Sie sind auf Seite 1von 15

KEY PLAN

GENERAL NOTES

C.

1 CONTRACT ISSUE BR RC SH 16.12.15

0 ISSUED FOR TENDER BR RC SH 17.09.15


Job Project
No. Revision Drawn Manager Director Date

Title

Scale NTS DO NOT SCALE


Drawn BR Designer GL
Drafting EB Design RC
Check Check
Approved
(Project Director) SH
Date 05.03.2015

Drawing No. Original Size

A1
CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:03 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\50-General Services\M.56.D.XX.01.dwg
KEY PLAN

GENERAL NOTES

C.

2 CONTRACT ISSUE BR RC SH 16.12.15

1 TENDER ADDENDUM BR RC SH 05.11.15

0 ISSUED FOR TENDER BR RC SH 17.09.15


Job Project
No. Revision Drawn Manager Director Date

Drawing Revisions

Title

Scale NTS DO NOT SCALE


Drawn BR Designer GL
Drafting EB Design RC
Check Check
Approved
(Project Director) SH
Date 05.03.2015

Drawing No. Original Size

A1
CONTRACT Rev. 2
Plot Date: 11 December 2015 - 5:03 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\50-General Services\M.56.D.XX.02.dwg
KEY PLAN

GENERAL NOTES

C.

ROOF LEVEL
MEP Plant

1 CONTRACT ISSUE BR RC SH 16.12.15

0 ISSUED FOR TENDER BR RC SH 17.09.15


Job Project
No. Revision Drawn Manager Director Date

LEVEL 9
Laboratories

LEVEL 8
Laboratories

LEVEL 7
Laboratories

LEVEL 2

GROUND FLOOR
Entrance Area, Retail, DEWA
Substation

Title

Scale NTS DO NOT SCALE


Drawn BR Designer GL
Drafting EB Design RC
Check Check
Approved
(Project Director) SH
Date 05.03.2015

Drawing No. Original Size


BASEMENT 01
Car Park, MEP Plant A1
CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:03 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\Schematics\M.56.S.XX.01.dwg
KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

Animal Holding Air Intake Shaft


R 15
14.4 m² O
R 16

EE
FFL_0.00m
1 R 17
2
P
Procedure R 18

Holding Room 1 Animal House Exp. Area


Holding Room 3 Holding Room 4 17.8 m² FF R 19

44.0 m² Holding Room 2 55.7 m² Q

POTENTIAL
38.4 m² 55.7 m² 60.0 m² FUTURE
LINK
R 20

GG

DN
R
R 21

R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

FHP

GENERAL NOTES
Corridor (Clean Side)
102.9 m²
Animal Holding Plantroom

144.7 m²

Holding Room 5 C.
31.9 m²

Procedure Procedure Surgery 1 Prep. Surgery 2 Clean Cages


16.1 m² 12.5 m² 33.8 m² 13.0 m² 33.5 m² 43.7 m²

D.
E.

Autoclave Lobby
30.8 m²
Staff Office
21.3 m²

WC WC
2.1 m² 2.1 m² 1 CONTRACT ISSUE BR RC SH 16.12.15
Office Quarantine Mice Quarantine
16.6 m² 7.5 m² 23.3 m² Laundry
6.5 m² Grease Trap Dry pit for pums 0 ISSUED FOR TENDER BR RC SH 17.09.15
18.9 m² 12.6 m² Job Project
No. Revision Drawn Manager Director Date
Food/Bedding Store Dirty Cages
24.0 m² 80.1 m²
Shower Shower Drawing Revisions
2.0 m² 2.0 m²
Quarantine Rats
WC
7.5 m²
Change/F. 2.7 m²
Electrical Room Change/M.
16.6 m² 10.1 m² 10.1 m²
EE Holding Tank
Corridor 25.6 m²
15.0 m² Corridor
26.7 m²

Du Landline/GSM room Lobby


15.8 m² 22.6 m²
Lobby
8.6 m²

Building Stores
38.2 m²

Shipping Receiving
84.3 m²
Plantroom Corridor
11.1 m² 152.2 m²

FF -80 Freezer Room Lobby


64.2 m² 16.7 m²

Vacum Waste 22
Lobby
Lift 1 14.4 m²
9.3 m²
8.8 m²

Bin Store Liquid Nitrogen


Lift 3 ELV Closet 11.6 m² 13.9 m²
8.8 m² 0.4 m²
LV Closet
0.7 m²
Lobby
20.6 m²
Lift 2
8.8 m² ELV Room
3.3 m²

