Sie sind auf Seite 1von 3

pt.

duta excellindo utama


page 2

PROPOSAL FOR EXHAUST SYSTEM SERVICING


AT ROYAL TULIP GUNUNG GEULIS

This proposal is of PT. DUTA EXCELLINDO UTAMA to provide for the service and
cleaning of the exhaust ducting system at ROYAL TULIP GUNUNG GEULIS.

KITCHEN

a. Destain and clean both interior and exterior of s/s exhaust hoods.
b. Clean and destain all existing grease filters.
c. Provide multiple access panels to enable cleaning of internal ductworks.
d. Degrease and decarbonise existing interior exhaust duckworks.
e. Repair minor corrosion if any not exceeding 0,5 x 0,5 meter
f. Anto corrosion treatment on all exiting interior duckworks.
g. Seal all possible leakage areas.
h. Clean and service one unit exiting exhaust fan.

LOCATION

MAIN KITCHEN

TOTAL COST:

Cost Of Material : Rp. 5.625.000,-


Cost Of Man Power : Rp. 1.875.000,- +
TOTAL : Rp 7.500.000,-
PPN 10% : Rp 750.000,- +
GRAND TOTAL : Rp 8.250.000,-

TERMS AND CONDITION:

a. Availability : Two weeks from receipt of purchase order of work


order

b. Working hours: Off operational hours 21.00 PM – 05.00 AM

c. Duration of work : 1 – 2 nights

d. Man Power : 5 Men + 1 Supervisor + 1 Technical Manager

e. Guarantees : PT. Duta Excellindo Utama will guaranteed all job are
satisfactorily carried out, with full photographic report /
check list duty signed and verified by the duty
engineers.

…3/
pt. duta excellindo utama
page 3

f. Report / checklist : Photographic report /checklist, submitted by PT. Duta


Excellindo Utama shall signed by duty engineer to verify
work is done to the satisfaction of Royal Tulip Gunung
Geulis.

g. Terms of payment : Upon completion of every job.

PT. Duta Excellindo Utama will provide all the cleaning tools and equipment such as :

Equipment Used :
a. High pressure
b. Wet and dry pick up
c. Electric winch (for vertical ducts above 3 meters)
d. Majun etc

Chemical Used :
e. Degrease : Heavy degreasing and decorbonising agent
f. MPC : A multi purpose cleaner
g. Sparkle : Neutral-based detergent
h. P.S.I : Bitumen and rubberize sealer
i. Procoat : Anti corrosion coating

Prepared by :
Evi R. Simanungkalit
DUTA excellindo utama, p.t.
Gandaria 8, Lt 002 B, Gandaria City
Jl Sultan Iskandar Muda. Kebayoran Lama
Phone: (021) 29036470
Fax: (021) 29036361
e-mail: duta88@hotmail.com

FAX TRANSMITTAL
Date : 28 November 2016
Ref : 14329/XI/16/DEU
To : Bapak Nano
Email : ce@rtgununggeulis.com
Company : Royal Tulip Gunung Geulis
From : Evi R. Simanungkalit
No of page : 3 (Three)

Following to your request, we are pleased to submit our proposal and quotation for the
exhaust ducting system cleaning and maintenance service for your consideration.

We trust that the enclosed proposal meets with your expectation and we look forward to
hearing from you soon.

Thank you for your kind attention.

Regards,
Evi. R. Simanungkalit

Das könnte Ihnen auch gefallen