Beruflich Dokumente
Kultur Dokumente
for
Structural Steel and Pipe
Support Fabrication
30 th May 2011
Revision Status
1\
Reference CON-311
THIS COPY IS CONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 2 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
INDEX
1. PURPOSE
2. SCOPE
& REFERENCE~
3.
4. DEFINITIONS
5. RESPONSIBILITIES
6. PROCEDURE
& 7. PAINTING
8. SAFETY
10. ATTACHEMENT
Reference CON-311
THIS COPY IS CONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 3 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
1.0 Purpose
1. The purpose of this method statement is to define the activities and responsibilities
for performing the Structural steel and pipe support fabrication at WG-CCC EMC
(south) PDQ Oman Facilities.
2.0 Scope
1. This Method Statement addresses structural steel and pipe support fabrication
procedure. This procedure is to provide the minimum requirements for the
responsibilities for material handling, workman ship, inspection and acceptance of
structural steel and pipe support fabrication activities at WG-CCC EMC (south) PDQ
Oman Facilities.
3.0 References
&16 0
BS EN 1011 Recommendation for welding of metallic materials
-General guidance for arc welding
Reference CON-311
THIS COPY IS CONTROLLED - CHECK CURRENT REVISION STATUS Revision 00
Page Page 4 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
4.0 Definitions
5. PT Dye-Penetration Testing.
6. ss Stainless Steel.
5.0 Responsibilities
1. The following WG CCC personnel shall be involved and responsible for the steel
structure and pipe support fabrication:
Mechanical Engineer
Fabrication Shop Engineer
Fabrication Shop Foremen
Welding Foreman
QC Manager
QC Engineer
Welding Engineer
QC Inspector Welding
QC Inspector Piping
QC Inspection Structure Steel.
2. Mechanical Engineer.
Mechanical Engineer has overall responsibility for monitoring steel structural and pipe
support fabrication operation in accordance with procedures, specifications and
construction drawings.
3. QC Inspector.
Reference CON-311
THIS COPY IS CONTROLLED - CHECK CURRENT REVISION STATUS Revision 00
Page Page 5 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
5. Engineer/Foreman.
The Engineer/Foreman shall be responsible for the safe operation and quality of work
and shall ensure that the procedures are adhered to and that technical standards are
maintained.
6. QC Manager.
The QC Manager is responsible for maintaining present procedure and Quality
requirements.
6.0 Procedure:
Workmanship applied during fabrication of structural steel shall comply with PDO
Specifications SP-2039 (Standard Drawings); DEP 31.38.01.29; ISO 10721-2 and AISC.
1. Fabrication engineer (Shall ensure the safe and effective working of his section, in order
to ensure that productivity and fabrication criteria are maintained by the Supervisor
personnel under his control.
2. The Supervisor shall be responsible for the safe execution and quality of the work. He
will ensure that technical standards, safety and quality are maintained.
3. Supervisor shall coordinate with the Quality Department who shall be responsible for the
inspection of the Steel Structure fabrication, the compilation, retention of records and
reports to the specific Inspection as per approved drawings.
2. Care shall be exercised to ensure that identification numbers are readily visible at all
times.
3. Upon receiving the materials from the Supplier the different structural steel members
shall be visually checked by Wood Group CCC for any visual defects or apparent
damage. Any items that are defective or damaged shall not be taken or accepted for
fabrication.
4. Material Department personnel shall ensure that the receiving material shall be valid
test certificates and ready to issue for fabrication.
Reference CON-311
THIS COPY IS CONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 6 of 20
Wood Group - CCC Lt d
Contract-C311163 St ructural Steel and Pipe Su ppo rt Fabricati on
6.2 Fabrication:
The fabrication of struct ural steel and pipe support shall be as per approved shop
Drawings.Using appropriate measuring and marking tools, an experienced and
competent fabricator does lay out according to the approved shop drawing.
The objective of this process is to identify cutting lines and locations to drill bolt hole
Plates, beams, channels, pipes etc. are marked by center punching (to show the cutting
line) and by hand writing using metal marker for the identification according to shop
drawing.