Animal Hold Exh. Ducts


Lift 4 11.9 m²
8.8 m² Stair Core 1
17.6 m²
Corridor
11.7 m² Central Autoclave
34.8 m²

L.P. SHaft
GG Facilities Management Off. 1.6 m² Central Glasswash
26.6 m² 22.9 m²

Shower
WC 2.3 m²
Plenum
6.1 m²
18.3 m²

Lockers
6.1 m² Autoclave
19.4 m²

WC
2.3 m²
WC
Title
2.1 m² Car Park Exhaust Fan Room
37.6 m²
C.P. Shaft
0.5 m²
Car Park Exhaust Shaft
S.P. Shaft
32.4 m² 0.5 m²
Scale 1:100 DO NOT SCALE
Drawn BR Designer GL
DN Stair Core 3
13.5 m² Drafting Design
UP Check EB Check RC
Approved
(Project Director) SH
Car Park Exhaust Shaft Date 08.04.2015
33 2 m²

Drawing No. Original Size

R 15 R 16 R 17 R 18 R 19 R 20 A1
CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:03 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.P1.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

25 26 27 28 29

1:60
R 17 R 15 R 22

R 16

Slope
R 17

R 18

LPG
Riser

EE
R 19
3
R 20
EE FF

R 21
FFL_0.00m
GG

R 22

GENERAL NOTES

R 18
C.

D.
E.

Retail 01
R 19
FF Entrance Lobby
291.2 m² 153.8 m²

1 CONTRACT ISSUE BR RC SH 16.12.15


Lift 1
8.8 m² 0 ISSUED FOR TENDER BR RC SH 17.09.15
ELV Closet Retail 02
0.6 m² 66.1 m²
Job Project
No. Revision Drawn Manager Director Date
WC
2.2 m²
Lift 3 Drawing Revisions
8.8 m² Stair Core 1
17.3 m²
LV Closet
1.0 m² WC
2.2 m²
Lift 2 R 20
8.8 m² Animal Hold Exh. Ducts
8.3 m²
Corridor
48.5 m²
Lift 4
8.8 m²

UP Retail Exh. Ducts


4.4 m² WC
2.2 m²
DN
Female WC
8.6 m² Service Corridor
Store 73.2 m² WC WC Retail 03
3.3 m² 2.2 m² 2.1 m² 66.1 m²
L.P. SHaft
DN 2.4 m²
Security & BMS FTC
26.0 m² 2.1 m² WC
2.2 m²

Stair Lobby
7.8 m² Male WC
Janitor Room 8.2 m² Electrical Room
8.8 m² Foyer 28.0 m²
51.5 m²

Corridor
12.1 m² Auditorium
113.6 m²

Disabled WC C.P. Shaft


5.5 m² 0.9 m²

Aditorium Store
12.4 m² S.P. Shaft
0.9 m²

WHR
1.4 m²

DN

Stair Core 3
20.6 m²
Piped Ser. Riser
1.4 m²
Fire Command Room
R 15 10.6 m²

Retail 04
139.8 m²
I.T. Room
19.4 m²
WC
R 16 2.2 m²
WC
2.2 m²

R 17 Disposal Hold
19.7 m²
60
0
FIR
ED

LV Riser
OO
R

7.0 m²

L.P. Shaft

R 18 Fire Fight. Lift Lobby 0.7 m²


18.2 m²
S.P. Shaft
2.4 m²
Lift 5
7.7 m² Title
LPG
Riser
Stair Core 2
17.3 m²

(Fire Fight.) Lift 6


7.7 m²
R 19 Scale 1:100 DO NOT SCALE
UP
Drawn BR Designer GL
Drafting EB Design RC
DN Check Check
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No.
Original Size

A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:03 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.00.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

R 18
C.

