected (or average) profit from this chance node (60% of the time we get
£310K and 40% of the time we get -£110K so on average we get (0.6 x (310) + 0.4 x (-110)) = 142 (£K)).

The EMV for any chance node is defined by "sum over all branches, the probability of the branch multiplied by the
monetary (£) value of the branch". Hence the EMV for chance node 9 with branches to terminal nodes 10 and 11
emanating from it is given by
0.6 x (700) + 0.4 x (-140) = 364 (£K)
node 10 node 11

We can now picture the decision node relating to the size of plant to build as below where the chance nodes have
been replaced by their corresponding EMV's.

Hence at the plant decision node we have the three alternatives:

Alternative 3: build small plant EMV = 142K


open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
Alternative 4: build large plant EMV = 364K
Alternative 5: build no plant EMV = -100K

It is clear that, in £ terms, alternative number 4 is the most attractive alternative and so we can discard the other two
alternatives, giving the revised decision tree shown below.

We can now repeat the process we carried out above.

The EMV for chance node 3 representing whether M997 is a success in test market or not is given by
0.3 x (364) + 0.7 x (-100) = 39.2 (£K)
plant decision node node 4

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
Hence at the decision node representing whether to test market M997 or not we have the two alternatives:

Alternative 1: drop M997 EMV = 0


Alternative 2: test market M997 EMV = 39.2K

It is clear that, in £ terms, alternative number 2 is preferable and so we should decide to test market M997.

Summary

Let us be clear then about what we have decided as a result of the above process:

we should test market M997 and this decision has an expected monetary value (EMV) of £39.2K
if M997 is successful in test market then we anticipate, at this stage, building a large plant (recall the
alternative we chose at the decision node relating to the size of plant to build). However it is plain that in real
life we will review this once test marketing has been completed.

Note here that the EMV of our decision (39.2 in this case) DOES NOT reflect what will actually happen - it
is merely an average or expected value if we were to have the tree many times - but if fact we have the tree
once only. If we follow the path suggested above of test marketing M997 then the actual monetary
outcome will be one of [-100, 310, -110, 700, -140, -100] corresponding to terminal nodes 4,7,8,10,11 and 12
depending upon future decisions and chance events.

Upside and downside

Conceptually one can think of the set of terminal nodes that can be reached as a result of our test market decision as
the set of possible futures. The best possible future corresponding to the decision to test market M997 is called the
upside and the worst possible future corresponding to the decision to test market M997 is called the downside.

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
We need to be slightly careful here since, as noted above, the actual monetary outcomes will depend both upon
future decisions and chance events.

If we are committed to a large plant (assuming we are successful in test market) then the set of possible futures is
given by [-100, 700, -140] corresponding to terminal nodes 4,10 and 11 and hence the upside is 700 (£K) and the
downside is -140 (£K).

If we are not committed to a large plant (assuming we are successful in test market) then the set of possible futures
is given by [-100, 310, -110, 700, -140, -100] corresponding to terminal nodes 4,7,8,10,11 and 12 and hence the
upside is 700 (£K) and the downside is -140 (£K).

Whilst in this particular example the upside and downside are the same irrespective of whether we are committed to
a large plant or not note how the possible futures are different depending upon whether we are committed to a large
plant or not.

Package solution

The above problem was solved using the package, the input being shown below. The description of the input is as
follows. All data is entered by nodes in the tree. Each node has a type (d for decision nodes and c for chance
nodes), or is left blank for terminal nodes. All following nodes in the decision tree are listed.

If a node comes from a chance node then it has a non-zero probability value assigned. If the node is a terminal node
then a payoff/cost is also assigned.

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
In the output shown below we have for each decision node the expected value and the appropriate decision and for
each chance node the expected value.

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
It is clear that the package agrees with the calculation we carried out before.

Note here that this package is also capable of drawing the tree for use from the input, so we can check we have
entered it correctly), as below.

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
Note here that since the decision tree calculation is so straightforward it is relatively easy to conduct sensitivity
analysis to see how the recommended course of action changes (if at all) in response to data changes.

Sensitivity analysis

Consider the decision tree given above. It is plain that the decision to test market is influenced by the profit of 700
(£K) that we will get if test marketing is successful and we choose to build a large plant and we find that we have no
competition. Colloquially we could say that we are "following the money". Hence we may vary this figure of 700
(and/or vary the probability that this outcome occurs) to see if it changes the test market decision.

For example, suppose the probability that we have no competition with a large plant is no longer 0.6 but is instead
0.45. This implies that the probability that we have competition is hence 1-0.45=0.55. Redoing the decision tree
calculation (here using the package) we get:

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
Hence we can see that the initial decision (to test market) is still the optimal decision.
open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
We can also conduct sensitivity analysis using a more systematic algebraic basis (i.e. assign a symbol p to a given
probability and work out algebraic expressions for EMVs). To see this suppose that the probability of competition
with a large plant is no longer 0.6 but is instead p. This implies that the probability that we have competition is hence
1-p. Assume that we can leave the probabilities for a small plant of competition/no competition unaltered. It is clear
that as p decreases we will at some stage prefer a small plant over a large plant (e.g. if p=0 then a small plant with
EMV of 142 would be preferable to a large plant with EMV of -140). We can therefore ask the logical question "How
small does p have to be before we prefer a small plant?"