Using appropriate cutting and grinding tools/ equipment, marked items are cut and
ground (as appropriate) by experienced and competent fabricator in accordance with
the project specification.
• Physical verification of structural steel members such as beam section, plates And
colour coding is in accordance with applicable project specification.
• Preparing a marking plan and layout as per approved shop drawing to control The
minimum scrap generation.
• Marking and punching the area to be cut as per approved shop drawing
• Steel plates and structural members shall be cut using flame cutting, or Mechanical
cutting equipment in accordance with approved shop drawings.
• Preassembly of the structure which includes fit-up, drilling and tack welding as per
approved shop drawing s
• Inspection and acceptance of pre-assembly and released for welding shall be as per
approved drawings.
• Welding of structural steel members as per approved WPS.
• NDT (Non Destructive testing) , Frequ ency of NDT testing and acceptance criteria
shall be as per Enclosure page (15, 16, 17 & 20).
Reference CON-311
THIS COPY IS CONTROLLED - CHECK CURRENT REVISION STATUS Revision 00
Page Page 7 of20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
• Preparing a marking plan and layout as per approved shop drawing to control The
minimum scrap generation.
• Material conformance with standard pipe support drawings and request for fabrication
(RFF).
• Marking and punching the area to be cut as per approved shop drawing
• Steel plates, pipes and structural members shall be cut using flame cutting, Or
Mechanical cutting equipment in accordance with approved shop drawings.
• The support of the pipe shoe shall be the same parent material of the pipe as per
standard pipe support drawing.
• Preassembly of the pipe support which includes fit-up , drilling and tack welding as
per approved standard pipe support drawings.
• NOT (Non Destructive testing), Frequency of NOT testing and acceptance criteria
shall be as per approved ITP- QUA 305.
& /1 All welding works shall comply with EN 1011; and SP-1279 Section G.
Reference CON-311
THIS COPY IS CONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 8 of20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
Prior to the commencement of welding activities, the WG-CCC shall submit all welder
qualification records and work histories to PDO for approval.
Records of all data, tests and examinations relating to all welding procedures used
during construction and erection shall be made available to the Principal.
Testing procedures and test acceptance criteria shall be subject to the approval of
PDO before fabrication begins.
Welding of structural steel and pipe support shall be as per approved WPS
Welding inspection , frequency of NDT testing, and Acceptance criteria shall be as per
ITP (QUA-305) .
1. All tools used for working on stainless steel including cutting, grinding and buffing
discs, wheels, or brushes shall be those designated for stainless work and shall be
readily recognizable.
2. Cutting of S.S material end preparation shall be carried out using plasma or
mechanical cutting.
3. Only marking materials specifically approved for SS shall be used. Other marking
pens, pencils, chalks are not permitted in the SS shop, in the possession of
materials inspection personnel, or in the possession of welders or fabricators
working on stainless steel at the jobsite.
4. Earthling devices for welding shall be clad or otherwise covered with stainless steel
material.
5. Work areas shall be cleaned of dust and accumulated dirt, sand etc., at regular
intervals. Fabrication shops will be cleaned at the start and end of each work shift
by brooms.
7. The Mechanical Engineer sha ll assure that prior to any crews being assigned to
work on stainless steel, the Engineers of those crews, and the crews themselves
have been properly oriented in the requirements of this procedure, and the general
site philosophy regarding the handling of stainless steel materials.
Reference CON-311
THIS COPY IS CONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 9 of 20
Wood Group - CCC Ltd
Contract-C311 163 Structural Steel and Pipe Support Fabrication
1. Rolled Sections:
After fabrication, the tolerances on cross-sections and straightness of rolled
sections(including rolled sections used as components of built-up
members)shall be specified as below.
2. Cross- Sections:
For built up I or H section members with over all depth of less than 1 m., the
tolerances on the cross section shall confirm to those specified for rolled I
and H Sections In BS EN 10034.
For all other built up sections and I and H sections with an overall depth
greater than 1m. the deviations from the specified dimensions shall not exceed
those specified in below table.