Reception
185.7 m²

D.
E.
Dis. WC Executive Lounge
Access Male WC 4.0 m² 47.6 m²
Doors 17.3 m² R 19
Female WC
16.9 m²

Corridor Off Executive Dir 1 CONTRACT ISSUE BR RC SH 16.12.15


Lift 1 21.0 m² 27.6 m² 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m²
Job Project
No. Revision Drawn Manager Director Date
LV Closet
Lift 3 ELV Closet 1.0 m²
8.8 m² Stair Core 1 0.6 m²
17.5 m² Off Executive Dir
Store 28.2 m²
Lobby DN 21.1 m²
Lift 2 R 20
8.8 m² 22.5 m²
Animal Hold Exh. Ducts
WC
8.4 m²
Lift 4 14.9 m²
Corridor Lobby Off Executive Dir
8.8 m²
11.2 m² 27.6 m²
Retail Exh. Ducts 13.5 m²
Corridor
4.4 m² AV Room 142.0 m²
Corridor 10.2 m²
22.4 m²
Off. Dir. 1
S.P. Shaft 18.7 m²
2.4 m²
Kitchen/Pantry
FTC 15.5 m²
2.1 m²
Off. Dir. 2
17.9 m²

Meeting 1
22.7 m² R 21
Meeting 2 Off. Dir. 3
23.5 m² 18.7 m²
Lounge
34.1 m²

Board Room (20) Off. Dir. 4


98.0 m² Admin. Support Staff (42) Store 18.7 m²
169.2 m²
12.2 m²

Off. Dir. 5
17.9 m²

WMR
1.4 m² Finance
Photocopy Room
24.2 m²
7.4 m²
5 Off. Dir. 6
18.5 m² Riser
Social / Staff Breakout
1.3 m²
130.7 m²

R 16 I.T. Room
5.9 m²
Off. Dir. 7 Electrical Room HR
17.8 m² 13.3 m² 24.7 m²

Corridor Store
R 17 17.6 m² 9.6 m²
Off. Dir. 8 Store
S.E. Shaft
18.3 m² 2.4 m² 8.4 m²

L.P. Shaft Kitchen/Pantry


0.7 m² 11.6 m²
Fire Fight. Lift Lobby
R 18 Disposal 18.3 m²
6.8 m²
S.P. Shaft
Lift 5 2.4 m² Title
LPG 7.7 m²
Riser

(Fire Fight.) Lift 6 E


R 19 7.7 m² Scale 1:100 DO NOT SCALE
Drawn BR Designer GL

Stair Core 2 Drafting EB Design RC


Check Check
27.7 m²
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No.
Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:04 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.01.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

R 18
Office A C.
149.3 m²

D.
E.
Dis. WC
4.0 m²
Male WC
17.3 m² R 19
Office B
Female WC 119.1 m²
17.3 m²
1 CONTRACT ISSUE BR RC SH 16.12.15
Lift 1 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m²
Job Project
No. Revision Drawn Manager Director Date
LV Closet
Lift 3 ELV Closet 1.0 m²
Lobby 8.8 m² Stair Core 1 0.6 m²
20.1 m² 17.5 m²
Office C
Lift 2 102.0 m²
8.8 m²
R 20
Animal Hold Exh. Ducts
8.4 m²
Lift 4
Client
8.8 m²

Retail Exh. Ducts


4.4 m²

S.P. Shaft Office D


2.4 m²
136.1 m²
Corridor Corridor
FTC
Lobby 38.7 m² 2.1 m²
90.4 m²
4.7 m²
Female Prayer Room
24.4 m²
R 21
Ablution Area
7.4 m² Lobby Office F
Male Prayer Room 4.7 m² 145.0 m²
24.5 m²

Ablution Area
7.4 m²

Office E
265.6 m²
Office G
183.5 m²
WMR
1.3 m²
5
Riser
1.4 m²
I.T. Room
R 16 8.3 m²
Electrical Room
13.2 m²
Pantry
6.6 m²

R 17 Corridor
17.6 m²
S.E. Shaft
2.4 m²

Off. Exh. Ducts


L.P. Shaft
10.0 m²
0.7 m²
R 18 Disposal Fire Fight. Lift Lobby
6.7 m² 18.3 m²
S.P. Shaft
2.4 m²
Lift 5 Title
LPG
7.7 m²
Riser

(Fire Fight.) Lift 6


7.7 m²
E
R 19 Scale 1:100 DO NOT SCALE
Drawn BR Designer GL
Stair Core 2 Drafting Design
Check EB Check RC
27.7 m²
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No. Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:04 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.02.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

