Sie sind auf Seite 1von 5

SPE 69512

FLUMPING
Eduardo Braganza, Esteban González

Copyright 2001, Society of Petroleum Engineers Inc.


This method used is to suppose the oil production, to
This paper was prepared for presentation at the SPE Latin American and Caribbean know the pump efficiency, calculate the production
Petroleum Engineering Conference held in Buenos Aires, Argentina, 25–28 March 2001.
curve in the annulus, and define the vertical flow
This paper was selected for presentation by an SPE Program Committee following review
of information contained in an abstract submitted by the author(s). Contents of the paper,
condition that may be possible the combination of
as presented, have not been reviewed by the Society of Petroleum Engineers and are flowing by the annulus and pumping in the tubing
subject to correction by the author(s). The material, as presented, does not necessarily
reflect any position of the Society of Petroleum Engineers, its officers, or members. Papers production.
presented at SPE meetings are subject to publication review by Editorial Committees of
the Society of Petroleum Engineers. Electronic reproduction, distribution, or storage of any
part of this paper for commercial purposes without the written consent of the Society of
Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an
abstract of not more than 300 words; illustrations may not be copied. The abstract must Introduction
contain conspicuous acknowledgment of where and by whom the paper was presented.
Write Librarian, SPE, P.O. Box 833836, Richardson, TX 75083-3836, U.S.A., fax 01-972-
952-9435. When the pressure of the oil reservoirs declines , they
change the flowing well performance, chord with the
Abstract flowing well´s behavior
Between the phases gas and liquids and considering
The inflow performance of a well represents the ability that it conforms the pressure constantly decreases in
of that well to give up fluids. This ability depends to a their vertical lift for the production pipe, the raw
great extent upon the type of reservoir and drive petroleum removes the gas that contains in solution,
mechanism, and such variables as reservoir pressure, falling the volume of liquid, modifying its relationship
permeability, etc. It is common practice to assume that with free gas, generating such flows quickly as that of
inflow into a particular well with constant conditions is bubble, slug, froth, annular, and mist that together with
directionally proportional to average reservoir other such variables as viscosity and its dependence
pressure. When this pressure decline, the well is not of the pressure and temperature, characteristic PVT of
able to flow by itself and it is necessary to used a the fluids of the location, head pressures, etc., they
properly artificial lift method. finish hopelessly in the necessity of establishing a
In many cases, sucker rod pumping is the method system of artificial production to optimize the
used. extraction of liquid of the oil wells.
Some times, the dynamometer registers shows that One of the systems of artificial extraction used
the well is flowing by itself and at the same time the historically, is the beam pumping.
sucker rod beam is pumping, and as soon as the Under this extraction system, some wells don't present
operator stop de sucker rod beam, the production action of pumping before the surface dynamometer,
quickly ceases till de sucker rod start again, but still but however, they have a continuous production, in
without any sign of pumping action. many in disagreement cases with the bottom hole
But flumping is a combination of flowing and pumping, design. On the other hand if we suppose that the well
and it is when a well that is being pumped through the returned to its fluent condition and we stop the team of
tubing is flowing at the same time from de casing pumping, we observe that the contribution of liquid for
tubing annulus. There is no question here of a dual the production pipe decays immediately and alone it
completion, and both the annulus and the tubing returns when the action of the mechanicalpump
production come from the same horizon. begins, it is worth to say, the well really flows
Many wells today are flumping, and this condition is maintaining the valves it fixes and opened traveler, but
generally fortuitous and no conscious effort has been alone when the team of pumping is working. This way
made to bring it about. It is therefore worth inquiring of producing can be almost continuous, to last many
into the nature of flumping to be able the engineers months or to appear intermittently, it is known in the oil
achieve a production method to be applied in certain jargon as agitation.
types of well.
2 EDUARDO BRAGANZA, ESTEBAN GONZALEZ SPE 69512