Built up box sections shall not deviate from the specified shape at the
diaphragm by more than that specified in below table.
For members intended to be curved, the curvature shall not deviate from the
specified curvature by more than the tolerance specified in below table.
1. Over at least 50% of the length measured the gap does not exceed0.25mm;
2. Over 90% of the length measured the gap does not exceed 0.75mm.
Reference CON-311
THIS COPY IS CONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 10 of 20
Wood Group -CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
w ~
~
d-.(
t
±4mm
b) Overall depth,D
B < 300 mm ±4mm
c) Width offlanges B~ 300 mm ±5mm
±5mm
d) Off-cetre of web
e)Out- of- squarness of flanfes LJ =B/100 or 3 mm which
ever is greater.
B
Flange width~
'<.::::~ t:LJ
Flange width
v-=-~~~
r
g) Top flange of crane girder, out-of-flatness where rail W=Rail width + 20mm
sits.
.Ll = 1 mm
___. ....
l+-
v ~
_1£)
i ~ ~.Ll
1
Reference CON-311
THIS COPY IS CONTROLLED - CHECK CURRENT REVISION STATUS Revision 00
Page Page 11 of 20
Wood Group - CCC Ltd
Contract-C3111 63 Structural Steel and Pipe Support Fabrication
1. Steel structure member and pipe support shall be stored in their designated area
close to the fabrication shop in accordance with area identification coding . Pipe
supports are stacked in a manner, so it can be easily checked. Steel structure
member and pipe support shall be laid on wooden ballet or other suitable material
above ground level.
6.9. Inspection:
3. The method and extent of inspection and testing in the absence of a relevant
application standard shall be agreed between the Contracting parties.
4. The acceptance criteria for assessing the quality of welds shall be as specified in
the design code or design specification, or drawing or Contract, as applicable.
5. The acceptance criteria for welded joints in the absence of a relevant application
standard shall be agreed between the Contracting parties. The following may be
used as basis for discussion and agreement:
6. Scope of inspection and I NOT Plan with respect to type of joint and thickness shall
be as per BS5950 and approved AFC drawings.
7. Frequency of NOT Testing and acceptance for joint according to ITP -QUA-305.
10. All bolted joints, inspected and approved will be identified by white paint on the
bolts head.
7.0 PAINTING :
& 1. General:
The fabricated materials I members such as structural steel and pipe support shall be
painted as per the method statement CON-307
Reference CON-311
THIS COPY IS CONTROLLED - CHECK CURRENT REVISION STATUS Revision 00
Page Page 12 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
2. Painting:
Prior to painting the field joint surface area shall be cleaned by blast cleaning. The
surface preparation shall be carried out in accordance with SP-1246.
The blast surface visual appearance shall conform to ISO 8501 grade SA 2.5.Any field
joint not painted within 4 ( four ) hours of blasting shall be reblasted prior to the
application of painting.
The surface cleanliness shall conform to that the chloride contamination is less than
2
20 mg I m .
Painting of the field joint shall not takes place until the joint has been inspected and
approved by QNQC.
The cleanliness of the blast cleaned surfaces for every field joint shall be inspected and
shall be in accordance with ISO 8501 grade SA 2.5.After the surface has been blast
cleaned and dusted off, a strip of transparent cello tape shall be applied to the surface
and subsequently removed and examined for particle contamination and released for
painting.
The profile of the blast cleaned surfaces shall be tested on site by a suitable profile
gauge. In accordance with SP-1246.
The repair procedure is applicable for the fabricated structure and pipe supports at shop
shall be selected based on the criteria of magnitude of the damaged area during handling
and storage.
Minor coating I painting damages up to 100 mm in diameter or width and scratches over
100 mm in length shall be repaired by a two coat applicable painting system shall be
fo llowed by manufacturer instructions.
All contamination shall be removed from the surface by cleaning w ith solvent and using a
combination of w ire brushes, buffing wheels and scrapers. The surface shall then be
abraded by using coarse emery paper or flexible grinding disc and ensure that the coating
surrounding the defect is also abraded but not removed.