R 18
C.
Office A
149.4 m²

D.
E.

Dis. WC
Male WC 4.0 m²
17.3 m² R 19
Female WC Office B
17.3 m² 119.1 m²

1 CONTRACT ISSUE BR RC SH 16.12.15


Lift 1 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m²
Job Project
No. Revision Drawn Manager Director Date
ELV Closet
Lift 3 LV Closet
Redundant
8.8 m² Stair Core 1 1.0 m²
Room
Lobby 17.6 m²
20.1 m² Office C
Lift 2 102.1 m²
8.8 m²
R 20
Animal Hold Exh. Ducts
8.4 m² Corridor
Lift 4 11.2 m²
8.8 m²
Retail Exh. Ducts
4.4 m²

S.P. Shaft
2.4 m²
Office D
FTC
Corridor 136.1 m²
2.1 m²
90.4 m²

Office F
104.3 m²
R 21
Office G
145.0 m²

Office H
183.6 m²

WMR
1.3 m²

5
Riser Office E
1.4 m² 265.7 m²
I.T. Room
R 16 8.2 m²
Electrical Room
Pantry 13.2 m²
6.6 m²

R 17 Corridor
17.6 m²
S.E. Shaft
2.4 m²

Off. Exh. Ducts


L.P. Shaft
Fire Fight. Lift Lobby 0.7 m² 9.9 m²
Disposal
R 18 18.3 m²
6.7 m²

S.P. Shaft
Lift 5
2.4 m² Title
LPG 7.7 m²
Riser

(Fire Fight.) Lift 6 E


7.7 m²
R 19 Scale 1:100 DO NOT SCALE
Drawn BR Designer GL
Stair Core 2 Drafting EB Design RC
Check Check
27.7 m²
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No. Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:04 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.03.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

R 18
Office A C.
149.3 m²

D.
E.
Dis. WC
Male WC 4.0 m²
17.3 m² R 19
Female WC Office B
17.3 m² 119.1 m²

1 CONTRACT ISSUE BR RC SH 16.12.15


Lift 1 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m² ELV Closet
Job Project
0.7 m² No. Revision Drawn Manager Director Date
LV Closet
Lift 3 1.0 m²
Lobby 8.8 m² Stair Core 1
17.6 m² Office C
20.1 m² 102.1 m²
Lift 2 R 20
8.8 m² Animal Hold Exh. Ducts
8.4 m²
Corridor
Lift 4
11.2 m² Client
8.8 m²
Retail Exh. Ducts
4.4 m²

S.P. Shaft
2.4 m²
Corridor Office D
FTC 90.4 m²
136.1 m²
2.1 m²

Office F Office G
104.3 m² 145.0 m²
R 21

Office H
183.5 m²

WMR
1.3 m²

5 Riser Office E
1.4 m² 265.7 m²
I.T. Room
R 16 8.2 m² Electrical Room
13.2 m²
Pantry
6.6 m²

R 17 Corridor
S.E. Shaft 17.6 m²
2.4 m²

Off. Exh. Ducts


L.P. Shaft
10.0 m²
Fire Fight. Lift Lobby 0.7 m²
R 18 Disposal
18.3 m²
6.7 m²
S.P. Shaft
Lift 5 2.4 m²
7.7 m²
Title
LPG
Riser

(Fire Fight.) Lift 6 E


R 19 7.7 m²
Scale 1:100 DO NOT SCALE
Drawn BR Designer GL

Stair Core 2 Drafting EB Design RC


Check Check
27.7 m²
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No. Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:04 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.04.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

R 18
C.

Office A
149.3 m²

D.
E.

Male WC Dis. WC
17.3 m² 4.0 m²
R 19
Office B
Female WC
119.3 m²
17.3 m²

1 CONTRACT ISSUE BR RC SH 16.12.15


Lift 1 ELV Closet 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m² 0.7 m²
Job Project
No. Revision Drawn Manager Director Date
LV Closet
Lift 3 1.0 m²
Lobby
8.8 m²
20.1 m²
Office C
102.1 m²
Lift 2 Animal Hold Exh. Ducts R 20
8.8 m² 8.4 m²

Corridor
Lift 4 11.2 m²
Client
8.8 m² Stair Core 1
17.6 m² Retail Exh. Ducts
4.4 m²

Corridor
S.P. Shaft
2.4 m² 90.5 m² Office D
FTC 136.1 m²
2.1 m²

Office F R 21
104.3 m²

Office G
145.0 m²

Office H
183.6 m²
WMR
1.3 m²
5
Riser Office E
1.4 m² 265.7 m²
I.T. Room
R 16 8.2 m²
Electrical Room
Pantry 13.2 m²
6.6 m²

