Sie sind auf Seite 1von 1

Single Phase Supply

Monitoring Relay -
Voltage Window Comparator SP 221
AC / DC

WIRING EXAMPLE
(requires optional S3-B base) Application Examples
• Monitoring of the line supply in rural areas for over- and
6
5 7 under-voltage protection.
4 8 • Monitoring of supply voltage from standby generator sets.
Latching
3 9
• System supervision for voltage regulators in AC and DC
systems.
2 10
1 11
• Supervision of voltage levels on solar panels.
• Monitoring the voltage output of UPS systems.
~
+ AC or DC
~-
Power Supply

SUPPLY RELAY
TYPE VOLTAGE AC/DC CONTACTS
ORDERING
CODE SP221 / 240 AC S
SLIMLINE Note: SP221 supersedes SP220

Technical Specification
Power Supply: Voltage Sensing:
AC: 12, 24, 110, 220, 230, 240, 400, 415, 525V ±20% The unit is calibrated to trip on the RMS value of the
DC: 12, 24, 48, 60, 110V ± 20% (no galvanic isolation) supply voltage (assuming no AC waveform distortion)
Response: Repetitive accuracy: 1%
Time delay on trip: adjustable from 0,1 to 10 seconds.
Latching disabled during power-up: approx. 10 seconds. Hysteresis: 2% fixed (relative to its supply voltage)

Description of Controls
P1: The Over-voltage Threshold is LED1: The red LED marked “Over voltage”
SLIMLINE SP-221 adjusted on P1. will illuminate whenever the supply
Voltage Window
Comparator voltage exceeds the set over-voltage
P2: The Under-voltage Threshold is threshold.
Over
10
voltage
15
adjusted on P2.

P1 Note: The scales for over-voltage LED 2: The green LED marked “Relay ON” will
5% 20% and under-voltage threshold settings illuminate when the relay is energised,
15 10 P3 are calibrated in percentage ie. under normal supply conditions, and
Under
voltage deviation from nominal (ideal) supply switches off if the unit registers a fault
voltage. condition, or if the power supply to the
P2
-20% -5% unit is interrupted.
LED 1 Over voltage
P3: Adjustable Time Delay on Trip is
set on P3 from 0,1 to 10 seconds. LED 3: The red LED marked “Under voltage”
LED 2 Relay ON

LED 3 Under voltage


will illuminate whenever the supply
voltage drops below the set under-
voltage threshold.

Operational Diagrams
Example of SP221 Voltage Monitoring without latching Example of SP221 Voltage Monitoring with latching

Over-voltage Over-voltage
Setpoint Hysteresis Setpoint Hysteresis

Nominal Voltage Nominal Voltage


Hysteresis
Under-voltage
Hysteresis Under-voltage
Setpoint Setpoint

Power Supply Power Supply


Voltage t = 0.1 sec
Voltage t = 0.1-10 sec
10 sec

Latching enabled Latching enabled


t t
Relay On
Relay On
t = adjustable time delay on trip Latching disabled at power-up for 10 sec t = adjustable time delay on trip