In other circumstances that it is in fact the topic that proportion of splits gas will allow us to study the
occupies us, the surface dynamometer it indicates that fluency in the ring space.
the well production usually takes place for pumping The bottom temperature will stay constant.
mechanic, but when observing the annulus, or rather, Knowing the flow taken place to a given bottom
to verify their operative condition, we find that the well pressure, the GOR, and the efficiency of the anchor of
is arising. This fluent situation with pumping in most of gas, the volume of gas is calculated derived to the
the locations is fortuitous and some doesn't respond to annulus space.
design and therefore, it is generally intermittent and Knowing the gas that goes for the bomb and the
chord only at once in particular in those that the quantity of liquid taken place by the well, according to
conditions of bottom pressure and relationships gas the IPR, it is defined the flow of liquid derived to
petroleum, among other variables, allow the annulus among pipes and for each bottom pressure the
fluency. relationship liquid gas that has in the ring space.
The work reason is to normalize a calculation that
allows ahead of time, to design a bottom installation The production of liquid is obtained by annulus space,
jointly for mechanical pumping with the conditions of starting from the total production of petroleum and
necessary annulus to maintain a fluency with gas, for each bottom pressure, subtracting the
pumping. mechanical displacement of the bomb and the gas not
derived to the ring space.
Development The resulting GOR is determined for each pwf.
Then, fixed the flow to extract for among columns,
When analyzing the effectiveness of the bomb in the they are defined, using Gilbert or Hagendorn and
inferior part of the well, it is normal to calculate the Brown, to the depth of the formation, the bottom
defined volumetric efficiency as the production of pressures and necessary GOR to achieve the fluency
liquid pumped from the well, referred to the for the ring space. The intersection of the calculated
displacement of the bomb under the conditions of well resulting GOR, Chart 1, curve 1, with the necessary
bottom. ones to achieve the fluency, chart 1, curve 2, define
If it is considered that the volume of liquid produced, it the bottom pressure that will take place for pumping in
is the one displaced by the bomb, you can calculate the production pipe and simultaneously for fluency in
the efficiency of the anchor of gas the ring space..
q ! i (GOR − Rs ) * Ai + qwi + q ! i * B ! i − D The methodology will be developed explained with the
Eg = data of a well designed to achieve flumping.
q ! i (GOR − Rs) * Ai
Results
being D the displacement of the bomb to produce the
liquid q i +qwi + the gas not derived to the annulus, Flumping
taken place by the location for a pressure of bottom
pwfi, with a relationship gas-petroleum (GOR) and Rs AIB LUFKIN-M-456D-305-144
(dissolved gas to Pwf).. Stroke 120”
It will be considered that the production of the well G.P.M. 7
responds to IPR direct line. Rod string Nro 85 -
Being 29,6% 1" 30,4% 7/8" 29,5% ¾ " 10,5% 5/8"
Production pipe - diameter 2 7/8"
pa * Twfi * Zi * Casing-diameter-5 ½"
Ai =
pwfi * Ta * 5,614 Tubing Shoe 1981 m
With reference to the relationship gas petroleum, it is Crossbeam 2010 m
remembered that when a well is extracted by pumping Wellbore Fund 2048 m
mechanic, they decrease the bottom pressures to Perforation 1936-1983 m
values inferior limits, and you can consider that the Production rate 26 m3/día
relationship instantaneous GOR will depend WOR 63 %
exclusively on this pressure and it will maintain low Associate gas 1385 m3/día
and constant values, whenever we operate in a Pwf 44 kg/cm2
location with gas drive solution, like it is that of this Half pressure or static 129 Kg/cm2
presentation. Specific graveness 0,865
The effectiveness of the anchor of gas, is expressed Gas Anchor :poor man anchor.
as the efficiency Eg, that indicates the proportion of Tubing inside diameter 1,75 “
gas free present that strays for the annulus. This Calculations:
Table 1, Table 2, Table 3, Chart 1
SPE 69512 FLUMPING 3

Eg chart 2 Eg = gas anchor efficiency


Tubing Production = 128 bbl/day Ar = sucker road cross-sectional area, sq inch
Casing Production = 16,5 bbl/day M= crank/pitman relation
Bottom pressure = 792 psi Sp = Plunger stroke, inch
GOR (annulus)= 0,744 mcft/bbl T1 = Temperature of bottom of the well, ºF
T a= standard Temperature, ºF
3
Conclusions qg = gas rate, ft /day
Bo = Petroleum volume factor
This work has been developed with the certainty that sgo = oil specific graveness
the sucker road pumping has been considered a lot of sgg = gas specific graveness
time like a mechanism of fundamentally simple
pumping and understood by all. This demonstrates it Subscripts
maybe the real achievements in the design of
mechanical systems that operates with efficiency in i= Bottom hole condition
situations that demand every time bigger depth of the
well or deviation of the hole, in those that one has
bigger production of sand or paraffin, or with raw with Acknowledgments
bigger or smaller viscosity, significant quantities of
free gas, etc. We thank, Pecom Energía, Entre Lomas for valuable
On the other hand the wells to pumping are not experimental information.
generally spectacular wells, their productions don't
always call to concern to the extraction engineers References
neither the interests managerial positions but in new
wells and of potentials high. - Kermit E. Brown, the technology of artificial lift
It is for this reason and without forgetting that the methods copyright 1984,
mechanical pumping this in the heart of this industry, - Penn Well Books, Pennwell Publishing Company,
is expected that the exhibition of this work stimulates Tulsa, Oklahoma
an interest renovated in some of the queries and -T.E.W.Nind, Foundations of Production and
possibilities that remain with a partial solutions or Maintenance of Oil Wells". First Edition 1987, Editorial
without answers. Limusa, Mexico.
A method to improve the efficiency of the bomb is to - Francis S. Manning and Richard E.Thompson, Oil
split the free gas up in the ring space of the well in Field Processing of petroleum, volume 2. Crude Oil",
question and to purge this gas in the casing head Copyright 1991, Penn Well Books, Pennwell
valve, through individual or for the same conduction Publishing Company, Tulsa, Oklahoma
line that takes the petroleum taken place by the tubing
production to the respective battery.
The free gas can also be used to give energy motor.
Nevertheless always this situation is of conflict and a
permanent problem in the mechanical pumping, is the
annulus free gas .
No producer doubts that occasionally he/she has
observed fluency in well head tubing pipe.
Therefore, to be able to design an installation of
pumping considering fluency at the same time with the
action of the bomb. It constitutes an effective method
of producing and optimizing. It is added charts and
tables of results to help the calculates.