R 17 Corridor
S.E. Shaft
17.6 m²
2.4 m²

Off. Exh. Ducts


L.P. Shaft
Fire Fight. Lift Lobby 10.0 m²
Disposal 0.7 m²
R 18 6.7 m² 18.3 m²

S.P. Shaft
Lift 5 2.4 m² Title
LPG
Riser 7.7 m²

(Fire Fight.) Lift 6 E


R 19 7.7 m² Scale 1:100 DO NOT SCALE
Drawn BR Designer GL

Stair Core 2 Drafting EB Design RC


Check Check
27.7 m²
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No. Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:05 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.05.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

R 18
C.

Office A
149.3 m²

D.
E.
Dis. WC
Male WC 4.0 m²
17.3 m²
R 19
Office B
119.1 m²
Female WC
17.3 m²

1 CONTRACT ISSUE BR RC SH 16.12.15


Lift 1 LV Closet 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m² 0.7 m² Job Project
No. Revision Drawn Manager Director Date

Lift 3 ELV Closet


Lobby Stair Core 1 1.0 m²
8.8 m² Office C
20.1 m² 17.6 m²
102.1 m²
Lift 2 R 20
8.8 m²
Animal Hold Exh. Ducts
8.4 m² Corridor
Lift 4 11.2 m²
8.8 m²
Retail Exh. Ducts
4.4 m²

Corridor
S.P. Shaft Office D
2.4 m² 90.4 m²
136.1 m²
FTC
2.1 m²

Office F R 21
104.3 m²

Office G
145.0 m²

Office H
183.6 m²
WMR
1.3 m²
5
Riser Office E
1.3 m²
265.7 m²
I.T. Room
R 16 8.2 m²
Electrical Room
Pantry 13.2 m²
6.5 m²

R 17
S.E. Shaft
2.3 m²

L.P. Shaft Off. Exh. Ducts


Fire Fight. Lift Lobby 0.7 m² 10.0 m²
R 18 18.3 m²
S.P. Shaft
2.4 m²
Lift 5 Title
LPG
Riser 7.7 m²

(Fire Fight.) Lift 6 E


R 19 7.7 m² Scale 1:100 DO NOT SCALE
Drawn BR Designer GL
Drafting EB Design RC
Stair Core 2 Check Check
27.7 m²
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No. Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:05 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.06.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

Small Meeting Room


21.4 m²
Collaboration Area R 18
71.3 m²

Medium Meeting Room C.


28.9 m²

Kitchen
19.7 m²
Corridor
14.3 m²
D.
E.
Male WC Dis. WC
14.5 m² 4.0 m²

Lobby Shower Female WC


R 19
14.9 m² 2.2 m²
14.5 m²

Lab. Lobby 1
Shower 18.0 m²
1 CONTRACT ISSUE BR RC SH 16.12.15
Corridor 2.2 m²
Lift 1 18.7 m² 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m²
Job Project
No. Revision Drawn Manager Director Date
ELV Closet LV Closet Write-up Area (60)
Lift 3 0.7 m² 1.0 m²
Stair Core 1 238.2 m²
Lobby 8.8 m²
17.6 m²
22.5 m²

Lift 2 R 20
8.8 m²
Animal Hold Exh. Ducts
8.4 m²
Lift 4
8.8 m²
Retail Exh. Ducts
4.4 m²
Primary LAB. (60)
218.0 m²
S.P. Shaft
2.4 m² Tis. Cul. 1
FTC 20.3 m²
2.1 m² Tis. Cul. 2
Plant Room 20.3 m² Primary Lab. Service Corridor
93.3 m² 99.3 m²

Tis. Cul. 3
20.3 m²
R 21
Equip. Store
16.3 m²
Corridor
Centrifuge
48.0 m² 20.3 m²
P.A. Office
10.9 m²
P.I. Office Bac. Cul.
17.7 m² 20.3 m²

P.A. Office Equip. Room & Store


11.6 m² 17.0 m²

Cold Room WMR


P.I. Office 1.4 m²
10.7 m²
17.0 m²
5
Riser
I.T. Room 1.3 m² Large Meeting Room
P.A. Office
6.5 m² 41.6 m²
R 16 11.6 m²

