OF 1.5MVA
34.5kV/230/115V
SUBSTATION OF
GLORY(PHILIPPINES), AT
CAVITE ECONOMIC ZONE
PRESENTED BY:
ENGR. ANGELO B. MANUEL
PEE ASPIRANT
REE0039424
OUTLINE
• PROJECT STUDY GOALS AND OBJECTIVE
• INTRODUCTION
• ELECTRICAL SYSTEM DATA
• LOAD SCHEDULE STUDY
• VOLTAGE DROP CALCULATION
• SHORT CIRCUIT CALCULATION
• PROTECTION COORDINATION
• ARC FLASH ANALYSIS
• RECOMMENDATION
PROJECT STUDY GOALS
AND OBJECTIVE
8/29/2019
TRANSFORMER
COMPUTATION(MPB 1)
Computed Capacity
% LOAD 100
Transformer Capacity
463.69 kVA
% LOAD 100
500 kVA
% LOAD 92.74%
8/29/2019
COMPUTATION SIZE OF FEEDER
WIRE(MPB 1)
8/29/2019
COMPUTATION SIZE OF MAIN
CIRCUIT BREAKER(MPB 1)
highest breaker Sum of
Main Circuit Breaker the full load current D.F.
of the other
8/29/2019
VOLTAGE DROP CALCULATION
VD Ifl Ze L
VDT
Ze R cos X sin
VD1
VD VD1 VD2 VD3 VD4 VDT
VD2
VD
%VD 100 %
VD3
VS
VD4
8/29/2019
SAMPLE COMPUTATION
Solving VDT :
%VD VS 3.0 230
VDT
100 100
VDT 6.9V
8/29/2019
SUMMARY OF VOLTAGE DROP CALCULATION
8/29/2019
SHORT CIRCUIT CALCULATION
8/29/2019
SYSTEM MODELING
Need to model the following:
Actual Value
Per unit value Formula 4
Base Value
8/29/2019
BASE VALUES
BASE
BASE ZbaseHV ZbaseLV IbaseHV IbaseLV
VOLTAGE(kV)
MVA High Low (ohm) (ohm) (A) (A)
Voltage Voltage
8/29/2019
CALCULATION OF BASE
VALUES
Base power MVA 1000 0.5 1000
Ibase HV
3 Base voltage kV 3 34.5
Ibase HV 8.3674A
8/29/2019
UTILITY MODEL
8/29/2019
TRANSFORMER MODEL
8/29/2019
LINE CABLE MODEL
1 *
ZS ZP Formula 5
3
8/29/2019
SEQUENCE IMPEDANCE FOR WIRE AND
CABLE (ACTUAL AND PER UNIT)
actual
PANEL R0 X0 R1 X1 R2 X2
per unit
PANEL R0 X0 R1 X1 R2 X2
8/29/2019
SHORT CIRCUIT
CALCULATION APPROACH
8/29/2019
SAMPLE COMPUTATION 1
• 3 PHASE FAULT CURRENT AT F3 (MPB 1)
VF
I3PFC (p.u.)
Z1 ZF
1.0
I3PFC (p.u.)
(0.116574 j 0.2869509) 0
I3PFC (p.u.) 1.215194 j 2.991243
3 1.0
IL LFC (p.u.)
(0.2331479671 j 0.573901832) 0
IL LFC (p.u.) 1.052389164 j 2.590492539
IL LFC Actual
IL LFC (p.u. Real) Ibase LV 2.796 1255 .11
IL LFC Actual
3,509.41A
8/29/2019
SAMPLE COMPUTATION 3
• SINGLE LINE TO GROUND FAULT CURRENT AT F3 (MPB 1)
3 VF
ISLGFC (p.u.)
Z1 Z2 Z0 3 ZF
3 1.0
ISLGFC (p.u.)
(0.3454670769 j 0.8488270458) (3 0)
ISLGFC (p.u.) 1.234024218 j 3.0320490767
ISLGFC Actual
ISLGFC (p.u. Real) Ibase LV 3.27355 1,255.11
ISLGFC Actual
4,108.67A
8/29/2019
SUMMARY OF RESULTS FOR SHORT CIRCUIT
STUDY
8/29/2019
PROTECTION
COORDINATION
• TO VERIFY TWO SCENARIOS
• CUT-OUT FUSE AND MAIN PANEL BOARD
• MAIN PANEL BOARD AND ONE BRANCH
DISTRIBUTION CIRCUIT BREAKER
8/29/2019
CU-OUT FUSE AND MAIN PANEL BOARD
0.56347 kA
4.0523 kA
8/29/2019
VERIFY THRU TIME CURRENT CURVE
0.05 seconds
18 seconds
8/29/2019
MAIN PANEL AND ONE BRANCH DP
0.5 seconds
0.05 seconds
3.9 kAIC
8/29/2019
ARC FLASH ANALYSIS
• OBJECTIVE OF THE STUDY
• TO CALCULATE THE INCIDENT ENERGY IN J/cm²
• TO DETERMINE THE REQUIRED PPE CATEGORY
• TO DETERMINE THE ARC FLASH BOUNDARY
• ARCING CURRENT
lg Ia K 0.662 lg Ibf 0.0966 V 0.000526 G
0.5588 V(lg Ibf ) - 0.00304 G(lg Ibf )
8/29/2019
OTHER ARC FLASH FORMULAS
The incident energy:
t 610x
E 4.184CfEn x
0.2 D
8/29/2019
ARC FLASH SAMPLE COMPUTATION
Bolted
Protecti
3 Typical gap Typical
System Protective ve Distan
Phase between Working
Voltage Device Device ce x
fault conductors distance,
(kV) type Trip factor
curren (mm) D (mm)
time(s)
t(kA)
Low
MPB
0.23 4.05 Voltage 0.5 25 1.641 455
1
MCCB's
Then,
lg Ia (MPB1)
8/29/2019
0.37258537
Ia(MPB 1) 10 10 2.3822571 kA
ARC FLASH SAMPLE COMPUTATION
Solving for incident energy normalized at MPB 1
lg En(MPB 1) (0.555) (0.113) 1.081 lg(2.38225 71) 0.0011 (25)
lgEn(MPB 1) 0.2329753
0.525 6101.641
EMPB1 4.184 1.5 0.5848233
1.641
0.2 455
EMPB1 4.184 1.5 0.58482332.625 1.617817606
8/29/2019
ARC FLASH SAMPLE COMPUTATION
8/29/2019
RECOMMENDATION
8/29/2019
THANK YOU FOR YOUR
ATTENTION...