To answer this question we have that we will be indifferent between a small and a large plant when their EMVs are
equal, i.e. when
p(700) + (1-p)(-140) = 142
i.e. when 840p - 140 = 142, so p = 282/840 = 0.3357

Hence if p drops below 0.3357 we would prefer a small plant to a large plant. This type of systematic sensitivity
analysis can be preferable in some circumstances to simply trying different numbers and redoing the calculation to
see what the effect is.

Extensions

The basic decision tree technique presented above can be applied to any problem for which a decision tree can be
drawn. There are a number of extensions to the technique and we briefly consider four such extensions below. These
relate to:

discounting
chance nodes
decision nodes
utility.

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
We consider each in turn.

Discounting

In the example given above we were concerned with money received over 7 years. It is plain that £1 received in
seven years time is worth less than £1 received now and a technique called discounting, or discounted cash flow,
(involving finding the net present value of any sum of money) can be used to overcome this difficulty. Applying
discounting merely alters the numbers which are fed into the decision tree so that we are dealing with monetary
values on an equivalent (present-day) basis. It does not effect the processing of the tree (which remains exactly as
indicated above).

Chance nodes

In the example given above we calculated a value for each chance node. Whilst we have used EMV as the value of a
chance node this choice is, in many respects, somewhat arbitrary and other ways of calculating a value for a chance
node have been suggested. To put it another way whilst it is a law of the universe (in this particular corner of the
space-time continuum) that E=mc2 it is not a law of the universe that the value of a chance node must be the equal to
the EMV value!

Reflect that EMV is an average value - but at a chance node we never see the average - something happens once
only (e.g. at chance node 6 we either see competition or not). Hence perhaps the average value is misleading and
we need to look at a chance node a different way.

If we were adverse to losing money and wished to take a conservative attitude to decision making (risk) we might
calculate the value of a chance node as the worst possible outcome that might occur at that node. Such a strategy is
often called a pessimistic strategy (e.g. such a strategy would assign chance node 6 a value of -110 compared with
an EMV of 142).

An alternative strategy would be the optimistic strategy of calculating the value of a chance node as the best
possible outcome that might occur at that node (e.g. such a strategy would assign chance node 6 a value of 310

open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
compared with an EMV of 142).

Yet another strategy would be to take the value of a chance node as equal to the most likely (highest probability)
outcome that might occur at that node (e.g. such a strategy would assign chance node 4 a value of 310 compared
with an EMV of 142).

Alternatively we might take the value of a chance node to be some weighted combination of the EMV and the values
given by the optimistic and pessimistic strategies. The literature contains a number of variations on this theme of
changing the value of a chance node.

Decision nodes

At each decision node we choose one of the alternative decisions at that node based upon an implicit rule ("choose
the alternative with the highest EMV"). Other rules are equally plausible (e.g. "choose the alternative with the highest
ROI" (ROI = return on investment = profit divided by total investment)).

For example consider the small and large plants above. We saw that a small plant led to an EMV (actually an
expected net profit) of 142. That involved a total investment of 100 for test marketing plus 150 to build, so a ROI of
142/(100+150) = 56.8%

A large plant led to an EMV (actually an expected net profit) of 364. That involved a total investment of 100 for test
marketing plus 250 to build, so a ROI of 364/(100+250) = 104%

Whilst, in this case ROI would lead to the same decision relating to the size of plant to build it could have led to a
different decision. For example had the EMV at chance node 9 been 175 then on an EMV basis we would still have
chosen at decision node 5 to build a large plant. But on a ROI basis [175/(100+250) = 50%] we would chose to build
a small plant.

Utility

Using monetary values in the decision tree implies, for example, that a loss of 200K is only twice as bad as a loss of
open in browser PRO version Are you a developer? Try out the HTML to PDF API pdfcrowd.com
100K. If the company doesn't have 200K to lose, but does have 100K, then it is plain that they will regard losing
200K as much worse than losing 100K. Moreover note that often decisions are made by people within the company.
The company makes the profit/loss, not the people concerned with the decision.

Hence the idea of utility is to replace the monetary values at each terminal node in the decision tree by utilities
(points) which reflect the view of the decision maker (or company) to that sum of money (e.g. a loss of 100K might
get a utility value of -5 but a loss of 200K a utility value of -500). In simple terms you can think of utilities as replacing
£'s by points.

Trying to capture the decision-maker's translation of £'s to points is an imprecise process, but it does enable the
decision-maker's valid view of the problem in terms of the importance of £'s to them to be incorporated. Once utility
values have been found then we proceed as before.