Gas Cylinder Cupb. Electrical Room


1.5 m² 13.1 m² Lab Lobby 2
P.I. Office
12.4 m²
17.0 m²
Corridor
25.5 m²
R 17 Lab. Exh. Ducts
S.E. Shaft 29.8 m²
Dark Room Bioinformatics Suite
9.8 m² 34.7 m²
2.1 m²

L.P. Shaft
Disposal
Fire Fight. Lift Lobby 0.7 m²
R 18 6.8 m² 18.3 m²

S.P. Shaft
Lift 5 2.4 m² Molecular Bio. Analysis Title
LPG 7.7 m²
Riser 29.9 m²

(Fire Fight.) Lift 6 E


7.7 m²
R 19 Scale 1:100 DO NOT SCALE
Drawn BR Designer GL
Drafting EB Design RC
Stair Core 2 Check Check
27.7 m² Approved
(Project Director) SH
Date 05.03.2015

R 20 Drawing No.
Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:05 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.07.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

Small Meeting Room


21.4 m²
Collaboration Area
R 18
71.2 m²
Medium Meeting Room C.
28.9 m²

Kitchen Corridor
19.8 m²
14.3 m²
D.
E.
Male WC Dis. WC
14.5 m² 4.0 m²
Lobby
14.9 m² Shower Female WC
R 19
2.2 m² 14.5 m²

Shower Lab Lobby 1


Corridor 2.2 m² 18.1 m²
1 CONTRACT ISSUE BR RC SH 16.12.15
18.7 m²
Lift 1 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m²
Job Project
LV Closet No. Revision Drawn Manager Director Date
1.0 m²
Lift 3 ELV Closet Write-up Area (60)
Lobby Stair Core 1 238.2 m²
8.8 m² 0.7 m²
22.5 m² 17.6 m²

Lift 2 R 20
8.8 m²
Animal Hold Exh. Ducts
8.4 m²
Lift 4
Client
8.8 m²
Retail Exh. Ducts Primary LAB. (60)
4.4 m² 218.0 m²

Tis. Cul. 1
S.P. Shaft 20.3 m²
2.4 m²
FTC Tis. Cul. 2
2.1 m² 20.3 m² Primary Lab. Service Corridor
Plant Room
92.6 m² Tis. Cul. 3 99.2 m²
20.3 m²
R 21
Equip. Store
16.3 m²

Corridor Centrifuge
48.0 m² 20.3 m²

P.A. Office
10.9 m²
P.I. Office Bac. Cul.
17.7 m²
20.3 m²

P.A. Office Equip. Room & Store


11.6 m² 17.0 m² Cold Room
10.7 m²
P.I. Office WMR
17.0 m² 1.4 m²
5
Riser
P.A. Office I.T. Room 1.3 m²
Large Meeting Room
6.5 m²
11.6 m² 41.6 m²
R 16 Electrical Room
Gas Cylinder Cupb. 13.1 m²
Lab. Lobby 2
1.4 m² 12.4 m²
P.I. Office
17.0 m²
Corridor
R 17 25.5 m² Analytical Suite
S.E. Shaft Lab. Exh. Ducts
Dark Room 34.7 m²
2.1 m² 29.8 m²
9.8 m²

L.P. Shaft
Disposal Fire Fight. Lift Lobby 0.7 m²
R 18 6.7 m² 18.3 m²
S.P. Shaft
Lift 5 2.4 m²
7.7 m² Title
LPG
Stair Core 2 Radioactive Isotope Handling Rm.
Riser
27.7 m² 29.8 m²
(Fire Fight.) Lift 6 E
7.7 m²
R 19 Scale 1:100 DO NOT SCALE
Drawn BR Designer GL
Drafting EB Design RC
Check Check
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No.
Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:05 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.08.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

Small Meeting Room


21.4 m²
R 18
Medium Meeting Room C.
Collaboration Area 28.9 m²
71.2 m²
Kitchen
19.8 m² Corridor
14.3 m²
D.
Male WC Dis. WC E.
14.5 m² 4.0 m²
Lobby Shower
14.9 m² 2.2 m² Female WC
R 19
14.5 m²
Lab. Lobby 1
Shower 18.0 m²
1 CONTRACT ISSUE BR RC SH 16.12.15
Corridor 2.2 m²
Lift 1 19.0 m² 0 ISSUED FOR TENDER BR RC SH 17.09.15
8.8 m²
Write-up Area (60) Job Project
No. Revision Drawn Manager Director Date
LV Closet 238.2 m²
Lift 3 ELV Closet
Lobby Stair Core 1 1.0 m²
8.8 m² 0.7 m²
22.5 m² 17.6 m²

