Beruflich Dokumente
Kultur Dokumente
Faculty of Engineering
Civil Engineering Technology
Solution
Active Earth Pressure, Pa
1 − sin 1 − sin 35
Coefficient of active pressure, K a = = = 0.271
1 + sin 1 + sin 35
Pa = K a ( h + w ) Pa ,o m = 0.271(19 0 + 10 ) = 2.71kN/m 2
Pa ,5m = 0.271(19 5 + 10 ) = 28.46 kN/m 2
Pa ,5.4m = 0.271(19 5.4 + 10 ) = 30.51kN/m 2
1.
1
0.15 5 24 = 9.0 0.9 8.1
2
Bearing Pressure
Resisting moment, MR = 792.16 kNm /m
V 6e
Bearing Pressure , q = 1
B B
348.48 6 ( 0.13)
= 1
3.8 3.8
=111kN/m 2 & 72.4 kN/m 2
qmax =111kN/m 2 150 kN/m 2 → OK
Main Reinforcement
a) Wall
M a −b = 197.6 kNm/m d = 400 − 40 − 10 = 350 mm
M 197.6 106
k= 0.156 k = = 0.054 0.156
f cu bd 2 30 1000 350 2
K 0.054
z = d [0.5 + (0.25 − )] z = d [0.5 + (0.25 − )] = 0.94d
0.9 0.9
M 197.6 106
As = = = 1374 mm 2
0.95 f y Z 0.95 460 0.94 350
(0.13)(b)( h) (0.13)(1000)(400)
A s, min = = = 520 mm 2 , As A s, min
100 100
As ,request = 1374 mm 2 , thus, Provide T20 − 200 mm c/c As , prov = 1570 mm 2
b) Base (Inner)
M b −b = 158kNm/m d = 400 − 40 − 10 = 350 mm
M 158 106
k= 0.156 k = = 0.043 0.156
f cu bd 2 30 1000 3502
K 0.043
z = d [0.5 + (0.25 − )] z = d [0.5 + (0.25 − )] = 0.95d
0.9 0.9
M 158 106
As = = = 1088 mm 2
0.95 f y Z 0.95 460 0.95 350
(0.13)(b)(h) (0.13)(1000)(400)
A s, min = = = 520 mm 2 , As A s, min
100 100
As ,request = 1088 mm 2 , Thus, Provide T20 − 225 mm c/c As , prov = 1396 mm 2
c) Base (Outer)
M a − a = 44.2 kNm/m d = 400 − 40 − 10 = 350 mm
M 44.2 106
k= 0.156 k = = 0.012 0.156
f cu bd 2 30 1000 3502
K 0.012
z = d [0.5 + (0.25 − )] z = d [0.5 + (0.25 − )] = 0.99d 0.95d
0.9 0.9
M 158 106
As = = = 305 mm 2
0.95 f y Z 0.95 460 0.95 350
(0.13)(b)( h) (0.13)(1000)(400)
A s, min = = = 520 mm 2 , As <A s, min
100 100
As ,request = 520 mm , Thus, Provide T16 − 300 mm c/c As , prov = 670 mm 2
2
Shear check
100AS
Check the most critical section a-a the lowest
bd
Va − a =109.0 kN/m
109 103
v= = 0.31N/mm 2
1000 350
1/3 1/4 1/3
0.79 100 As 400 f cu
Vc =
m bd d 25
0.79 100 670 400 30
1/3 1/4 1/3
Vc =
m 1000 350 350 25
= 0.4N/mm 2 0.31N/mm 2 → Ok
Cracking Check
3.12.11.2.7 f y = 460 N/mm 2 , h = 400 mm 200 mm
100 AS
a - b: = 0.45 0.3 ( Table 3.30)
bd
160
Allowable spacing = = 356 mm
0.45
Actualspacing = 200 − 20 = 180 mm 356 mm → Ok
100 AS
b - b: = 0.4 0.3 ( Table 3.30)
bd
160
Allowable spacing = = 400 mm
0.4
Actualspacing = 225 − 20 = 205 mm 400 mm → Ok
100 AS
a - a: = 0.19 0.3
bd
Allowable spacing = 750 mm
Actualspacing = 300 − 16 = 284 mm 750 mm → Ok
Detailing
Distribution Bars;
(0.13)(b)( h) (0.13)(1000)(400)
A s, min = = = 520 mm 2
100 100
Provide T16 − 300 mm c/c As , prov = 670 mm