Damages other than scratches with a diameter or width greater than 1OOmm shall be
removed around the entire circumference by blasting.
The blast surface visual appearance shall conform to ISO 8501 grade SA 2.5.Any field
joint not painted w ithin 4 (four) hours of blasting shall be re-blasted prior to the
application of painting.
The profile of the blast cleaned surfaces shall be tested on site by a suitable profile
gauge. In accordance with SP-1246
Reference CON-311
THIS COPY IS CONTROLLED - CHECK CURRENT REVISION STATUS Revision 00
Page Page 13 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
8.0 SAFETY:
1. Job safety analysis shall be submitted prior to start work, see JSA attached.
2. All fabrication activities (material handling, cutting, fit up and welding) shall be carried
out adhering to the guidelines of Wood Group CCC method statement.
3. Ensure all lifting tackles and job related load taking tools/ tackles are damage /defect
free and also rated to the requirement.
4. Safety signs to be provided a clear area inside Fib shop, see JSA.
7. All welding I cutting tools and equipment should be inspected regularly and should have
appropriate color code sticker.
Flawless start- up initiative I FPD shall be fully implemented as per approved FPD/FSI
procedure and approved FSI flaw list.
10.0 ATTACHMENTS:
Reference CON-311
THIS COPY IS CONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 14 of 20
0 :E
0 0
:I0
@ c.
-1
::1:
.
(')
.....
0
...0G)
(ij
0
0
~
' Woldt1po
Table A.l- Soope of i.Dspeetion- Type of joint. and thiclme~Ses requiring non-destructive teltlng
Butta tun aDd pvtlal-etrUlon (iacWUnt IN~ • itb reintorctn1 llleu) Fnlot 8> I~ ....
en 0
c
"C
0
(ij JolnUypo ln-lioe batt Teo and cnaclform Coraer Lap Tee, cruc:ltui'IZI and CIGJ'II4Ir w 0
0
hooedureo 818 DIS and 818+8 SIS DIS and 9/9+B All AD AD ,...
0
z
-1 !Key Eumpleo s:
elr
~ ~ r~ ~ al4~
f
~t ~
I= createat 1 at a joiat
r =
z peotoot uh joiDI
m SIS a oill(llulded
c DIS= doublo oidod ,
j8 {+I' ~ ~~
+B=backiAa
0
::1:
NM" not mandolorJ
~f f
m
0
"0
c:
::a
f
M:~
Grade I (IIID) 1(111111) t(mm) *(mm) l(mm) l(mm) l(mm) :(mm)
~
z
-1
~
VI
= 1!275/I!IIM <10
ioopcctioa 1:14$1
Ultraoonie S2751S3G5 uo
tealinr 8460
<10
;tlO
I
<U
<10
:t12
uo
:.zo
:.1~
>:13
>:10
u.o
:t16
:.20
HO
:.20
:.16
>:SO
>:20
"20
"16
.NM
.NM
~20
>ol6
I.NM
:.15
INM
>:16
2:20
:016
I
J
I
5 NO')'B 1b ~llllllii_OC!ftil ~\lo ohlll DOt pnc:lude 11\o IIM.o """~"" letiiD' em-ide lllelilllituhoWn lllloui• lluo lUOI!to ofYJOII& JDepoclion « -a.tnl<tive
z ~tq (ND1) mdiula lluot •)a)>H_J&~ity may haw~~ m opiC16oiolnt.s. __ ·- __ I ......enc
~ ...c
(')
~
VI
!.
...
en
CD
~
II)
:I
Q.
"'0::0::0
Ill CD CD "'tJ
CQ
CD
<
ii' -.
-·CD
"""CD -g·
0 ~ en
~ 0
CD c
"C
"C
"'000 0
11100 ;:l.
CQ
CD
z• "T1
II)
...... ~
a'
Ul ......
::::!.
a (')
• • • •
II)
~ !:!:
I 0
:I
Wood Group -CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
Abbreviated tel'IDII
AU At crater
Not at crater I~ ':
D Aa apecified on drawiDp • For definition of orientatJon see Table A.Z.