Lift 2 R 20
8.8 m²
Animal Hold Exh. Ducts
8.4 m²
Lift 4
8.8 m²
Primary LAB. (60)
Retail Exh. Ducts
4.4 m² 218.0 m²

S.P. Shaft
2.4 m² Tis. Cul. 1
20.3 m²
FTC Tis. Cul. 2
Plant Room 2.1 m² 20.3 m² Primary Lab. Service Corridor
92.6 m²
99.2 m²
Tis. Cul. 3
20.3 m² R 21
Cell Analysis
16.3 m²
Corridor
48.0 m²
P.A. Office
10.8 m² Centrifuge
20.3 m² Bac. Cul.
P.I. Office 20.3 m²
17.7 m²
Equip. Room & Store
P.A. Office 17.0 m²
11.6 m² Cold Room
WMR
10.7 m²
1.4 m²
P.I. Office
17.0 m²
5
Riser
I.T. Room 1.3 m²
P.A. Office
6.5 m²
11.6 m²
R 16 Electrical Room
Gas Cylinder Cupb. 13.1 m² Lab Lobby 2
1.4 m² 12.4 m²
P.I. Office
17.0 m²
Corridor Large Meeting Room
R 17 25.5 m² Lab. Exh. Ducts 41.6 m²

Dark Room S.E. Shaft 29.8 m²


9.8 m² 2.1 m²

L.P. Shaft
Fire Fight. Lift Lobby Electrophysiology Suite
0.7 m²
R 18 Disposal 18.3 m² 34.7 m²
6.7 m²
S.P. Shaft
Lift 5 2.4 m²
7.7 m² Imaging Suite Title
LPG
29.8 m²
Riser

(Fire Fight.) Lift 6


7.7 m²
E
R 19 Scale 1:100 DO NOT SCALE
Drawn BR Designer GL
Drafting EB Design RC
Stair Core 2 Check Check
27.5 m² Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No. Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:05 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.09.01.dwg
R 16 KEY PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24

M
R 15
N

R 15
O
R 16

EE
FFL_0.00m
1 R 17
2
P
R 18

FF R 19

POTENTIAL
FUTURE R 20
LINK

GG

DN
R
R 21

R 17 R 15 R 22

R 16

R 17

R 18

LPG
Riser

EE
R 19
3
R 20
FF

R 21

GG

R 22

EE
GENERAL NOTES

R 18
C.

D.
E.

Electrical Room
R 19
12.7 m²

1 CONTRACT ISSUE BR RC SH 16.12.15

LCC LV Closet 0 ISSUED FOR TENDER BR RC SH 17.09.15


0.9 m² 0.8 m² Job Project
No. Revision Drawn Manager Director Date

LCC ELV Closet


0.8 m² 0.6 m²

LCC
0.8 m² R 20
Boiler Room
49.1 m² Animal Hold Exh. Ducts
LCC 9.5 m²
0.9 m² Stair Core 1
17.6 m² Client

Retail Exh. Ducts


5.0 m²

S.P. Shaft
4.7 m² Plant Room
907.6 m²
Compr. Air/Vacuum Pump R.m
26.4 m²

Telecom GSM Room


9.3 m²
R 21

R 16
Lab. Exh. Ducts LCC
59.6 m² 1.1 m²
LCC
R 17 1.1 m²
S.E. Shaft
1.9 m²

L.P. SHaft
Fire Fight. Lift Lobby 0.7 m²
R 18 18.9 m²

S.P. Shaft
Lift 5 2.4 m² Title
LPG
Riser 7.7 m²

(Fire Fight.) Lift 6


Terrace
E
R 19 7.7 m² Stair Core 2 Scale 1:100 DO NOT SCALE
19.0 m² 399.9 m²
Disposal Drawn Designer
BR GL
Shoot
Vent Drafting Design
Check EB Check RC
Approved
(Project Director) SH
Date 08.04.2015

R 20 Drawing No. Original Size

FF A1
GG R 22 CONTRACT Rev. 1
Plot Date: 11 December 2015 - 5:06 PM Plotted by: Anthony Trimocha Cad File No: R:\00-Projects\R10223 - Al Jalila\01 - Drawings\01 - Mech\56-LTHW\M.56.G.10.01.dwg

Das könnte Ihnen auch gefallen