Project : Improvement of Cabacungan Road to Malalag Tubig (FMR), Malalag, Davao Del Sur
(Number) (Name) (City Province)
Kinds of Materials : Excavated Materials Location : ( A ) Sta. 1+440.00 L/L @ 1.00 m. from edge of proposed
Specs Item No. : 200 ( B ) Sta. 1+485.00 L/L @ 1.2 m. from edge of proposed
Test Hole Depth : 15 cm ( C ) Sta. 1+485.00 L/L @ 1.4 m. from edge of proposed
Representing : 1st 15 cm
(Layer No.) (Depth) (Station to Station)
Tested By : ROLANDO B. ALIGWAY, JR./LAB. TECH. I 1st DEO - DIGOS CITY September 2, 2014
(Name and Designation) (Office)
Computed By : ROLANDO B. ALIGWAY, JR./LAB. TECH. I 1st DEO - DIGOS CITY September 2, 2014
(Name and Designation) (Office)
Laboratory No. : 200 - D - ABC
ROLANDO B. ALIGWAY, JR. JACK CONTIVEROS, C.E HERA A. TORMIS AMPARO M. CLAR
Laboratory Technician I Municipal Engineer Office Engineer ll Engineer lll
DPWH, Digos City Malalag, Davao Del Sur Asst. Chief, QA Section Chief, Quality Assurance S
DPWH, Digos City DPWH, Digos City
Test Hole Depth : 20 cm ( C ) Sta 1558 + 240 R/S @ 8.50m from edge of existing P
Representing : 1st 20 cm
(Layer No.) (Depth) (Station to Station)
Tested By : Michael U. TE / Materials Engineer TKS BUILDERS & SUPPLIES January 4, 2014
(Name and Designation) (Office)
Computed By : Michael U. TE / Materials Engineer TKS BUILDERS & SUPPLIES January 4, 2014
(Name and Designation) (Office)
Laboratory No. : 103(6) - D-2 ABC
FIELD DENSITY A B
18. Total materials taken from the hole, kg. 6.412 6.507
19. Mass of Jar + Sand, Kg. 8.764 8.766
20. Mass of Jar + Sand, Kg. (after pouring) 3.072 3.027
21. Sand to fill hole hole, Kg. (19) - (20) - (10) 4.262 4.309
22. Volume of hole, Kg. (21) / (7) 0.003243 0.003278
23. Wet unit weight, Kg./cu.m. (18) / (22) 1977.41 1984.82
24. Dry unit weight, Kg./cu.m. (23) / [1+ {(17)/100} ] 1803.88 1809.15
25. Laboratory Compaction Test Data:
a. Maximum Dry Density, Kg. / cu.m. 1879 kg./cu.m.
b. Optimum Moisture Content, % 9.90 %
26. Degree of Compaction, % [(24) / (25a)] x 100 96.00% 96.28%
27. Required Degree of Compaction, % 95%
(width)
September 2, 2014
(Date)
September 2, 2014
(Date)
8.880
7.450
1.430
Using Speedy
Moisture Tester
8.20
C
3.661
7.711
4.136
2.145
0.001632
2243.31
2073.30
101.14%
AMPARO M. CLAR
Engineer lll
Chief, Quality Assurance Section
DPWH, Digos City
(width)
January 4, 2014
(Date)
January 4, 2014
(Date)
8.880
7.450
1.430
9.80
C
6.536
8.838
3.077
4.331
0.003295
1983.54
1806.50
96.14%
AMPARO M. CLAR
Engineer lll
Chief, Quality Assurance Section
FIELD DENSITY TEST REPORT
Project :
Representing : 1st -
(Layer No.) (Depth) (Station to Station)
Tested By :
(Name and Designation) (Office)
Computed By :
(Name and Designation) (Office)
Laboratory No. :
FIELD DENSITY A B
18.Total materials taken from the hole, kg. 7.500 5.900
19.Mass of Jar + Sand, Kg. 8.200 8.800
20.Mass of Jar + Sand, Kg. (after pouring) 2.400 3.800
21.Sand to fill hole hole, Kg. (19) - (20) - (10) 4.526 3.726
22.Volume of hole, Kg. (21) / (7) 0.003163 0.002604
23.Wet unit weight, Kg./cu.m. (18) / (22) 2371.23 2265.88
24.Dry unit weight, Kg./cu.m. (23) / [1+ {(17)/100} 2175.44 2117.64
25.Laboratory Compaction Test Data:
a. Maximum Dry Density, Kg. / cu.m. 2080
b. Optimum Moisture Content, %
26.Degree of Compaction, % [(24) / (25a)] x 100 104.59% 101.81%
27.Required Degree of Compaction, % 100%
-
Station) (width)
March 22, 2018
e) (Date) s
March 22, 2018
e) (Date)
L FUNNEL
10.189
9.006
1.274
B C
7.00 7.20
B C
5.900 5.700 0.000
8.800 9.000 OK 0.000
3.800 4.000 0.000
3.726 3.726
0.002604 0.002604
2265.88 2189.07
2117.64 2042.04
kg./cu.m. S
%
101.81% 98.17%
100%
AMPARO M. CLAR
Engineer III
Chief, QA Section