Nomenclature

D = bomb displacement, bbl/day


q0 = Oil production in std conditions, bbl/day
qw = Water production in std conditions, bbl/day
3
GOR = relationship gas petroleum, ft /bbl
pa = atmospheric pressure, psi
pwf = bottom pressure, psi
ps = static pressure, psi
4 EDUARDO BRAGANZA, ESTEBAN GONZALEZ SPE 69512

TABLE 1
S (inch)= 120 GLR (cft/bbl) 299 c/h = 0,29
H (ft) = 6500 GOR (cft/bbl) 808 Ar (sq inch) 0,5907
IP(bbl/psi) = 0,131 sgo= 0,834 Wf (lb) = 5650
Ps (psi) 1896 sggs= 0,7 Wr (lb/ft) 0 14203
TF (ºF) = 158 ºAPI = 38 Er (inch/lb ft)= 7,38E-07
Sp (inch) = 98,8 N (stroke/min) = 7 K (% g) = 0,357
D (bbl/day) = 247,0 Dplunger (inch) = 1,75

TABLE 2
Pressure (psi) ql (bbl/day) qo*Bo qw qg(free to pwf) q (total to pwf) Eg
900 130,5 49,6 82 83 214 0,00
850 137,0 52,0 86 95 233 0,15
800 143,6 54,4 90 109 254 0,32
750 150,1 56,8 95 126 277 0,46
700 156,7 59,2 99 145 303 0,58
650 163,2 61,5 103 168 332 0,67
600 169,8 63,9 107 195 366 0,75
550 176,3 66,3 111 227 404 0,81
500 182,9 68,6 115 266 449 0,87
450 189,4 71,0 119 313 504 0,91
400 196,0 73,3 123 373 570 0,94
350 202,5 75,6 128 451 655 0,96
300 209,1 78,0 132 556 766 0,98
250 215,6 80,3 136 704 920 1,00
200 222,2 82,6 140 928 1150 1,00

TABLE 3
Curve 1 Curve 2
qg (bomb) q gas (annulus) q liq (annulus) Pwf GLR (annulus) Pwf GLR
83 0 0,0 900 0 2920 0
81 14 0,0 850 0 2520 0,1
75 35 16,5 800 0,65 2360 0,2
68 58 16,5 750 1,00 1920 0,3
62 84 16,5 700 1,34 1600 0,4
55 113 16,5 650 1,65 1280 0,5
49 146 16,5 600 1,96 1020 0,6
42 185 16,5 550 2,24 760 0,8
36 230 16,5 500 2,52 720 1
29 284 16,5 450 2,78 690 1,2
23 351 16,5 400 3,03 670 1,5
16 435 16,5 350 3,26 620 2
10 546 16,4 300 3,48 590 3
3 701 16,4 250 3,69 560 5
0 928 16,4 200 3,88 520 10
SPE 69512 FLUMPING 5

Chart 1
Cas ing flow ing bottom hole pr e s s ur e

4,5

3,5

3
GLR (mcft/bbl)

2,5

1,5

0,5

0
0 500 1000 1500 2000 2500 3000 3500
Pres s ure (ps i) Curv e 2
Curv e 1

Chart 2

An chor gas e fficie ncy

1,10

1,00

0,90

0,80

0,70
Eg

0,60

0,50

0,40

0,30
900 800 700 600 500 400 300 200 100
Pres s ure (ps i)

Das könnte Ihnen auch gefallen