DB Dreuamoothly • Thickness applies to minimum member tbiclmeas at weld in
E 1Wer to engineer question. For thiclmeuea greater than 20 mm "f' shall be taken
aa 20 mm. Where permitted lri&e "h" of a dieeontinuity is telated to
NL Nolimit "r the .DIBXim11111 permitted value shaD be not leu than 0.3 mm in
NP Not permitted (applies to discontinuities which are aoyeue.
detectable by NDT methode in Table A.l) • Where mme than one leqUirement ia gi'9en both lhall apply.
R &pair by welding to ap)ltOved procedure a Where a repair ia aecenary an appl'OVed procedure shall be uaed. If
:t Greater than or equal to (i.e'. not leBB than) on increaaiDg the lOOPS of inspection, further non-conformances are
~ Leas than or equal to (i.e. nut greater than) found, the •cope .man be increued to 100 % far the joint type in
r. Sum of question.
• Subject to any other locat.ional requireme11ts.
() Mmgt.h of weld over which meaauzement ma,y be 1 "Lap" ahaU apply to any fillet welded attachment whose length in
averaged (mm)
the longitwtiDal direction ezceeda 00 mm.
[] LeDgth of weld over which the swnmation is made (uun)
I Le.ngth parallel to the weld uia ' Lamallar tears may only be accepted in the longitudinal welda if
or
the eatent does aot eaceed limita tor lack t'uaion in transverse
weld~.
Reference CON-311
THIS COPY IS CONTROLLED · CHECK CURRENT REVISION STATUS Revision 00
Page Page 16 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
Table A.l- Scope of inspection- FreqU8Dcy of testing of joints ldentlfted in Table A.l as
requiring non-deatructlve testing
Cai:elloriea ofjoint typM aeeordlas to location ADd orieJitatiolllu lltnachlre
<- ftaue 'below)
Piret 6 identified joiDU ofeach t.nJe
haviDJ the aame basic au-u.io1111,
mat.lal ~ aad weld pometry
~~ncl-Wed to the - prooedwee.
'l'herafter, 1 in 5 joiuta of each type
(it the 6nt 5 contorm to Table A.8).b
Site welds All ident.iftecl joints
Traua- butte in wall 11nd flaDp plates
befbre-bly
--· I
I ~:!!::::9=:::!!!:::!:1:
I I
M• lll!lllber ZOne5 1----------J
l• Transverse to melllber axis (any direction)
L= Longituclinaf (parallel to me.ater ilxis)
Bounclilly betweefl mnnedion and meMber zones
-·--·-· MBibet Axis
Reference CON-311
THIS COPY IS CONTROLLED· CHECK CURRENT REVISION STATUS Revision 00
Page Page 17 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
HAZARDS I
THREATS
Step Description of What could go Action I
Control measures/Recovery
No Task Step wrong? How Consequences Responsible
measures
serious would that party
be?
1. Prepare the method Statement,
JSA approval.
2. Prior to start of activity work
permit system shall be
obtained.
3. Permit shall be displayed at the
worksite inside permit boxes as
per regulation.
4. Site Engineer's name and
phone no. should be available
5. Emergency contact numbers
1 Permit
Violation of and grid reference should be WG-CCC
Procedure Personal
procedures displayed in the permit boxes. Engineer
6. Daily concurrence from
concerned parties shall be
done on daily basis.
7 All persons involved on the job
have to discuss and understand
the work permit, and the
Method Statement and JSA
Inhalation of chemical
Use competent persons to service
Chemicals may lead to Technician
fire extingu ishers off site. Wear PPE.
respiratory disease
4
Fire safety Inhalation of chem ical
may lead to Use competent persons to service
Toxic gas Technician
respiratory disease or fire extinguishers off site. Wear PPE.
cause death.
Inhalation of fumes
may lead to
Use competent persons to service
Fumes asphyxiation . It may Technician
fire extinguishers off site. Wear PPE.
also cause eye
irritation.
Reference CON-31 1
THIS COPY IS UNCONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 18 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
HAZARDS I
THREATS
Step Description of What could go Action I
Control measures/Recovery
No Task Step wrong? How Consequences Responsible
measures
serious would that party
be?
Third party inspection and
Defective lifting
May result to serious certification of lifting equipment and
equipment/ Engineer
injury appliances. Color code. Maintenance
appliances
inspection.
People working Hit by moving Strict supervision, Trained banks
near by the equipment resulting man to give signal, Effective TBT. Engineer
moving equipment injury Restrict entry in loading area,
Unsecured load
Asset damage Secure the loads in the vehicle with Operator I
wh ile
Vehicle Accident proper tackles. Driver
transportation
Explosion, pressure
Gas under Use competent persons to service
release may injure or Techn ician
pressure fire extinguishe rs off site.
kill.
Inhalation of chemical
Use competent persons to service
Chemicals may lead to Technician
fire extinguishers off site. Wear PPE.
respiratory disease
6 Gas cutting of
structure Inhalation of chemical
member may lead to Use competent persons to service
Toxic gas Technician
respiratory disease or fire extinguishers off site. Wear PPE.
cause death.
Inhalation of fumes
may lead to
Use competent persons to service
Fumes asphyxiation. It may Technician
fire extinguishers off site. Wear PPE.
also cause eye
irritation.
Only certified, trained and competent
persons shall conduct this operation .
Personnel no All employees shall go through HSE Gouging
7 Goug ing competent I Personal Injuries indu ction program Engineer I
certified. Wear proper PPE; welder's gloves , Foreman
goggles/visors and spatter proof
clothing when required.
Reference CON-311
THIS COPY IS UNCONTROLLED- CHECK CURRENT REVISION STATUS Revision 00
Page Page 19 of 20
Wood Group - CCC Ltd
Contract-C311163 Structural Steel and Pipe Support Fabrication
HAZARDS/
THREATS
Step Description of What could go Action I
Control measures/Recovery
No Task Step wrong? How Consequences Responsible
measures
serious would that party
be?
Work area will be kept tidy at all
times with periodic removal of work
waste such as un used wood and
Order of work excess section of steel. Structural
area The inside of the piping system will Engineer
House keeping be kept clean by removal of
8
consumables or accumulated dust or
sand.
Waste will be disposed of in the
assorted containers according to type Structural
Hygiene
w ith wood and metal being separated Engineer
from plastic and food w aste
Reference CON-311
THIS COPY IS UNCONTROLLED - CHECK CURRENT REVISION STATUS Revision 00
Page Page 20 of 20
Method Statement for Structural Steel Pipes Support Fabrication CON- 311 Comments Incorporated
Action
Sl No. Item No. Comments Page No. Remarks
Completed
1 Clause 3- 51. No: Check whether DEP 30.48.40.31- GEN. is applicable? Yes Deleted Page 4 of 20
2 Clause 3 -51. No: Mentioned the full title of BS EN 1011 Yes Page 4 of 20 Section 3 of 16
ProCon Page l of 1
Overvi ew Contracts
You are here: Contracts_1'1anjlll§. I Contract (C31 -1163) I ActiVIties I View Activities I Activit y Profile
j Title MS for Structural Steel and Pipe Support Fabrication- CON-311 , Rev F . /
Originator Gopal Krishna OSETllx Origi nat e d 25 May 2011 OO:OO(Gt1T+4.00)
Recipient Alex Deans Owned From./ 2S May 2011
With reference to your letters no: WGC-PDO-'i-00296 dated 21th May 2011, please note that your
submission on above subject matter have been reviewed and is approved with comments.
Clause 3-SI. No: 11 Check whet her DEP 30.48.40.31 - Gen. is applicable?
Description
Clause 3-SI. No: 17 Mention the full title of BS EN 1011
25 May
Created Current State Approved
2011 by Gopal K1ishna OSETllx
Approved 28 May 2011 by Abdullah Harthy OSI:: T
1
· Approved Comments
28 May
Last Updat ed
2011 by Alldulfall Hartlw OSET
Documents